Tender For A)Extension Of 8 Ms Pipeline Approx. 200Ft. And Repairing / Modification Of Bed Plate, Fabrication Of Suction Bend, Delivery Bend, Foot Valve Bend, Installation On Pontoon Of Flow More Make 2000 Gpm Pump And 400 Kw/3.3 Ht Motor Make Marath
Tender Overview
Project Description
Tender for A)Extension Of 8 Ms Pipeline Approx. 200Ft. And Repairing / Modification Of Bed Plate, Fabrication Of Suction Bend, Delivery Bend, Foot Valve Bend, Installation On Pontoon Of Flow More Make 2000 Gpm Pump And 400 Kw/3.3 Ht Motor Make Marathon At Borira Mines, Docp Under C.V. Area For Dewatering Of Mines Water.(B)Extension Of 4Th Range 8 Dia Ms Pipeline Approx. 400Ft. At Borira Quarry.
BOQ
| Sl. No. | Item Description |
| 1 | A)Extension of 8\\" MS Pipeline approx. 200ft. and repairing / modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation on Pontoon of Flow More Make 2000 GPM Pump and 400 KW/3.3 HT Motor make Marathon at Borira Mines, DOCP under C.V. Area for dewatering of Mines water. |
| 2 | Old and scrap griders, MS Plate, angles etc. are collected from dumping yeard of DOCP by gas cutting and lifting and carrying by manually for bed plate repaing and modidication of old bed plate. Skilled - 1 men x 2 days |
| 3 | Old and scrap griders, MS Plate, angles etc. are collected from dumping yeard of DOCP by gas cutting and lifting and carrying by manually for bed plate repaing and modidication of old bed plate. Semi-skilled - 2 men x 2 days |
| 4 | Cost of 8 nos. bend and 3 nos. short piece making by 8\\" dia MS pipe cutting by gas and both side 8\\" dia MS flange welding in side and out side double layer welding with 10\\" dia flange fitting and grand finishing (2 no U-type and 2 nos. 8\\" short-piece bend making as per required size.Skilled - 1 men x 3 days |
| 5 | Cost of 8 nos. bend and 3 nos. short piece making by 8\\" dia MS pipe cutting by gas and both side 8\\" dia MS flange welding in side and out side double layer welding with 10\\" dia flange fitting and grand finishing (2 no U-type and 2 nos. 8\\" short-piece bend making as per required size.Semi-skilled - 2 men x 3 days |
| 6 | 3 nos. curve type bend making by 10\\" dia MS pipe cutting by gas and both side flange welding in size & out side double layer welding with both side grind finishing as per required size.Skilled - 1 men x 3 days |
| 7 | 3 nos. curve type bend making by 10\\" dia MS pipe cutting by gas and both side flange welding in size & out side double layer welding with both side grind finishing as per required size.Semiskilled - 2 men x 3 days |
| 8 | Labour cost for loading and unloading of Bed plate complete, pump motor set, bend etc. E&M office to DOCP Quarry by crane Skilled - 1 men x 1 day |
| 9 | Labour cost for loading and unloading of Bed plate complete, pump motor set, bend etc. E&M office to DOCP Quarry by crane Semiskilled - 3 men x 1 day |
| 10 | Lifting and installation of Pump and Motor on the bed plate by the help of crane and setting with line leveling and fitting by bolting on pontoon.Skilled - 2 men x 1 shift |
| 11 | Lifting and installation of Pump and Motor on the bed plate by the help of crane and setting with line leveling and fitting by bolting on pontoon.Semiskilled - 3 men x 1 shift |
| 12 | Lifting and installation of Pump and Motor on the bed plate by the help of crane and setting with line leveling and fitting by bolting on pontoon.Unskilled - 3 men x 1 shift |
| 13 | 2 nos. 10\\" dia x 20' length both side 10\\" flange welding in side and outside double layer wleidng with fixing for suction and delivery line joining.Skilled - 1 men x 1 shift |
| 14 | 2 nos. 10\\" dia x 20' length both side 10\\" flange welding in side and outside double layer wleidng with fixing for suction and delivery line joining.Semiskilled - 2 men x 1 shift |
| 15 | Jointing and fittings with 8\\" dia MS pipe, g\\" bends fitting with delivery line with 20' length suction pipe with 10\\" foot valve in deep water and alignment of motor pump with bed plate.Skilled - 1 men x 2 shift |
| 16 | Jointing and fittings with 8\\" dia MS pipe, g\\" bends fitting with delivery line with 20' length suction pipe with 10\\" foot valve in deep water and alignment of motor pump with bed plate.Semiskilled - 4 men x 2 shift |
| 17 | Jointing and fittings with 8\\" dia MS pipe, g\\" bends fitting with delivery line with 20' length suction pipe with 10\\" foot valve in deep water and alignment of motor pump with bed plate.Unskilled - 2 men x 2 shift |
| 18 | Crane hiring charges |
| 19 | Brass valve ¾\\"-1 No. bend-3/4\\", cooling pipe clamp etc. with fitting |
| 20 | Industrial gas DA cly. |
| 21 | Industrial Oxygen Cly, |
| 22 | M.S. Flange 8\\" dia (Table-D) |
| 23 | M.S. Flange 10\\" dia (Table-D) |
| 24 | Manually laying and jointing approx 200 ft. 8\\" MS Pipe |
| 25 | 1 No. 10\\" foot valve repairing |
| 26 | Labour cost of manually shifting and fitting 10\\" sluice valve and 1 No. Non returning valve nearpump |
| 27 | Cost of 8\\" MS flange and 10 MS flange setting and fitting with 8\\" dia MS pipe and 10\\" dia MS Pipe inside and outside welding double layer |
| 28 | M.S. Electrods |
| 29 | M.S. Bolt, Nuts & Washer (F.T.) (4\\"X5/8\\", 5\\"X5/8\\" 6\\"X5/8\\") |
| 30 | R.I. Cloth |
| 31 | Transproting and other Misc. |
| 32 | B)Extension of 4th Range 8\\" Dia MS Pipeline approx. 400ft. at Borira Quarry. |
| 33 | Labour charges for handling from DOCP store to welding place laying there, after that restacking and loading, unloading of 8\\" dia MS Pipe approx 400 ft.Skilled - 1 heads x 3 days |
| 34 | Labour charges for handling from DOCP store to welding place laying there, after that restacking and loading, unloading of 8\\" dia MS Pipe approx 400 ft.Unskilled - 5 heads x 3 days |
| 35 | Cost of 8\\" Dia M.S. Flange setting with fittings and double layer welding |
| 36 | Labour charges for manually loading and unloading and fabrication 8\\" MS Pipe bend-02 nos, short piece-02 nos. from DOCP workshop to Borira Quarry Skilled - 1 heads x 2 days |
| 37 | Labour charges for manually loading and unloading and fabrication 8\\" MS Pipe bend-02 nos, short piece-02 nos. from DOCP workshop to Borira Quarry Unskilled - 3 heads x 2 days |
| 38 | Labour cost for shifting 8\\" sluice valve-01 no. and 01 no. Non return valve near pump |
| 39 | Supply of 8\\" MS Flange |
| 40 | Supply and fitting of 8\\" MS Nut and Bolt 3/4\\"x4\\" |
| 41 | Supply MS Electrode for welding |
| 42 | Manually laying and jointing 8\\" MS pipe |
| 43 | Cost of DA Cylinder - 7 Cum |
| 44 | Oxygen Cylinder -21 cum |
| 45 | Transporting of Cylinder (To and For) and rental charges |
| 46 | Cost of Crane / JCB / Excavator loader type of Machine |
| 47 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender