Tender For Mtps-Ii - Tgm&Ca Division - Inspection, Cleaning And Hydraulic Testing Of Turbine Lube Oil Cooler -A, Tdbfp A&B Lube Oil Coolers, Mdbfp Lube Oil, Working Oil Cooler-A & B, Eh Oil Coolers,Vacuum Pump Heat Exchanger-A, Replacement Of Tube Ne
Tender Overview
Project Description
Tender for Mtps-Ii - Tgm&Ca Division - Inspection, Cleaning And Hydraulic Testing Of Turbine Lube Oil Cooler -A, Tdbfp A&B Lube Oil Coolers, Mdbfp Lube Oil, Working Oil Cooler-A & B, Eh Oil Coolers,Vacuum Pump Heat Exchanger-A, Replacement Of Tube Nest In Vacuum Pump Heat Exchanger B And Replacement Of Upper And Lower Shell Gaskets In Turbine Lube Oil Cooler-B During Capital Overhauling-2026.
BOQ
| Sl. No. | Item Description |
| 1 | Inspection and cleaning of Turbine Lube Oil Cooler A: Dismantling of Top water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes if any, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. |
| 2 | Inspection, cleaning and replacement of upper & lower shell gasket in Turbine Lube Oil Cooler B: a) Dismantling of Top water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes if any, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. |
| 3 | b) Dismantling of Bottom water box by loosening of bolts & nuts and bring down from 8.5 meter to '0' meter by using the chain block & special tackles, replacemet of damaged water gaskets and rubber chord with suitable size and cleaning flange seating area including the cost of consumables and T&P charges. |
| 4 | c) Lifting of MOT Cooler Tube nest 'B' from shell , Removing and cleaning of oil sludges deposit on the tube nest without any oil traces by water & air , providing new oil gasket and positioning of MOT Tube nest 'A' in the upper shell including dismantling and assembling of air ventilation duct in 8.5 mtr as per engineer in charge with the cost of consumables and T&P charges. |
| 5 | Inspection and cleaning of TDBFP A&B, MDBFP Lube Oil Coolers: Dismantling of Front water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of front and rear water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. |
| 6 | Inspection and cleaning of MDBFP Working Oil Coolers A: Dismantling of Front water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of front and rear water box, cleaning of all flange seating areas, providing new oil, water gaskets and rubber chords, assembling and tightening of all parts and painting 2 coats of enamel paint including the cost of consumables and T&P charges. |
| 7 | Inspection ,cleaning & flaring of Tube ends of MDBFP Working Oil Cooler B: a) Dismantling of Front water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of front and rear water box, cleaning of all flange seating areas, providing new oil, water gaskets and rubber chords, assembling and tightening of all parts and painting 2 coats of enamel paint including the cost of consumables and T&P charges. |
| 8 | b) Flaring the SS tube ends of the leakage tubes by using special tools,welding, Grinding, and other connected works including cost of consumables and T&P charges. |
| 9 | Inspection and cleaning of Vacuum Pump Heat exchanger - A Dismantling of Front water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of front and rear water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. |
| 10 | Replacement of Tube nest in Vacuum Pump Heat Exchanger 'B': a) Draining of water from shell and tubes including the cost of consumables and T&P charges. |
| 11 | b) Dismantling of water box, releasing the existing eroded tube nest, cleaning of water box & outer shell, cleaning of all flange seating areas, positioning the spare tube nest and hydraulic testing of tube nest & providing new water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. |
| 12 | c) Lifting the eroded tube nest after complete cleaning the tube nest & Transporting the removed tube nest to repair bay, lifting the new spare tube nest aftere complete cleaning of tubes by water & air, transporting the spare tube nest from repair bay to the location as per the instruction of Board engineer including the cost of consumables and T&P charges. |
| 13 | Inspection and cleaning and hydraulic testing of E.H Oil Coolers: Dismantling of Front water box, cleaning of all tubes with nylon brush, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of front and rear water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts including the cost of consumables and T&P charges. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender