Tender For 52 Villages Of F.P.Jhirka Assembly Constituencyconstruction Of 1 No. Additional Ranney Well At Yamuna River Flood Plains Near Village Sultanpur Distt. Palwal To Meetout The Balance Requirement Of Drinking Water Supply In 52 No. Villages Of
Tender Overview
Project Description
Tender for 52 Villages Of F.P.Jhirka Assembly Constituencyconstruction Of 1 No. Additional Ranney Well At Yamuna River Flood Plains Near Village Sultanpur Distt. Palwal To Meetout The Balance Requirement Of Drinking Water Supply In 52 No. Villages Of Nagina Block Ngaina And Pingwan And Dist. Nuh And All Other Works Contingent Thereto., Construction Of 1 No. Ranney Well At Yamuna River Flood Plains Near Village Sultanpur Distt. Palwal And Laying Of Connecting Rising Main And All Other Works Contingent. -[Dnit No.-180096]
BOQ
| Sl. No. | Item Description |
| 1 | Design, Construction, Erection and Commissioning of Ranney wells (Radial collector wells of 10 MLD capacity), with minimum 1000 mtr pushing pipe in 4 layers and minimum depth of sinking well is 40 mtrs, including all Civil works, electrical works(Cubical type LT/HT Panels, all types of cablings with cable tray, Chemical Earthings of all machineries as per design, CP Plus CCTV cameras 10 no. On the Ranneywell, Inverter Battery set on Ranneywell, Electromagnetic Flowmeters on Ranneywell as per design etc.), mechanical works (M.S Header with all necessary fittings, Gantry as per design), all types earth fillings, SCADA and Automation, along with independent HT Feeder, Boundary wall, Approach paths from Revenue pakka rasta to Ranneywell, Internal roads (500 mtr X 3.65 mtr on the RANNEYWELL), 1 no. High mast street light (12.5 mtr long pole with 8 no. Luminous lights arrangement on each pole) on RANNEYWELL with proper foundation, Check post with Iron Gate, 1 no. Staff quarter (440 sqft) on RANNEYWELL, Guard room (3 mtr X 3 mtr on RANNEYWELL), Field office (4 mtr X 4 mtr with attach WC on RANNEYWELL), HT room, DG set as per design with DG Room, Transformer as per design with platform, Horticulture and land scaping (3600 sqm on RANNEYWELL), 04 No. VT Pump vertical turbine Pumping Machinery as per design (W plus Standby) on RANNEYWELL and NRV, Connecting of Delivery Pipe to the rising main complete, VFD Panel as for design and including purchase of land 1.50 acre per Ranneywell for construction and including approach path from Revenue pakka rasta to Ranneywell at village Sultanpur District Palwal, Existing Main Boosting Station near Village Mustufabad/ Khatka for 52 No. Villages project ,Major Scope to be covered :- (1.) Internal roads of ranneywells should be made up of mix design M-30 (CC) with kerb stones on both sides with proper filling and compaction. (2.) Boundary Wall should be designed with proper foundation, Footing Beam, Plinth Beam, minimum centre to centre distance b/w columns is minimum height of Boundary wall is 3 mtr above plinth level with proper toping, M.S angle (40x40x5 mm) and Concertina wire (600 mm dia) (3). CP Plus CCTV HD coloured night vision cameras 10 no. Includes 43` inch HD Display, power backup and 1 No. 360 degree Dome camera with 11 mtr. Pole fitting with proper foundation with HD night vision. (3.) Gantry machine should be mechanically operated with proper design i.e 2 Tonne Capacity (5.) Flooring of staff quarter and guard room should be done with ceramic floor tiles with modern insanitary fittings. (6.) Flooring of Field office should be done with Granite marble with complete office furniture with modern insanitary fittings. (7.) Flooring of Ranneywells HT room and DG room done with kota stone. (8.) Transformer platform should be covered with transformer Stainless steel grills minimum height of 1.5 mtr. (9.) Horticulture and land scaping Includes Hedge along with kerb stones on both sides, ground covered with Mexican grass turf and Bottle palm (height 150 cm) along with boundary wall at a distance of 3 mtr. With combination of Ashoka and Ficus. (10.) Ranneywell Dome should be designed and constructed in proper mix design. (11.) Plinth protection of all civil structures should be done with proper toe wall and minimum width of toping is 0.9 mtr. (12.) Wall fans on each and every VT pumps should be fixed and ranneywell design should also Include casement windows with exhaust fans. (13.) Inspection Platform inside the well should be covered with Stainless steel railings, Stainless steel ladder and 8 No. Havells 200 W flood lights. (14.) All sides of H.T room, D.G room, staff quarter and Field office covered with Terracotta Tiles. (15.) Electromagnetic flow meters should be fixed at both ends (Outlet of Rannaywell and Inlet of MBS). (16.) Top of Plinth of all structures should be above HFL of particular area..... |
| 2 | Electronic water level indicator digital type complete in all respect ... |
| 3 | Supply and fixing of pressure gauge in the delivery of each pump and one common feeder with all fitting complete in all respect... |
| 4 | Operation and maintenance during 1st Year of Defect Liability Period. |
| 5 | Operation and maintenance during 2nd Year after Defect Liability Period |
| 6 | Operation and maintenance during 3rd Year of Defect LiabilitY Period |
| 7 | Operation and maintenance during 4th Year of Defect Liability Period |
| 8 | Operation and maintenance during 5th Year of Defect Liability Period |
| 9 | Operation and maintenance during 6th Year of Defect Liability Period |
| 10 | HSR Item Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender