Drinking Water Supply and Sanitation Government Departments Closing in 27 days TDR #58248691

Tender For All In One Bid For Re-Excavation Of Sarbasukha Wds At Mouza - Sarbasukha , Ramjibanpur , J.L. No. 24,16 , Plot No. 4672, 6551, G.P. - Ramjibanpur Under Chandrakona- I Block In District Paschim Medinipur Under Core-Sector Programme 26-27.

Issued by Government Departments · Medinipur West, West Bengal
Tender Value
41.52 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
27 days left
EMD
83048
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Medinipur West → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for All In One Bid For Re-Excavation Of Sarbasukha Wds At Mouza - Sarbasukha , Ramjibanpur , J.L. No. 24,16 , Plot No. 4672, 6551, G.P. - Ramjibanpur Under Chandrakona- I Block In District Paschim Medinipur Under Core-Sector Programme 26-27.

BOQ

Name of Work:- ALL IN ONE BID FOR RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.
Sl. No. Item Description
1EARTHWORK EXCAVATION OF RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.(See the sheet WDS)
2CONSTRUCTION OF STAIR CASE OF RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.(See the sheet STAIR CASE)
3FORMATION OF WATER USERS' ASSOCIATION (WUA) FOR RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.(See the sheet WUA) Please Enable Macros to View BoQ information
4EARTHWORK EXCAVATION OF RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.
5Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc and depositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making arrangement for bailing out of any seepage water and removal of sand or soil blown from underneath, all complete. (Measurement : Pre-work and Post-work level section. Pre-work section to be taken after removal of water hyacinth and all other floating materials etc.)(b) By mechanical means using hydraulic excavators within an initial lead of 30 M and an initial lift of 3.0 M
6Extra rate for additional lead of earthwork in item Nos. 1.11 & 1.12 above.(a) Each additional lead of 15 M or part thereof beyond 30 M up to 90 MNo. of Lead = {(90-30) m / 15 m} = 4 Nos. , Then Rate for Lead = 4*(Rs. 11.00 / Lead) = Rs. 44.00
7(b) Each additional lead of 15 M or part thereof beyond 90 M up to 210 MNo. of Lead = {(210-90) m / 15 m} = 8 Nos. , Then Rate for Lead = 8*(Rs. 3.00 / Lead) = Rs. 24.00
8(c) Each additional lead of 15 M or part thereof beyond 210 M up to 510 MNo. of Lead = {(510-210) m / 15 m} = 20 Nos. , Then Rate for Lead = 20*(Rs. 3.00 / Lead) = Rs. 60.00
9Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge. (Payment will be made on the basis of Pre-work & Post-work level)
10Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope, crest berm etc. of embankments, canals and drainage channels etc. within a lead of 150 metre and all lifts including fine dressing, watering, ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only).
11Supplying ,loading ,unloading Class NP 2 RCC spun pipe as per specification including freight charges A) 30 cm bore dia , 2.5 m length.
12Supplying ,loading ,unloading Class NP 2 RCC collar as per specification including freight charges A) 30 cm bore dia
13Laying of R.C.C. pipe with collar, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound,filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge. 30 cm dia.
14Supplying, fitting and fixing including transportation of sign board for identifying the exact location of scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C. Sub-Total Rs. Add GST @ 18% Sub-Total Rs. Labour welfare Cess @1% Grand Total Rs. Say Rs
15CONSTRUCTION OF STAIR CASE OF RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.
16Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kind of soil
17Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete
18Providing and laying 75 mm thick brick flat soling with common burnt clay F.P.S. non-modular bricks of class designation 7.5, laid closely over prepared and levelled subgrade, joints filled with sand, including watering, dressing, ramming and finishing to required line, level and slope, complete.
19Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 5.1.2 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)
20Centering and shuttering including strutting, propping etc. and removalof form work for :4.3.1 Foundations, footings, bases for columns
21Steel Reinforcement for RCC work includiung straightening,cutting,bending andplacing in proper position and binding all complete upto plinth level 5.22.1 Mild steel and Medium Tensile steel Bar
2215 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand .(i) With 1:6 cement mortar(c) 15 mm thick plaster
2315 mm cement plaster on rough side of single or half brick wall finishedwith a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand)
24Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
25Providing Retro-reflective regulatory sign board of size 900 mm dia metre made out of 2 mm thick aluminium sheet, face to be fully covered with high intensity encapsulated lens type retro -reflective sheeting as approved by Engineer-in-charge . Letter, symbols, borders etc. will be as per IRC - 67 with required colour scheme on the boards and with the high intensity grade A. The aluminium sheet to be riveted to M.S. frame of angle iron of size 40x40x4 mm. The boards will be fixed to 1 No. 50x50 mm square post made of M.S. angle 50x50x4 mm, 4 m long welded to the frame with adequate anti-theft arrangement .Sheet work to be painted with two or more coats of synthetic enamel paint over an under coat (primer) and back side of aluminium sheet to be painted with two or more coats of epoxy paint including appropriate priming coat complete in all respects as per direction of Engineer-in-charge.
26Sub-total
27Modified Estimated cost after using correction factor on DSR 2023 on account of GST @ 0.973 as per Office Memorandum vide e file No. :9158977, File No.- 158/SE (TAS)/GST/2024/02-E, Dated - 08.08.2024 of the Superintending Engineer (TAS) of CPWD (Total Amount- x 0.973
28Cost indices of Paschim Medinipore as on 01.10.2025 based on DPAR 2025 (Base 100) is 109 as per Office Memoramdum vide Memo No.- 34(1)/SDG(Kol)/Cost Index/2026/915, dated - 19.05.2026 of CPWD, Government of India. Hence the total cost of the scheme is -{(Total Amount x 0.973)x1.09} Grand Total Rs. Say Rs BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer (A-M), Kolkata (A-M) Resources Circle, Kolkata Name of Work:-ALL IN ONE BID FOR RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27. Contract No: WBWRDD/SE (AM) /Res. Circle/e-NIT-64 (Sl. No. 03)/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) SL No Description of Item Qty Unit Rate Amount(Rs.) DETAILED ESTIMATE FOR FORMATION OF WUA OF RE-EXCAVATION OF SARBASUKHA WDS AT MOUZA - SARBASUKHA , RAMJIBANPUR , J.L. NO. 24,16 , PLOT NO. 4672, 6551, G.P. - RAMJIBANPUR UNDER CHANDRAKONA- I BLOCK IN DISTRICT PASCHIM MEDINIPUR UNDER CORE-SECTOR PROGRAMME 26-27.
29Campaigning in the command area of Mini RLI Sub-project by community workers for mass awareness , capacity building to achieve sustainability of Sub-projects. Cost include wage payment to community workers, transportaton, leaflet etc.
30Demarcation of command area, selection of beneficiaries and preparation of land schedule within the Command area of one WHT/WHR/RWHT/WDS
31Meeting Cost for WUA formation, cost induding Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental changes.
32Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, œnveyance cost & opening of Bank A/C etc.
33Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to communlty worker, remuneration to resource person and incidental charge.(rate on meeting )
34Meeting and onsite demonstration for operation & maintenance of one Mini RLI, water manangement and mode of collection of water tax, building of corpus fund etc.
35IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 2 & SL - 4.
36Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.
37Impact study & monitoring of scheme by site visit of 2 Community workes during 3 years’ period. Grand Total Rs. 16225.0 Say Rs. 16225.0

AI Tender Summary

OUR REF NO 58248691
AUTHORITY Government Departments
TENDER VALUE 41.52 Lakhs
LAST DATE 25-11-2026
Authority
Authority Name Water Resources Department
Work Description Tender for All In One Bid For Re-Excavation Of Sarbasukha Wds At Mouza - Sarbasukha , Ramjibanpur , J.L. No. 24,16 , Plot No. 4672, 6551, G.P. - Ramjibanpur Under Chandrakona- I Block In District Paschim Medinipur Under Core-Sector Programme 26-27.
Basic Detail
Tender No WBWRDD/SE (AM)/Res Circle/eNIT-64(Sl. 1 to 4)/2026-27
Bidding Type Tender
Location
City Medinipur West
State West Bengal
Key Dates
Publish Date 28 Oct 2026
Submission Date 25 Nov 2026
Open Date 27 Nov 2026
Finance
Tender Value 41.52 Lakhs
Tender Fee Ref. Documents
EMD 83048
Exemption Available
Document List
2b783471-701d-42ff-b13e-3c0204140dff.html
BOQ_2565561.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 27 days
Nov 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 29 days

Tender Documents

Download All (ZIP) ↓
html

2b783471-701d-42ff-b13e-3c0204140dff.html

xls

BOQ_2565561.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender