Tender For Refurbishment Of Fibre Optic Network Based Cctv Surveillance System For Dae Kalpakkam Complex.
Tender Value
6.83 Crore
Estimated cost
Bid Submission
26 Nov 2026
24 days left
EMD
13.70 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chengalpattu → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Refurbishment Of Fibre Optic Network Based Cctv Surveillance System For Dae Kalpakkam Complex.
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork excavation(trenches) by manual means for laying conduits and cables, including excavation, dressing of sides, ramming of bottoms, disposal of excavated material within the specified lead, and all incidental works, complete in accordance with Section 2.0 of Annexure-I to Subsection 5 of Section V of the Technical Specifications. |
| 2 | Road cutting of size 300 mm wide × 300 mm deep, excavation, laying of GI conduits, backfilling, and restoration of the road surface with concrete up to the existing road level, including all materials, labour, tools, equipment, and incidental works, complete in accordance with Section 3.0 of Annexure-I to Subsection 5 of Section V of the Technical Specifications. |
| 3 | Providing and erecting trench route markers at specified locations, including all materials, labour, excavation, fixing, concreting, painting, lettering, and incidental works, complete in accordance with Section 4.0 of Annexure-I to Subsection 5 of Section V of Technical Specifications |
| 4 | Providing, laying, and installation of 40 mm dia. PLB HDPE conduits complete with all required leak-proof / leak-tight accessories, executed strictly in accordance with Section 5.0 of Annexure-I under Subsection 5 of Section V of the Technical Specifications. |
| 5 | Providing, laying, drawing, and end-termination of 9/125 micron Single Mode Armoured 8-Core Optical Fibre Cable (OFC) through HDPE conduits, including testing and commissioning, submission of certified OTDR test reports, splicing reports, and fibre trace reports for all cores, complete in all respects and executed strictly in accordance with Section 6.0 of Annexure–I to Subsection 5 of Section V of the Technical Specifications |
| 6 | Providing, laying, routing, and end-termination of FRLS Armoured, double-sheathed 3.5 Core × 2.5 Sq. mm Power Cable, including fixing of glands, lugs, termination, and connection works, complete in all respects and executed strictly in accordance with Section 7.0 of Annexure–I to Subsection 5 of Section V of the Technical Specifications |
| 7 | Providing, drawing, and termination of CAT6 double-jacketed outdoor cable inside HDPE conduits, including punching, RJ45 crimping, I/O module termination, continuity testing, and all incidental works, complete in all respects, as per Section 8.0 of Annexure–I to Subsection 5 of Section V of the Technical Specifications. |
| 8 | Casting of reinforced cement concrete foundation of size 450 × 450 × 900 mm, including excavation, shuttering, reinforcement, concreting, curing, and all associated civil works, followed by providing, installation, alignment, and erection of a 5.0 m high pole, complete in all respects and executed strictly in accordance with Section 2.0 of Annexure–II to Subsection 5 of Section V of the Technical Specifications. |
| 9 | Providing, installation, testing, and commissioning of wide-range bullet camera complete with all necessary accessories on newly erected or existing pole, including mounting, alignment, connections, complete in all respects and executed strictly in accordance with Section 3.0 of Annexure–II to Subsection 5 of Section V of the Technical Specifications. |
| 10 | Providing, installation, testing, and commissioning of PTZ Camera complete with all necessary accessories on pole, including mounting, alignment, interconnections, and associated works, complete in all respects and executed strictly in accordance with Section 4.0 of Annexure–II to Subsection 5 of Section V of the Technical Specifications. |
| 11 | a. Providing and erection of junction box stand on concrete foundation, including alignment, fixing, anchoring, and all associated incidental works, complete in all respects, as per Section 2.0 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 12 | Providing, installation, configuration, testing, and commissioning of Industrial Grade 8-Port Managed Switch complete with suitable SFP modules, power adapters, and all associated accessories at field Junction Box (JB) locations, including integration and connectivity works, complete in all respects and executed strictly in accordance with Section 3.0 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 13 | Providing, installation, configuration, testing, and commissioning of Intelligent Gigabit Layer-3 Switch comprising 16 × 100/1000 SFP ports, 8 Combo ports, 4 × 10G SFP+ ports with dual Power Supply Units (PSUs) in the Electronics Room, including integration, connectivity, and associated works, complete in all respects and executed strictly in accordance with Section 4.0 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 14 | Providing, installation, integration, testing, and commissioning of passive network components at designated locations within the Field Junction Boxes (JBs) and Electronics Rooms, including all associated accessories and connection works, complete in all respects and executed strictly in accordance with the list specified under Section 5.0 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 15 | Providing, installation, and commissioning of 25 mm dia. corrugated steel strengthened flexible nylon conduit of 2 mm thickness for protection and covering of cable openings wherever required, including all associated accessories and fixing works, complete in all respects and executed strictly in accordance with Section 6.0 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 16 | Providing, installation, testing, and commissioning of Power Line Surge Protection Device (SPD) at Field Junction Box (JB) locations, including mounting, termination, integration, and all associated connection works, complete in all respects and executed strictly in accordance with Section 7.1 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 17 | Providing, installation, testing, and commissioning of Data Line Surge Protection Device (SPD) at Field Junction Box (JB) locations and camera end locations, including mounting, termination, integration, and all associated connection works, complete in all respects and executed strictly in accordance with Section 7.2 of Annexure–III to Subsection 5 of Section V of the Technical Specifications. |
| 18 | Providing, installation, configuration, testing, and commissioning of Video Processing Unit equipped with high-performance graphics cards in Control Rooms, including integration, connectivity, and all associated accessories and works, complete in all respects and executed strictly in accordance with Section 2.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 19 | Providing, installation, and commissioning of Fault Monitoring System, including configuration, integration, and all associated works, complete in all respects, as per Section 3.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 20 | Providing, installation, and commissioning of Time Synchronization System, including configuration, integration, and associated works, complete in all respects, as per Section 4.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 21 | Providing, installation, configuration, testing, and commissioning of Video Display Systems, including integration, connectivity, mounting with all associated accessories, complete in all respects and executed strictly in accordance with Section 5.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 22 | Providing, installation, configuration, testing, and commissioning of Core Surveillance Processing Unit complete with camera licenses for 200 channels and high-density storage arrays configured to support a minimum video retention period of 90 days, including system integration, storage configuration, connectivity and associated work, complete in all respects and executed strictly in accordance with Section 6.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 23 | Providing, installation, configuration, testing, and commissioning of Redundant Core Surveillance Processing Unit complete with secondary high-density storage arrays configured to support a minimum video retention period of 30 days for 50 cameras including implementation of automated failover and seamless system switchover functionality without data loss, along with system integration, storage configuration, connectivity, and associated works, complete in all respects and executed strictly in accordance with Section 7.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 24 | Providing, installation, configuration, integration, and commissioning of Enterprise Video Management Suite comprising core video management, video recording, and advanced video analytics software modules, including all associated software and integration works, complete in all respects, as per Section 8.0 of Annexure–IV to Subsection 5 of Section V of the Technical Specifications. |
| 25 | Providing, installation, testing, and commissioning of comprehensive Electrical Earthing System at the Master Control Room (MCR) and Auxiliary Control Room (ACR), including excavation, soil conditioning, earth electrode installation, rod driving, earth grid interconnection, measurement and testing of earth resistance values, and all associated civil and electrical works, complete in all respects as per Section 2.0 of Annexure–V to Subsection 5 of Section V of the Technical Specifications. |
| 26 | Providing, installation, testing, and commissioning of dedicated Maintenance-Free Earthing Pits at Field Junction Box (JB) locations, including excavation, installation of grounding electrodes, application of earth enhancement compounds, construction of inspection chambers with covers, earth grid bonding, and all associated civil and electrical works, complete in all respects asper Section 3.0 of Annexure–V to Subsection 5 of Section V of the Technical Specifications. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.