Defence Statutory Bodies & Commissions/Committees Closing in 19 days TDR #58233031

Bids Are invited for Design And Development Of Water Conservation And Pond Beautification

Issued by Statutory Bodies & Commissions/Committees · Nashik, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Nov 2026
19 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Nashik → Maharashtra
EMD Exemption
Available
Quantity
55

Project Description

Bids Are invited for Design And Development Of Water Conservation And Pond Beautification Site Preparation , Setting Out , Earthwork , Pond Formation , Pond Lining , Water Edge , Water Management , Fountain , Electrical , Pathway , Bridge , Bridge Safety , Viewing Deck , Deck Safety , Seating , Lighting , Landscape , Safety , Water Commissioning , Miscellaneous - Site Preparation - Site Clearance Removal Of Weeds Loose Vegetation And Debris Stack Dispose Within Approved Lead , Setting Out - Setting Out Pond Profile Pathway And Deck Levels And Profiles , Earthwork - Excavation For Irregular Pond Average 0.90 M Depth Includes Dressing Of Bed And Side Slopes , Earthwork - Loading Transportation And Disposal Of Surplus Excavated Soil Within Assumed 5 Km Lead , Pond Formation - Compaction And Preparation Of Pond Subgrade Removal Of Sharp Stones And Local Levelling , Pond Lining - Supply And Laying 1.5 Mm Hdpe Geomembrane Liner Welded Seams Testing And Upturn At Edges , Pond Lining - Non-Woven Geotextile Protection Layer Below Hdpe Liner , Pond Lining - Protective Layer Local Concrete Screed And Cushioning At Vulnerable Locations Below Stone Edge , Water Edge - Natural Stone Boulder Edging Selected Stone Placement And Bedding Along Pond Perimeter , Water Edge - Underwater Edge Sealing Details Liner Termination Clamping Strip And Sealant , Water Management - Overflow Pipe Inlet Drain-Down Pipe Valves And Screened Outlet Fittings , Water Management - Water Circulation Pump Pre Filter Valves And Fittings Approx 1.5 2 Hp Duty Subject To Hydraulic Design , Fountain - Compact Fountain Aeration Jet With Nozzle Pump Connection Underwater Safe Fittings And Commissioning , Electrical - Outdoor Rated Electrical Panel Rccb Mcb Timer Earthing And Control Wiring For Pump Fountain , Electrical - Underground Armoured Cable Conduit And Installation To Pond Equipment And Lights , Pathway - Excavation Sub Base Preparation And Compaction For Permeable Paver Pathway , Pathway - 60 Mm Concrete Paver Blocks Including 50 Mm Compacted Fine Aggregate Bedding Laying And Joint Filling , Pathway - Edge Restraint Kerb To Pathway Concrete Bedding And Joints , Bridge - Inspection Minor Repair Rust Removal Primer And Repainting Of Existing Pedestrian Bridge Tightening Repair Of Connections , Bridge - Replace Repair Damaged Deck Boards Or Anti Slip Deck Surface On Existing Bridge , Bridge Safety - Repair Upgrade Ms Handrail Child Safe Infill Anti Corrosion Primer And Exterior Coating , Viewing Deck - Compact Raised Viewing Sitting Deck Treated Timber Look Wpc Decking Over Ms Subframe Including Supports And Fixings , Deck Safety - Ms Railing With Powder Coated Finish Around Exposed Deck Edges , Seating - Outdoor Park Benches With Treated Wpc Slats And Powder Coated Ms Frame , Lighting - Low Level Outdoor Bollard Lights Warm White Led Weatherproof Fitting With Base Foundation , Lighting - Bridge Deck Accent Lights Outdoor Rated Led Fittings , Lighting - Earthing Junction Boxes Waterproof Glands And Testing For Outdoor Lighting Circuit , Landscape - Garden Soil Fym Preparation For Shrub And Flower Beds 30 Cm Depth , Landscape - Supply And Planting Of Shrubs Flowering Groundcover Including Initial Watering , Landscape - Supply And Planting Of Ornamental Shade Trees 1 2 M Height , Landscape - Tree Pit Excavation 60X60x60 Mm Includes Dressing Of Bed And Side Slopes , Landscape - Tree Pit Garden Soil And Farm Yard Manuar For 60X60x60 Mm Pit Includes Dressing Of Bed And Side Slopese , Landscape - Lawn Establishment With Selected Grass Soil Preparation Planting And First 30 Day Maintenance , Landscape - Decorative Natural Stone Planting Clusters At Selected Pond Edge Locations , Safety - Child Safety Edge Treatment Low Planting Buffer Warning Signage And Discreet Access Control At Vulnerable Locations , Water Commissioning - Initial Filling Cleaning Water Quality Treatment And System Testing , Miscellaneous - Debris Removal Final Cleaning Making Good Disturbed Garden Areas , Miscellaneous - Site Survey Measurements Geotagged Documentation And Feasibility Report , Miscellaneous - Architectural Landscape Design Detailed Drawings Sections 3D Views And Technical Design , Miscellaneous - Site Clearance Setting Out Tree Protection And Preparatory Works , Miscellaneous - Excavation Shaping Disposal Stacking And Compact Pond Basin Preparation , Miscellaneous - Pond Base Preparation Lining Waterproofing And Protective Layers As Approved , Miscellaneous - Pond Edge Treatment Natural Stone Finished Edge And Safe Landscape Interface , Miscellaneous - Water Conservation Runoff Capture Inlet Outlet Overflow Works As Feasible , Miscellaneous - Water Recirculation Filtration Aeration And Small Fountain Package Pumps Pipes And Controls , Miscellaneous - Existing Bridge Repair Upgradation Or Small Bridge Works Deck Handrails And Anti Slip Finish , Miscellaneous - Pathwayspaving Including Base Edging And Making Good , Miscellaneous - Child Public Safety Barrier Or Railing Gates Safety Signage And Edge Visibility , Miscellaneous - Selfie Photo Point Decorative Frame Signage And Small Viewing Platform With Protection , Miscellaneous - Benches And Compact Shaded Seating Pergola Foundations And Finishes , Miscellaneous - Landscape Planting Shrubs Groundcover Soil Improvement And Mulching , Miscellaneous - Outdoor Lighting Bollards Fixtures Wiring Earthing Protection And Commissioning , Miscellaneous - Litter Bins With Intallation Pvc , Miscellaneous - Way Finding Information Board And Public Use Accessories , Miscellaneous - Testing Commissioning Functional Checks As Built Drawings Om Manual And Handover

BOQ

Sl. No. Item TitleItem Description
1Site preparationSite clearance removal of weeds loose vegetation and debris stack dispose within approved lead
2Setting outSetting out pond profile pathway and deck levels and profiles
3EarthworkExcavation for irregular pond average 0.90 m depth includes dressing of bed and side slopes
4EarthworkLoading transportation and disposal of surplus excavated soil within assumed 5 km lead
5Pond formationCompaction and preparation of pond subgrade removal of sharp stones and local levelling
6Pond liningSupply and laying 1.5 mm HDPE geomembrane liner welded seams testing and upturn at edges
7Pond liningNon-woven geotextile protection layer below HDPE liner
8Pond liningProtective layer local concrete screed and cushioning at vulnerable locations below stone edge
9Water edgeNatural stone boulder edging selected stone placement and bedding along pond perimeter
10Water edgeUnderwater edge sealing details liner termination clamping strip and sealant
11Water managementOverflow pipe inlet drain-down pipe valves and screened outlet fittings
12Water managementWater circulation pump pre filter valves and fittings approx 1.5 2 HP duty subject to hydraulic design
13FountainCompact fountain aeration jet with nozzle pump connection underwater safe fittings and commissioning
14ElectricalOutdoor rated electrical panel RCCB MCB timer earthing and control wiring for pump fountain
15ElectricalUnderground armoured cable conduit and installation to pond equipment and lights
16PathwayExcavation sub base preparation and compaction for permeable paver pathway
17Pathway60 mm concrete paver blocks including 50 mm compacted fine aggregate bedding laying and joint filling
18PathwayEdge restraint kerb to pathway concrete bedding and joints
19BridgeInspection minor repair rust removal primer and repainting of existing pedestrian bridge tightening repair of connections
20BridgeReplace repair damaged deck boards or anti slip deck surface on existing bridge
21Bridge safetyRepair upgrade MS handrail child safe infill anti corrosion primer and exterior coating
22Viewing deckCompact raised viewing sitting deck treated timber look WPC decking over MS subframe including supports and fixings
23Deck safetyMS railing with powder coated finish around exposed deck edges
24SeatingOutdoor park benches with treated WPC slats and powder coated MS frame
25LightingLow level outdoor bollard lights warm white LED weatherproof fitting with base foundation
26LightingBridge deck accent lights outdoor rated LED fittings
27LightingEarthing junction boxes waterproof glands and testing for outdoor lighting circuit
28LandscapeGarden soil FYM preparation for shrub and flower beds 30 cm depth
29LandscapeSupply and planting of shrubs flowering groundcover including initial watering
30LandscapeSupply and planting of ornamental shade trees 1 2 m height
31LandscapeTree pit excavation 60x60x60 mm includes dressing of bed and side slopes
32LandscapeTree pit garden soil and Farm Yard Manuar for 60x60x60 mm pit includes dressing of bed and side slopese
33LandscapeLawn establishment with selected grass soil preparation planting and first 30 day maintenance
34LandscapeDecorative natural stone planting clusters at selected pond edge locations
35SafetyChild safety edge treatment low planting buffer warning signage and discreet access control at vulnerable locations
36Water commissioningInitial filling cleaning water quality treatment and system testing
37MiscellaneousDebris removal final cleaning making good disturbed garden areas
38MiscellaneousSite survey measurements geotagged documentation and feasibility report
39MiscellaneousArchitectural landscape design detailed drawings sections 3D views and technical design
40MiscellaneousSite clearance setting out tree protection and preparatory works
41MiscellaneousExcavation shaping disposal stacking and compact pond basin preparation
42MiscellaneousPond base preparation lining waterproofing and protective layers as approved
43MiscellaneousPond edge treatment natural stone finished edge and safe landscape interface
44MiscellaneousWater conservation runoff capture inlet outlet overflow works as feasible
45MiscellaneousWater recirculation filtration aeration and small fountain package pumps pipes and controls
46MiscellaneousExisting bridge repair upgradation or small bridge works deck handrails and anti slip finish
47MiscellaneousPathwayspaving including base edging and making good
48MiscellaneousChild public safety barrier or railing gates safety signage and edge visibility
49MiscellaneousSelfie photo point decorative frame signage and small viewing platform with protection
50MiscellaneousBenches and compact shaded seating pergola foundations and finishes
51MiscellaneousLandscape planting shrubs groundcover soil improvement and mulching
52MiscellaneousOutdoor lighting bollards fixtures wiring earthing protection and commissioning
53MiscellaneousLitter bins with intallation pvc
54MiscellaneousWay finding information board and public use accessories
55MiscellaneousTesting commissioning functional checks as built drawings OM manual and handover

AI Tender Summary

OUR REF NO 58233031
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE Ref. Documents
LAST DATE 19-11-2026
Authority
Authority Name Department Of Defence
Work Description Bids Are invited for Design And Development Of Water Conservation And Pond Beautification Site Preparation , Setting Out , Earthwork , Pond Formation , Pond Lining , Water Edge , Water Management , Fountain , Electrical , Pathway , Bridge , Bridge Safety , Viewing Deck , Deck Safety , Seating , Lighting , Landscape , Safety , Water Commissioning , Miscellaneous - Site Preparation - Site Clearance Removal Of Weeds Loose Vegetation And Debris Stack Dispose Within Approved Lead , Setting Out - Setting Out Pond Profile Pathway And Deck Levels And Profiles , Earthwork - Excavation For Irregular Pond Average 0.90 M Depth Includes Dressing Of Bed And Side Slopes , Earthwork - Loading Transportation And Disposal Of Surplus Excavated Soil Within Assumed 5 Km Lead , Pond Formation - Compaction And Preparation Of Pond Subgrade Removal Of Sharp Stones And Local Levelling , Pond Lining - Supply And Laying 1.5 Mm Hdpe Geomembrane Liner Welded Seams Testing And Upturn At Edges , Pond Lining - Non-Woven Geotextile Protection Layer Below Hdpe Liner , Pond Lining - Protective Layer Local Concrete Screed And Cushioning At Vulnerable Locations Below Stone Edge , Water Edge - Natural Stone Boulder Edging Selected Stone Placement And Bedding Along Pond Perimeter , Water Edge - Underwater Edge Sealing Details Liner Termination Clamping Strip And Sealant , Water Management - Overflow Pipe Inlet Drain-Down Pipe Valves And Screened Outlet Fittings , Water Management - Water Circulation Pump Pre Filter Valves And Fittings Approx 1.5 2 Hp Duty Subject To Hydraulic Design , Fountain - Compact Fountain Aeration Jet With Nozzle Pump Connection Underwater Safe Fittings And Commissioning , Electrical - Outdoor Rated Electrical Panel Rccb Mcb Timer Earthing And Control Wiring For Pump Fountain , Electrical - Underground Armoured Cable Conduit And Installation To Pond Equipment And Lights , Pathway - Excavation Sub Base Preparation And Compaction For Permeable Paver Pathway , Pathway - 60 Mm Concrete Paver Blocks Including 50 Mm Compacted Fine Aggregate Bedding Laying And Joint Filling , Pathway - Edge Restraint Kerb To Pathway Concrete Bedding And Joints , Bridge - Inspection Minor Repair Rust Removal Primer And Repainting Of Existing Pedestrian Bridge Tightening Repair Of Connections , Bridge - Replace Repair Damaged Deck Boards Or Anti Slip Deck Surface On Existing Bridge , Bridge Safety - Repair Upgrade Ms Handrail Child Safe Infill Anti Corrosion Primer And Exterior Coating , Viewing Deck - Compact Raised Viewing Sitting Deck Treated Timber Look Wpc Decking Over Ms Subframe Including Supports And Fixings , Deck Safety - Ms Railing With Powder Coated Finish Around Exposed Deck Edges , Seating - Outdoor Park Benches With Treated Wpc Slats And Powder Coated Ms Frame , Lighting - Low Level Outdoor Bollard Lights Warm White Led Weatherproof Fitting With Base Foundation , Lighting - Bridge Deck Accent Lights Outdoor Rated Led Fittings , Lighting - Earthing Junction Boxes Waterproof Glands And Testing For Outdoor Lighting Circuit , Landscape - Garden Soil Fym Preparation For Shrub And Flower Beds 30 Cm Depth , Landscape - Supply And Planting Of Shrubs Flowering Groundcover Including Initial Watering , Landscape - Supply And Planting Of Ornamental Shade Trees 1 2 M Height , Landscape - Tree Pit Excavation 60X60x60 Mm Includes Dressing Of Bed And Side Slopes , Landscape - Tree Pit Garden Soil And Farm Yard Manuar For 60X60x60 Mm Pit Includes Dressing Of Bed And Side Slopese , Landscape - Lawn Establishment With Selected Grass Soil Preparation Planting And First 30 Day Maintenance , Landscape - Decorative Natural Stone Planting Clusters At Selected Pond Edge Locations , Safety - Child Safety Edge Treatment Low Planting Buffer Warning Signage And Discreet Access Control At Vulnerable Locations , Water Commissioning - Initial Filling Cleaning Water Quality Treatment And System Testing , Miscellaneous - Debris Removal Final Cleaning Making Good Disturbed Garden Areas , Miscellaneous - Site Survey Measurements Geotagged Documentation And Feasibility Report , Miscellaneous - Architectural Landscape Design Detailed Drawings Sections 3D Views And Technical Design , Miscellaneous - Site Clearance Setting Out Tree Protection And Preparatory Works , Miscellaneous - Excavation Shaping Disposal Stacking And Compact Pond Basin Preparation , Miscellaneous - Pond Base Preparation Lining Waterproofing And Protective Layers As Approved , Miscellaneous - Pond Edge Treatment Natural Stone Finished Edge And Safe Landscape Interface , Miscellaneous - Water Conservation Runoff Capture Inlet Outlet Overflow Works As Feasible , Miscellaneous - Water Recirculation Filtration Aeration And Small Fountain Package Pumps Pipes And Controls , Miscellaneous - Existing Bridge Repair Upgradation Or Small Bridge Works Deck Handrails And Anti Slip Finish , Miscellaneous - Pathwayspaving Including Base Edging And Making Good , Miscellaneous - Child Public Safety Barrier Or Railing Gates Safety Signage And Edge Visibility , Miscellaneous - Selfie Photo Point Decorative Frame Signage And Small Viewing Platform With Protection , Miscellaneous - Benches And Compact Shaded Seating Pergola Foundations And Finishes , Miscellaneous - Landscape Planting Shrubs Groundcover Soil Improvement And Mulching , Miscellaneous - Outdoor Lighting Bollards Fixtures Wiring Earthing Protection And Commissioning , Miscellaneous - Litter Bins With Intallation Pvc , Miscellaneous - Way Finding Information Board And Public Use Accessories , Miscellaneous - Testing Commissioning Functional Checks As Built Drawings Om Manual And Handover
Basic Detail
Tender No GEM/2026/B/8207567
Bidding Type Tender
Location
City Nashik
State Maharashtra
Key Dates
Publish Date 27 Oct 2026
Submission Date 19 Nov 2026
Open Date 20 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Available
Document List
492f37cd-76cf-498c-925a-faaf8f0fbd6a.pdf
1793104686.xlsx
technical_requirement_2026-10-27-17-51-08_523618d65992eaceeb5e019a805ccc4f.pdf
10089258_Boq_1.xlsx
pond_5c51b0da-13f2-4274-b3641793105361085_watersupply8.pdf
pond_97182200-8569-4507-9c2c1793105587462_watersupply8.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 19, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Nov 20, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
pdf

492f37cd-76cf-498c-925a-faaf8f0fbd6a.pdf

xlsx

1793104686.xlsx

pdf

technical_requirement_2026-10-27-17-51-08_523618d65992eaceeb5e019a805ccc4f.pdf

xlsx

10089258_Boq_1.xlsx

pdf

pond_5c51b0da-13f2-4274-b3641793105361085_watersupply8.pdf

pdf

pond_97182200-8569-4507-9c2c1793105587462_watersupply8.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender