Tender For Re- Organization Of Srinagar Drinking Water Pumping Supply Scheme (Review Of Design, Build, Operate & Management & O&M For 7 Years) Under World Bank Funded Uttarakhand Efficient Water Supply Programme (Ewsp) Under Pauri Division In The Sta
Tender Overview
Project Description
Tender for Re- Organization Of Srinagar Drinking Water Pumping Supply Scheme (Review Of Design, Build, Operate & Management & O&M For 7 Years) Under World Bank Funded Uttarakhand Efficient Water Supply Programme (Ewsp) Under Pauri Division In The State Of Uttarakhand.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Nov-2026 | Pre Bid Meetomg | Other | 13-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | RE- ORGANIZATION OF SRINAGAR DRINKING WATER PUMPING SUPPLY SCHEME (Review of Design, Build, operate & management & O&M for 7 Years) UNDER World bank Funded Uttarakhand efficient water supply programme (eWSP) Under Pauri Division in the state of Uttarakhand. |
| 2 | Construction of a R.C.C. Wall including supply of all material, labour, T&P etc complete (Vetted Drawing & Design as per Clause No 40.03 ) |
| 3 | Construction of Tube-well 250 mm including 80 meter test boring & Hydro geological Survey ( resistivity Test et. complete)Transportation of Suitable truck mounted Odex rig machine, air Compressor, OP unit, Camp, Equipage connected T&P and necessary accessories, casing, pipe Tube well assembly, housing pipe etc including loading , unloading creation and leveling of rig machine up to site of work etc completer in all respect as per direction of Engineer in Charge required for drilling and Development of Tube well, etc complete in all respect. |
| 4 | Construction of Rapid Sand Filter of 3.45 MLD of 2 unit filter beds of 3.00 X 4.00 mtrs = 12.00 sqm. each including design & Drawing and supply of filter media and flocenlator Chamber settling tank, Chlorine Dosing Chamber all pipe fitting back wash tank, pump motor etc, at items including on SITC basic it should be filter water accordance with IS 10500 each unit shall be double as on unit is stand by at SHRIKOT (Vetted Drawing & Design as per Clause No 40.03 ) |
| 5 | Construction of Rapid Sand Filter of 0.71 MLD of 2 unit filter beds of 2.00 x 2.50 mtrs = 4.50 sqm. each including supply of all material, labour, T&P etc complete BANSWADA (Vetted Drawing & Design as per Clause No 40.03 ) |
| 6 | Supply of all material, labour T&P and construct Flocculator unit as per drawing and design at SHRIKOT |
| 7 | Supply of all material, labour T&P and construct Flocculator unit as per drawing and design at BANSWADA |
| 8 | Supply of all material, labour T&P and construct Settling Tank of 4.14 MLD as per drawing and designat SHRIKOT |
| 9 | Supply of all material, labour T&P and construct Settling Tank of 0.85 MLD as per drawing and designat BANSWADA |
| 10 | Constructing masonry Chamber 120x120x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 |
| 11 | Supply of all material, labour T&P and construct 35.00 KL Back wash tank as per drawing and designat SHRIKOT |
| 12 | Supply of all material, labour T&P and construct 10.00 KL Back wash tank as per drawing and designat BANSWADA |
| 13 | Supply and installation of online Automatic Chlorine Dozer including Hypochlorite solution at CWR complete with all arrangements in position. |
| 14 | Investigation, design and construction of following RCC CWR / semi sunk reservoir including testing, cost of all pipes & fittings, supply and cartage of all material, Labour and T&P etc, complete. Structural design should be from IIT or equivalent institution. (Cap. in KL) ( as per clause No 1.5 and 1.6)225.KL |
| 15 | 950 KL |
| 16 | 325 KL |
| 17 | 200 KL |
| 18 | 775KL |
| 19 | 150KL |
| 20 | 105KL |
| 21 | 17.50 KL |
| 22 | 250KL |
| 23 | Protection works R.R.1:6 Stone masonry |
| 24 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work up to plinth level 1:2:4 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 25 | Providing and fixing 20 mtr 15 mm dia. G.I. pipes complete with G.I. fittings etc. from distribution network to householdsShifting & New House Service Connection -Distribution Line to Household |
| 26 | Providing and Fixing of Mechanical type AMR Ready Meters with all T&P etc at HSC (As per Clause No 1.5 and 1.6)15 mm |
| 27 | Providing and Fixing of Polycarbonate Box Blue with transparent lid,must have option to seal the box, min three seal option with two iron angle to fix the box. Size- length-255mm , width-210 mm,height- 190 mm |
| 28 | Providing and Fixing of Pressure Transmitter with LORA communication Battery operated (with 1 year battery life, rechargeable battery) with display, weather proof, operational frequency 865 MHz-867 MHz, communication: UART/RS485, Pressure rating up to 16 kg/cm2 compatible with SCADA system including all necessary fittings etc. complete. |
| 29 | Providing and Fixing of Horizontal Check Valve/wheel valve 15 mm Medium duty with all material etc complete. |
| 30 | Providing and Fixing C.I. Plug 15 mm with all material etc |
| 31 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 3.0 m in width on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. as per type designBRIDDLE PATH |
| 32 | Providing of all materials, carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MSERW Pipes grade Yst 210, Jointing by electric welding process with proper grade of electrodes suitable for jointing of water supply lines(Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete. All MSERW Pipe as per design type.300 mm dia MSERW |
| 33 | 250 mm dia MSERW 4.8 mm thick |
| 34 | 200 mm dia MSERW 4.8 mm thick |
| 35 | 150 mm dia MSERW 4.8 mm thick |
| 36 | 125 mm dia MSERW 4.8 mm thick |
| 37 | 125 mm dia MSERW 6.6 mm thick |
| 38 | 100 mm dia MSERW 4.8 mm thick |
| 39 | 80 mm dia GI |
| 40 | 65 mm dia GI |
| 41 | Cartage of following pipes, specials & fittings from Rishikesh to site store for proper completion of works.300 mm 4.8 mm thick |
| 42 | 250 mm 4.8 mm thick |
| 43 | 200 mm dia MSERW |
| 44 | 125 mm 6.6 mm thick |
| 45 | 150 mm 4.8 mm thick |
| 46 | 150 mm dia MSERW |
| 47 | 125 mm 4.8 mm thick |
| 48 | 100 mm 4.8 mm thick |
| 49 | 80 mm dia GI |
| 50 | 65 mm dia GI |
| 51 | Supply and fixing of the following fittings including cartage of materials, labour and T&P etc. complete.Pressure Reducing Valves250 mm dia |
| 52 | 200 mm dia |
| 53 | 150 mm dia |
| 54 | 125 mm dia |
| 55 | 100 mm dia |
| 56 | 80 mm dia |
| 57 | 65 mm dia |
| 58 | Supply and fixing of Air Valve with all material & T&P etc completefor 80 mm dia |
| 59 | for 65 mm dia |
| 60 | S/F of IOT Based Ultrasonic Bulk water flow meter for Pipe lines including cartage of materials, labour and T&P, including nut bolts, high-pressure rubber/fiber washer packing, etc., complete in all respects.65mm |
| 61 | 80 mm |
| 62 | 100 mm |
| 63 | 125 mm |
| 64 | 150 mm |
| 65 | 200 mm |
| 66 | 250 mm |
| 67 | Supply and fixing of Double flange Isolation Valves (Sluice Valves) CI class PN 10 (IS code 14846-2000) with including nut bolts, high-pressure rubber/fiber washer packing, etc., complete in all respects. (As per Clause No 1.6)65mm |
| 68 | 80 mm |
| 69 | 100 mm |
| 70 | 125 mm |
| 71 | 150 mm |
| 72 | 200 mm |
| 73 | 250 mm |
| 74 | 300 mm |
| 75 | Supply and fixing of Fire Hydrants 80 mm Stand Post Type (confirming to IS 5290) including cartage of materials, labour and T&P etc. complete as per site requirement and type design |
| 76 | Construction of following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.P R V Chamber 90x90x100 cm size |
| 77 | Construction of following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.Air Valve Chamber 90x90x100 cm size |
| 78 | Construction of following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.Bulk Flow meters Chamber 90x90x100 cm size |
| 79 | Construction of following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.Isolation Valve Chamber 90x90x100 cm size |
| 80 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 m, stacking serviceable and unserviceable materials separately stacking serviceable and unserviceable materials separately backfilling the excavation earth to the extent required and utilizing the remaining earth locally for road work. |
| 81 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work up to plinth level 1:2:4 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 82 | Investigation, design and construction of following Pump House including testing, cost of all materials & fittings, supply and cartage of all material, Labour and T&P etc, complete. Structural design should be from IIT or equivalent institution. 1 nos Kaliyasaur,2 nos Shrikot, 1 nos Ufalda, 1 no Srinagar, 1 no Nakot |
| 83 | Demolishing of Old damaged structures @ Pump Stations.At MPS Srinagar andAt MPS Srikot |
| 84 | Provision for Boundary wall including cartage of materials, labour and T&P etc. complete for all round the land for preventing approach of unauthorized souls. ( As per approved Drawing & Design)Pump House |
| 85 | Provision for M.S. Iron Gate as per type design including cartage of materials, labour and T&P etc. complete.All Structures |
| 86 | Provision for barbed wire fencing including cartage of materials, labour and T&P etc. complete for all round the land for preventing approach of unauthorized souls.All Structures |
| 87 | Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. For pipe line in following strata including supply of labour, T&P. etc complete. Assuming that 75% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and rest 25% will be in medium rock.In soil mixed with boulders @ 75 % |
| 88 | In soft rock @ 25 % |
| 89 | VALVES:- Supply and fixing of double flanged C.S. valves, (class 300) including nut bolts, high-pressure rubber/fiber washer packing, etc., complete in all respects.Sluice Valve300 mm |
| 90 | 250 mm |
| 91 | 150 mm |
| 92 | 125 mm |
| 93 | 100 mm |
| 94 | Non Returning Valve:-Supply and fixing of C.S. Flow Control Non Return Valve (Class 300) for Avg. Flow 10 Ipm. Material of construction to be SS 304. Connection threading IS:554 BSPT, ISO: 7-1. Valve consiste of proprietary design which regulates the designed flow. All machined parts sha including all materials, labour, T & P etc complete . 300 mm |
| 95 | 250 mm |
| 96 | 150 mm |
| 97 | 125 mm |
| 98 | 100 mm |
| 99 | Construct following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.Wheel Valve Chamber 90x90x100 cm size |
| 100 | Construct following valve chambers as per type design including cartage of materials, labour and T&P etc. complete.N R V Chamber 90x90x100 cm size |
| 101 | Supply of all materials, labours, T.&P. etc. and construct RCC Anchor Blocks M-25 as per type design including cartage of materials, labour and T&P etc. complete.0.90 x 0.90 x 0.90 m |
| 102 | 1.00 x 1.00 x 1.00 m |
| 103 | 1.20 x 1.20 x 1.20 m |
| 104 | 1.25 x 1.25 x 1.25 m |
| 105 | 1.30 x 1.30 x 1.30 m |
| 106 | 1.35 x 1.35 x 1.35 m |
| 107 | 1.40 x 1.40 x 1.40 m |
| 108 | 1.45 x 1.45 x 1.45 m |
| 109 | 1.55 x 1.55 x 1.55 m |
| 110 | 1.60 x 1.60 x 1.60 m |
| 111 | 1.65 x 1.65 x 1.65 m |
| 112 | 1.70 x 1.70 x 1.70 m |
| 113 | 1.80 x 1.80 x 1.80 m |
| 114 | 1.90 x 1.90 x 1.90 m |
| 115 | 1.95 x 1.95 x 1.95 m |
| 116 | 2.05 x 2.05 x 2.05 m |
| 117 | PUMP :- SITC of submersible Pump and Motor sets as per specified specifications. At Bore well 1 Kaliyasaur for capacity of 550 LPM , 60 mtr Head, multistage, closed impeller, etc complete |
| 118 | SITC of Starter Suitable for above Pump set |
| 119 | PUMP :- SITC of centrifugal Pump sets as per specified specifications. For Top CWR Kaliyasaur for capacity of 550 LPM, 333 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 120 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump set |
| 121 | SITC of ATS for above pump set |
| 122 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 123 | PUMP :- SITC of centrifugal Pump sets as per specified specifications. For MPS Shrikot for capacity of 3500 LPM, 92 Mtr head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 124 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 125 | SITC of ATS for above pump set |
| 126 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. |
| 127 | PUMP :-SITC of centrifugal Pump sets as per specified specifications. For IPS Shrikot for capacity of 750 LPM, 432 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 128 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 129 | SITC of ATS for above pump set |
| 130 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 131 | PUMP :- SITC of centrifugal Pump sets as per specified specifications. For Mps Banswada Bughaniu for capacity of 2700 LPM, 172 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 132 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 133 | SITC of ATS for above pump set |
| 134 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 135 | PUMP :-SITC of centrifugal Pump sets as per specified specifications. For Mps Banswada Rewadifor capacity of 250 LPM, 127 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 136 | Motor:--Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 137 | SITC of ATS for above pump set |
| 138 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 139 | PUMP :-SITC of centrifugal Pump sets as per specified specifications. For Mps Banswada Khola for capacity of 500 LPM, 295 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 140 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 141 | SITC of ATS for above pump set |
| 142 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 143 | PUMP :- SITC of centrifugal Pump sets as per specified specifications. For Top CWR Daang for capacity of 2400 LPM, 141 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 144 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 145 | SITC of ATS for above pump set |
| 146 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 147 | PUMP :- SITC of submersible Pump and Motor sets as per specified specifications. At Bore well 2 Ufalda of capacity of 800LPM, 50 mtr Head, multistage, closed impeller, etc complete |
| 148 | SITC of Starter Suitable for above Pump set |
| 149 | PUMP :- SITC of centrifugal Pump sets as per specified specifications. For Top CWR Ufalda for capacity of 800 LPM, 232 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 150 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 151 | SITC of ATS for above pump set |
| 152 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 153 | PUMP :- SITC of submersible Pump and Motor sets as per specified specifications. Bore well 3 Nakot of capacity of 550 LPM , 69 mtr Head, multistage, closed impeller, etc complete |
| 154 | SITC of Starter Suitable for above Pump set |
| 155 | PUMP :- SITC of centrifugal Pump and Motor sets as per specified specifications. For Top CWR Nakot for capacity of 550 LPM, 340 mtr Head, multistage, closed impeller, Stud, Flexible pin bush type Coupling, coupling bush and bolt /Coupling Guard, MS Base Plate, Foundation Bolt etc complete |
| 156 | Motor:- Supply, installation, testing & commissioning of (IE3 motor IEC 60034-30-1 standard) squirrel cage induction motor , Suitable to above pump |
| 157 | SITC of ATS for above pump set |
| 158 | SITC of Control Panel as per standard Code IS/IEC 6149 (part 1&2) or IS/IEC 60947-4-1:2018 and BIS certified or ISI marks. Suitable For above pump set. |
| 159 | Power:- Wiring And Earthling: Complete earthling for pumping plants (providing Earthling with copper earth plate 600 mm X 600 mm X 3 mm thick, including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 meters long, etc., with charcoal/ coke and salt as required) as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 160 | Supply and fixing of 10 sqmm 3 core copper cable |
| 161 | Supply and Fixing of CSDF Sluice valve 300 mm dia Class 300 |
| 162 | Supply and Fixing of CSDF Sluice valve 250 mm dia Class 300 |
| 163 | Supply and Fixing of CSDF Sluice valve 200 mm dia Class 300 |
| 164 | Supply and Fixing of CSDF Sluice valve 150 mm dia Class 300 |
| 165 | Supply and Fixing of CSDF Sluice valve 125 mm dia Class 300 |
| 166 | Supply and Fixing of CSDF NRV 300 mm dia Class 300 |
| 167 | Supply and Fixing of CSDF NRV 250 mm dia Class 300 |
| 168 | Supply and Fixing of CSDF NRV 200 mm dia Class 300 |
| 169 | Supply and Fixing of CSDF NRV 150 mm dia Class 300 |
| 170 | Supply and Fixing of CSDF NRV 125 mm dia Class 300 |
| 171 | Supply and Fixing of Pressure / Compound Gauges as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 172 | Supply and Fixing of Rubber electric resistance sheet as per design and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 173 | Supply and Fixing of Termination Kit 120 sqmm as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 174 | PAINTING:- Enamel painting complete in all pump sets, foundation, valves, suction and delivery pipes, barrel pipes, as per suitable matching colour or as per the direction of the engineer in charge, etc., complete in all respects |
| 175 | Supply and Fixing of Cable Tray as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 176 | Supply and Fixing of Cable Glands as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 177 | Supply and Fixing of MS Fabricated Base Frame with Coupling Guard as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 178 | Supply and Fixing of Coupling as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 179 | Installation of Pump & Motor as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 180 | Transportation of Pumps, Motors, Valves, Panels with Loading & Unloading etc. complete in all respect. |
| 181 | SITC of hand operated travelling crane (HOT) IS: 2429 4 Tone capacity as per design, drawing and specification or as directed by the engineer in charge, including all labour, material, T&P, etc., complete in all respects. |
| 182 | SITC of Transformer at Top CWR Kaliyasaur 125 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 183 | SITC of Transformer for MPS Shrikot 225 KVA with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 184 | SITC of Transformer for IPS Shrikot 200 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 185 | SITC of Transformer for Mps Banswada Bughaniu 250 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 186 | SITC of Transformer for Mps Banswada Rewadi 25 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 187 | SITC of Transformer for Mps Banswada Khola 100 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 188 | SITC of Transformer for Top CWR Daang 225 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 189 | SITC of Transformer for Bore well 2 Ufalda 125 KVA , with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 190 | SITC of Transformer for Bore well 3 Nakot 125 KVA, with all T&P and complete work (As per Clause No 1.06 and 1.07) |
| 191 | Installation of Transformers and Charging etc. complete. |
| 192 | Transportation of transformer with Loading & Unloading etc complete. |
| 193 | SITC OF STABILIZER for Top CWR Kaliyasaur 125 KVA |
| 194 | SITC OF STABILIZER for MPS Shrikot 225 KVA |
| 195 | SITC OF STABILIZER For IPS shrikot 200 KVA |
| 196 | SITC OF STABILIZER For MPS Banswada Bhughaniu 250 KVA |
| 197 | SITC OF STABILIZER for MPS Banswada Rewadi 25 KVA |
| 198 | SITC OF STABILIZER MPS Banswads Khola 100 KVA |
| 199 | SITC OF STABILIZER Top CWR Daang 225 KVA |
| 200 | SITC OF STABILIZER Bore well 2 Ufalda 125 KVA |
| 201 | SITC OF STABILIZER Bore well 3 Nakot 125 KVA |
| 202 | Transportation of Stabilizer with Loading & Unloading etc complete. |
| 203 | Providing, Commissioning and Installation of Powder coated & CNC Fabricated electric Control Panel for Automation System of 14 SWCG CRCA sheet thickness and which includes PLC (Programmable Logic Controller) with digital & analog inputs and outputs to give automatic command to star Delta starter panel/ Energy saving variable frequency starter panel, electronic relay card 8 channel, SMPS 4.5 Amps to energize PLC system, HMI (Human Machine Interface) 7\\" display for monitoring & controlling of centrifugal pumps, mobile app (Android/IOS) with User ID & Password to monitor & control the pumping operation from mobile for 3 users. Cloud gateway for Data Clouding to server, SCADA software to be installed in laptop/PC to remotely monitor & control the operation of pumps and also to analysis the pump start and stop history, logging, fault status. fault history, Power Quality Parameters like PF. Current, Voltage, KWH. etc and Software Development to the entire satisfaction of Engineer in Charge. |
| 204 | Supply, Installation. Development Testing, Configuration, and Commissioning of a web-based SCADA System with Industrial Grade 4U Rack mount server PC 400Watt ATX Industrial Grade Power Supply Industrial Grade Mother board Intel core-i7 processor 16 GB RAM Make: Siemens/Schneider/Advantech 512 GB SSD 2 x Ethernet Port 2 x Serial Com Port 4 x USB Port DVD R/W Logitech Key board & mouse 26\\" Dell make monitor Windows 10 professional operating systems, Intelligent communication gateway for IoT application , Web based SCADA License key with appropriate tags. |
| 205 | SlTC of Electromagnetic Flow meter SCADA compatible of max 200 mm dia with weatherproof IP67 as per IS/IEC Display device helps to continuously measure the discharge of water being generated. |
| 206 | SlTC of Pressure Transmitter device SCADA compatible helps to measure the pressure of water. |
| 207 | SITC of Ultrasonic Level Transmitter SCADA compatible device measures the level of water in the sump and displays the same at LCS/MCS. This facilitates automatic operation of pump based on the level of the tank.(make SBEW Krohne Marshal/Siemens) |
| 208 | SITC’ of Control Cabling of all equipment for SCADA Automation. |
| 209 | Cost of Environment & Social Safeguard |
| 210 | Provision for Environment, social health and safety compliances as per act, bylaws, norms, rules/statutory provisions and mentioned and bid documents management. GIS mapping of complete water supply scheme including Intake works, Rising m Water Treatment Plants, Pump House, Gravity Mains, Distribution Networks, Water Reservoirs, Valves, Pressure Relief val Flow meter, Fire Hydrant, Air Valves and other appurtenant works etc. including GIS mapping of House Service Connections. |
| 211 | Trial and Run for 4 months including repair and maintenance, staff, chemicals, laboratory water quality test and incentives for O&M agency all newly constructed water supply scheme along with existing infrastructure which will be rented and part of completed scheme for future operation and maintenance as wholes tic water supply system complete in all respect as per direction of engineer in charge.. |
| 212 | Operation & Maintenance of water supply system for 07 year including repair and maintenance of all structures, maintain water quality through chlorination and assurance through water testing, leakage rectification, resolving all complaints, providing water tankers during scarcity of water/no water complaints, bill distribution, revenue collection by deployment of revenue officers, assurance of safety measure through deployment of chokidar etc.complete in all respect. The scope of work during phase 3 similar to O & M work mentioned in bid document i.e. for phase -3 complete including all tube wells, submersible pump set, motors, starter panels, flow meters, MCS, PLC/SCADA, instrumentation and allied equipment complete, including operation, preventive and breakdown repair, maintenance, manpower, spare, consumables, tools & tackles, (All Old & New CWR, pipe line and All water meter under Srinagar Nagar Nigam Area) all incidental works, including diesel and excluding electricity cost, complete in all respects as directed by Engineer-in-Charge.O&M - During First Year |
| 213 | O&M - During Second Year |
| 214 | O&M - During Third Year |
| 215 | O&M - During Fourth Year |
| 216 | O&M - During Fifth Year |
| 217 | O&M - During Sixth Year |
| 218 | O&M - During Seventh Year Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender