Tender For Consultancy Services For Authoritys Engineer For Supervision Of The Work Of Development, Maintenance, Management And Operation Of Southern Peripheral Road From Nh-48 To Vatika Chowk Via Elevated Corridor Including Interchanges, Loops And R
Tender Overview
Project Description
Tender for Consultancy Services For Authoritys Engineer For Supervision Of The Work Of Development, Maintenance, Management And Operation Of Southern Peripheral Road From Nh-48 To Vatika Chowk Via Elevated Corridor Including Interchanges, Loops And R S On Engineering Procurement And Construction (Epc) For Package-1: From Km 0+000 To Km 4+200 (Design Length - 4+230 Km).
BOQ
| Sl. No. | Item Description |
| 1 | Team Leader cum Senior Bridge Engineer |
| 2 | Resident cum Pavement Specialist |
| 3 | Bridge/Structural Engineer |
| 4 | Senior Contract Specialist |
| 5 | Senior Quality cum Material Expert |
| 6 | Road Safety Expert |
| 7 | Survey Engineer |
| 8 | Assistant Highway Engineer |
| 9 | CAD Expert |
| 10 | Assistant Bridge Engineer |
| 11 | Assistant Quality cum Material Engineer |
| 12 | Quantity Surveyor |
| 13 | Horticulture cum landscaping Expert |
| 14 | Office Manager |
| 15 | Accountant cum Cashier |
| 16 | Steno cum Computer Operator |
| 17 | Office Boy |
| 18 | Maruti ciaz or equivalent |
| 19 | Maruti Dzire or equivalent |
| 20 | Bolero or equivalent 4 x 4 vehicles |
| 21 | Office Rent (Fixed Costs) - Minimum 200 sq m area of office shall be rented. The rent cost includes maintenance, cleaning, repairing etc. complete (Rate per Month) - 200 sqmt (During Construction period) |
| 22 | Office Rent (Fixed Costs) - Minimum 50 sq m area of office shall be rented. The rent cost includes maintenance, cleaning, repairing etc. complete (Rate per Month) - 50 sqmt (During Maintenance /DLP period) |
| 23 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) - Office Supplies |
| 24 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) - Drafting Supplies |
| 25 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) - Computer Running Costs |
| 26 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) - Domestic and International Communication |
| 27 | OFFICE FURNITURE AND EQUIPMENT (Rental) - During Construction period |
| 28 | OFFICE FURNITURE AND EQUIPMENT (Rental) - During Maintenance /DLP period |
| 29 | REPORTS & DOCUMENTS PRINTING (Rate per Copy) - Monthly reports (Design and Construction) |
| 30 | REPORTS & DOCUMENTS PRINTING (Rate per Copy) - Half yearly Reports |
| 31 | REPORTS & DOCUMENTS PRINTING (Rate per Copy) - Various others reports as provided in the Concession Agreement such as Completion Report |
| 32 | Road Survey Equipment - The cost shall include carrying out survey using equipment, manpower, software and report processing. - Surface defects detection and roughness measurement using Network Survey Vehicle |
| 33 | Road Survey Equipment - The cost shall include carrying out survey using equipment, manpower, software and report processing. - Pavement strength measurement using FWD |
| 34 | Road Survey Equipment - The cost shall include carrying out survey using equipment, manpower, software and report processing. - Bridge inspection using Mobile Bridge Inspection Unit |
| 35 | Road Survey Equipment - The cost shall include carrying out survey using equipment, manpower, software and report processing. - Road signs inspection using Retro Reflectometer Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 29 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender