Tender For Supply, Installation, Commissioning And Maintenance Of 100 Mbps Leased Line Internet Connectivity To Kfri Over Optical Fiber
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Nov 2026
13 days left
EMD
4000
Bank guarantee accepted
Document Fee
800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thrissur → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supply, Installation, Commissioning And Maintenance Of 100 Mbps Leased Line Internet Connectivity To Kfri Over Optical Fiber
BOQ
| Sl. No. | Item Description |
| 1 | Supply, Installation, Commissioning and Maintenance of 100 Mbps Leased Line Internet Connectivity to KFRI Over Optical Fiber |
| 2 | Supply, Installation, Commissioning and Maintenance of 100 Mbps Leased Line Internet Connectivity to KFRI Over Optical Fiber Scope of WorkThe scope covers the Supply, Installation, Testing, Commissioning, and Maintenance of a 100 Mbps Enterprise Internet Leased Line (ILL) delivered over a dedicated underground optical fiber network.Specifications ;Dedicated Bandwidth: 100 Mbps symmetric, uncompressed bandwidth (1:1 contention ratio) with static public IPv4/IPv6 addresses.Underground Fiber Ring Architecture: Supply, trenching, ducting, and laying of Underground Optical Fiber Cable (OFC) where applicable, in a ring topology with dual entry points to ensure complete physical path diversity.eOffice Application Access: Fast, secure, and reliable access to NIC eOffice and Government Data Centers. Low latency (under 20 ms) to ensure fast file uploads, downloads, and digital signature (e-Sign/DSC) processing.IP Addresses: Fixed Static Public IPv4 (minimum 8 usable IPs) and IPv6 block.Interface Hand-off: Standard Ethernet (RJ-45) directly into the firewall.Hardware & Management: All supplied CPE hardware shall remain the property of the Service Provider.Maintenance, repairs, firmware updates, and hardware replacements must be provided free of cost throughout the contract period.Service Provider: Internet Service Providers (ISPs) licensed by the Department of Telecommunications (DoT)Core Technical Specification. . Band width & Contention Ratio:1.1 Un contended Ratio: The allocated bandwidth is exclusively dedicated to our organization and is never shared with other users.Symmetrical speeds: Download and Upload speeds are identical Speed Range: Typically scales from 1Mbps up to 10 Gbps depending enterprise tier and last mile media.. Last-Mile & Physical Media Optical Fiber Cable (OFC): The primary and most reliable delivery method for high –speed enterprise circuits. Alternative Last-Mile: Copper (EFM- Ethernet in the First Mile), EoFTTC (Ethernet over Fibre to the Cabinet), or Radio Frequecy (RF) wireless links for redundancy. Handover Interface: Standard Ethernet (RJ45) delivered directly into the firewall.Network & Protocol Support IP Addressing: Dual-stack support for IPv4 and IPv6 Routing Protocols: Static routing or dynamic routing via BGP (Border Gateway Protocol) for multi-homing or autonomous systems. Transparency: Full- duplex transparent data flowService Level Agreement (SLA) & Performance Benchmarks. Network Uptime: Guaranteed high availability, typically 98.5% to 99.5% or higher uptime per month. Latency: Low, predictable round- trip latency to Tier-1 peering points.Packet Loss: Maintained below 1% average over extended pings.Mean Time to Repair: Strict contractual repair windows, often 2 to 4 hours response / restoration time backed by 24/7 proactive network monitoring.Redundancy: Optical loop/ring protection on the optical fiber last mile and dual-router or dual-ISP failover configurations.Broad specificationSite Survey & Infrastructure Mapping:The Service Provider shall conduct a comprehensive site visit to inspect the premises, assess physical routing paths, identify active department divisions, and map all network distribution points prior to submitting the bidNetwork Topology & Line Diagram:The vendor must submit a detailed Network Line Diagram / Schematic Topology showing the current system architecture, optical fiber entry path, CPE termination, and handoff points to monitor and manage bandwidth routing across divisions.User Scalability & Speed Range: Designed to serve up to 150 active simultaneous users with guaranteed throughput. The infrastructure, CPE, and last-mile fiber media must support seamless speed scaling (ranging from 100 Mbps up to 1 Gbps) via software configuration to accommodate future user expansion without physical cable replacement. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 27, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 11, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysNov 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender