Tender For Construction Of Link Road From Thalan To Loharka By Way Of Earth Work In Cutting/Filling .Const. Of 01 No 6.00 Mtr Span Reinforced Cement Concrete Culvert And 3 Nos 3.00 Mtr Span Reinforced Cement Concrete Culverts, Construction Of 17 Nos
Tender Overview
Project Description
Tender for Construction Of Link Road From Thalan To Loharka By Way Of Earth Work In Cutting/Filling .Const. Of 01 No 6.00 Mtr Span Reinforced Cement Concrete Culvert And 3 Nos 3.00 Mtr Span Reinforced Cement Concrete Culverts, Construction Of 17 Nos 1.00 Mtr Dia H.P Culvert, Construction .Of R/B Walls And Created Walls In Km 1St Rd 0 - Km 3Rd Rd 400 (Under Ut Sector)
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in average fixed classification as, 80% All kind of soil, 10% Soft Rock & 10% Hard rock (Required blasting ) including disposal of surplus, excavated earth as directed by engineer- in-charge at site for safe disposal of same without damaging private/public property and all required leads/lifts and carriage. (Complete job) |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 3 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level 1:3:6 using 20% plum of nallah split stone ( 1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size ) crushed |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 6 | Stone filling hand packed in horizontal level including the cost of the stone |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 8 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level |
| 9 | Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete .Cold Twisted Bar |
| 10 | Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete |
| 11 | Foundations, footings, bases of columns |
| 12 | Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs and steps etc. |
| 13 | Suspended floors, roofs, landings, balconies and access platforms |
| 14 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 15 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 16 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion.(i) Single socketed pipes 75 mm diametre |
| 17 | Hand-packing stones in wire-crates including the cost of stones & including the cost of crates,( all Complete Job) NSI |
| 18 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) |
| 19 | Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete. |
| 20 | Sand for an average distance of 150 kms by M.T |
| 21 | Stone aggregate below 40 mm nominal size for an average distance 50 kms by M.T |
| 22 | Stone for an average distance of 05 Km by M.T Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender