Tender For Construction Of Interlocking Pathway On Red Track Side(From 500 Ltrs Ro To Near Pumproom) And Provision Of Barrier-Free Synthetic Interconnection Between The Existing Synthetic Tracks At Ns Nis Patiala - Reg.
Tender Value
26.42 Lakhs
Estimated cost
Bid Submission
18 Nov 2026
20 days left
EMD
52844
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Patiala → Punjab
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Interlocking Pathway On Red Track Side(From 500 Ltrs Ro To Near Pumproom) And Provision Of Barrier-Free Synthetic Interconnection Between The Existing Synthetic Tracks At Ns Nis Patiala - Reg.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 2 | All kinds of soil |
| 3 | CARRIAGE OF MATERIALS |
| 4 | Earth upto the 2km range (after deduct the 20% of excavated earth as per void factor) |
| 5 | Brick upto 2km for 1000 bricks (1000 nos) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 9 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 10 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 11 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 12 | In cement morta |
| 13 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 14 | Nominal concrete 1:36 or richer mix (including equivalentdesign mix) |
| 15 | 12 mm cement plaster of mix |
| 16 | 1:6 (1 cement: 6 fine sand) |
| 17 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineerin- charge. |
| 18 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth/brick bed dressing to camber and consolidating with road roller including makinggood the undulations etc. and re-rolling the sub grade 3 days requirement . |
| 19 | Providing and laying Synthetic Full PUR System for connecting strip between two existing synthetic tracks, over an area up to 72 sqm (approximately 18 m × 4 m), including preparation and laying of the complete synthetic surface system comprising:1. First layer: Red PU and SBR rubber granules.2. Second layer: Red PU and SBR rubber granules.3. Top layer: Red PU and EPDM granules.The work shall include supply, mixing, laying and finishing of the complete synthetic surface system as per the manufacturer’s specifications and approved methodology, including all necessary materials, labour, tools, tackles and equipment required for proper completion of the work. |
| 20 | Providing and laying 60 mm thick faciory made cement concreteinterlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 18, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysNov 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender