Tender For Widening And Strengthening Work Of Ahorwa Bhawani-Kaithanpurwa-Hazariganj-Tedhai Road (Other District Road) From Km 9.00 To Km 13.500 (Including 5 Years Of Maintenance)
Tender Overview
Project Description
Tender for Widening And Strengthening Work Of Ahorwa Bhawani-Kaithanpurwa-Hazariganj-Tedhai Road (Other District Road) From Km 9.00 To Km 13.500 (Including 5 Years Of Maintenance)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Nov-2026 | Corrigendum Date | Date | 13-Nov-2026 |
| 2 | 12-Nov-2026 | Date | Date | 20-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. The rate includes royalty as per applicable to make embankment 12m wide, width may very at curves patries. including quantity for filling of drain type trenches along the base of road embankment as they were duged for making embankment previously.embankment width 12M side slope 1:2 New Including Royality Machenically Compacted. |
| 3 | Scraping of old painted surface including disposal of all Scraped material to distance of 30M (100 ft.) as directed by Engineer-in-charge.Sch.Pwd 772. |
| 4 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., |
| 5 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 30 mm thick compacted bed of coarse sand .. |
| 6 | Construction of granular sub-base (Grade-III) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 7 | Providing, laying and spreading Material on a prepared Sub base, adding cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 9 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement, over a prepared sub base, with approve grade cement @ 400 kg. per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with fixed form or slipform paver, spread, compacted and finished in a contiuous operation including provision of contraction expension, construction and longitudinal joint, joint filler separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compund, finishing to lines and grades as per drawing. |
| 10 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 11 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 12 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects |
| 13 | Earth Work in ordinary soil in makin patries on either side of the road earthwork in patries to be done in 20 cm layer including ramming and dressing the surface to required lavel and true to patri template with side slope of 1:2. (Mechanically Compacted) |
| 14 | Construction of U- Type Drain Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. S.I. 251 |
| 15 | Cement concrete with 4 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. S.I. 280 |
| 16 | Providing plain/ Reinforced Cement Concrete in U-Tpye Drain as per Drawing and Technical Specifications S.I. 283 |
| 17 | Mild steel or iron in plain work such as reinforeed concretc or reinforeed brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of ass steel and wastage and over lapping & hooks. S.I. 504. |
| 18 | Construction of H.P. culverts 900mm dia NP3 H.P.Excavation in foundation in ordinary soil including lift 1.5mt and lead up to 30M and including filling, filling, watering, ramming of excavation earth and also complete with all respect. |
| 19 | Concrete with 4cm gauge brick ballast Coarse sand and cement in proportion (10:5:1) in foundation and under pipes including supply of all material, labour T&P etc. required for propr completion of the work as per Sor No.4.1.10 |
| 20 | 150 Class B/W in (1:4) cement and fine sand 1.25 finess modelus in error in foundation and plinth including supply of all materials, labour T&P etc. complete as per SOR No.6.1.1 |
| 21 | Supply of 900 mm NP3 Hume Pipe and its coller including cartage etc. complete. |
| 22 | Layaing of 900mm dia NP3 Hume Pipe in proper posistion and joining them with coller and filling of jute and cement mortar in 1:2 cement and sand complete. |
| 23 | Rulled Pointing with cement mortal (1:2) consisting one part of cement and two part of fine sand including supply of all materials, labour T&P etc complete as per S.L.No. 574 |
| 24 | Making coping at the top end of parapet of culvert in 1:2:4 Cement and C. sand and stone grit as cost of cement concrete indoor sills shoukhat, boundary parts etc. as per S.L.No. 279(1b) |
| 25 | Providing & Laying of Brick bats upto Half depth arround pipes as per Sl. No.-2 Material & S.L.- 255 |
| 26 | Construction of Box Cell CulvertExcavation in foundation in in black cotton soil requring the use of special tools and plant such as pickaxes / sabbals etc. including lift up to 1.5m and lead up to 30m (100 ft) and including filling. Watering and ramming of excavated earth in to the trenches or in to the space between the structure and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer– in–charge up to distance of 30.00 m (100 ft) from the foundation trenches (S.L. No. 252) |
| 27 | Plain/Reinforced Cement Concrete -M 15 in Open Fondation complete as per Drawing and Technical Specifications. |
| 28 | Pier- II stepClass- 150 brick work in 1:4 cement and coarsesand of 2.8 fineness modulus mortar in foundation and plinth including supply of all materials labour and ltools and pants etc. required for proper completion of the work. |
| 29 | Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200) |
| 30 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick ref. to DAR 5.9.5 & Directed by Eng-in-Charge. |
| 31 | Plain/Reinforced Cement Concrete M-30 for wall & slab etc. complete as per Drawing and Technical Specifications. |
| 32 | Supply of TMT bar for RCC work including straightening , Cutting, bending, placing in position and binding all complete work as per SI No. 5.22.6 & Directed by Eng-In-Charge. |
| 33 | Stuck pointing with cement and fine sand of 1.25 fineness modulus morter on stone work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. |
| 34 | Filling Granular Material as filler material between roadcrust and abutment |
| 35 | 05 year Maintenance cost 02 Year Maintenance cost @ 0.25% on construction cost |
| 36 | 05 year Maintenance cost 03 Year Maintenance cost @ 0.50% on construction cost |
| 37 | 05 year Maintenance cost 04 Year Maintenance cost @0.75% on construction cost |
| 38 | 05 year Maintenance cost 05 Year Maintenance cost @ 1.00% on construction cost Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender