Tender For Mtps-Ii - Tgm&Ca Division - Inspection & Cleaning Of Hp/Lp Bypass Oil Tank, Overhauling Of Hp/Lp Bypass Oil Station Pump, Actuators Of Hp Bypass Control Valve & Lp Bypass Control Valve -A During Capital Overhauling - 2026.
Tender Overview
Project Description
Tender for Mtps-Ii - Tgm&Ca Division - Inspection & Cleaning Of Hp/Lp Bypass Oil Tank, Overhauling Of Hp/Lp Bypass Oil Station Pump, Actuators Of Hp Bypass Control Valve & Lp Bypass Control Valve -A During Capital Overhauling - 2026.
BOQ
| Sl. No. | Item Description |
| 1 | Inspection and Cleaning of HP/LP Bypass Oil Tank: Charges for draining the Fire resistance Fluid from the HP/LP Bypass Oil Tank by opening the man hole door, Cleaning the filter, inner & Outer surface of the Oil tank,Oil lines by solvent,Atta,Gada cloth,inspection of the HP/LP Bypass Oil Tank, checking all connected lines and valves and attend the oil leak if any, closing the manhole doors etc including the cost of consumables and T&P charges. |
| 2 | Charges for filling the Fire resistance Fluid to HP/LP Bypass Oil Tank and charging the Power pack with Fire resistance Fluid, conducting trial run, checking pressure development &checking all connected lines and valves, attend the oil leak if any and normalizing including the cost of consumables and T&P charges. |
| 3 | Inspection,Overhauling & Replacement of HP/LP Bypass Oil Pump: a) Charges for Complete dismantling of the HP/LP Bypass oil pump internals stage by stage including bearing, bush, piston etc. |
| 4 | b) Charges for replacement of damaged internals like Shaft, Rotating Group, Bearing kit and seal kit etc. (Seal Kit are to be supplied by the contractor) |
| 5 | c) Charges for assembling the pump including alignment and checking of trial run. |
| 6 | Dismantling of the Complete Hydraulic actuator assemblies of HP Bypass control valve & LP Bypass Control Valve 'A': Charges for Moving the Piston into the bottom end position, Releasing of oil pressure from oil system, Disconnecting all connector and Hydraulic hoses from actuator, Removal of coupling locker & feedback linkage on coupling, Decoupling the piston rod from valve stem, Loosening and removing screw connection Actuator Yoke – Valve and lifting of the actuator from the valve by using the special fixture, Removing the complete Actuator unit from the HP Bypass control valve & LP Bypass Control Valve 'A' by using the special fixture including the cost of High pressure Hose assembly,consumables & T&P’S. |
| 7 | b. Overhauling of actuators of HP Bypass control valve & LP Bypass Control Valve 'A'. Charges for Repairing/replacement of the wornout/damaged parts of HP/LP Bypass control valve and Re-Assembling of all the parts in the correct sequence with new seal kit, O Rings, gaskets and damaged hoses etc in the actuator including the cost of High pressure Hose assembly,consumables & T&P’S. |
| 8 | Fixing of Complete Actuator assembly of HP Bypass control valve & LP Bypass Control Valve 'A': Charges for fixing the complete actuators assembly to position by using special fixture coupling the piston rod from valve stem, tighten the screw connection in actuator you and valve, connection the hydraulic hoses and commissioning of the actuators. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender