Tender For Repair/Renovation Of Standard Make Apfc Panel & Electrical Panel At R-Pocket Dilshad Garden Bps.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Nov 2026
4 days left
EMD
11500
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/Renovation Of Standard Make Apfc Panel & Electrical Panel At R-Pocket Dilshad Garden Bps.
BOQ
| Sl. No. | Item Description |
| 1 | REPAIR/RENOVATION OF LT STARTER Panel: 01 No. Dismantling of defective components from the LT Panel after suitably checking live parts to ensure safety of the working persons along with dismantling of timer contactors MCCBs single phase preventer, MCBs including dismantling of terminations and existing hard work, rusted parts and various other items requiring change in the panel as required at site. |
| 2 | Supply of triple pole MCCB of 200 A Capacitor for operation and safety of individual feeders. Make L&T /Schneider/ Havells/Standard |
| 3 | Supply of triple pole contactor model MNX-70 of L&T make or equivalent items of Schneider, havells make to replace defective contactor in the LT panel |
| 4 | Supply of triple pole Contactor model MNX -110 of L&T make or equivalent item of Schneider, Havells make to replace defective Contactor in the LT panel. |
| 5 | Supply of Timer to replace defective Timer in the LT panel. Make - CIC |
| 6 | Supply of 0-300A Ammeter complete with selector switch and set of 3 nos. CTs for monitoring parameters of each motor, make -AE/HPL/Havell's Eqv. |
| 7 | Supply of 0-500V digital Voltameter with selector switch make-AE/HPL |
| 8 | Supply of LED indication lights of various colours to replace defective/burnt out lights make -standard/FTC |
| 9 | Power wiring with 25 sq mm for connection between Contactor Star Delta and MCCB & bus bar with copper lugs and necessary hardware etc. as required at site. |
| 10 | Control wiring with 1.5 sq mm for connection between contactor and timer & Bus bar with copper lugs and necessary hardware etc. as required at site. |
| 11 | Servicing of panel including decarbonising of contacts, Contactor, Bus bar & MCCBs terminations, tightening of all nut bolts, cleaning of various components and dusting of complete panel. |
| 12 | Fixing of all above components in the LT panel with suitable fabrication work to accommodate new items in the existing feeders for alignment of components and ease of termination complete with hardware etc. as required at site. |
| 13 | Testing & commissioning of LT Stater Panel as per required parameters including following :- (i) Continuity and earth test, (ii) Programming of Electronic Motor Protection Relay (iii) Programming of Electronic Motor Protection to phase and phase to earth. (iv) Checking of tightness of all nut and bolts, (v) Monitoring of power factor |
| 14 | REPAIR/ RENOVATION OF APFC PANEL: 01 NO. Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors to ensure safety of the working persons along with dismantling of Capacitors, APFC relay, indications lights, meters, A/M switches including dismantling of terminations and existing hardware and rusted parts and various other items requiring change in the panel as required at site. |
| 15 | Replacement of defective Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz system complete with terminal cover, cable end entry, mounting structure and hardware etc. -Make Standard |
| 16 | Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. |
| 17 | Replacement of defective APFC relay, with new microprocessor based APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make Standard |
| 18 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. |
| 19 | Replacement of defective capacitor duty contactors suitable for 15 KVAr capacitors with new capacitor duty contactor. Make Standard/EPCOS |
| 20 | Replacement of defective capacitor duty contactors suitable for 10 KVAr capacitors with new capacitor duty contactor. Make Standard/EPCOS |
| 21 | Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard |
| 22 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make L&T/EPCOS/Standard |
| 23 | Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make Standard/L&T |
| 24 | Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site. |
| 25 | Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site |
| 26 | Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site |
| 27 | Testing & Commissioning of complete APFC Panel installation including following: (i) Meggering of complete capacitor installation using 500V egger (ii) Continuity test for checking continuity of all circuits to ensure that all circuits are properly wired. (iii) Checking function and efficiency of various components of APFC panel. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 27, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 02, 2026
Bid Opening Date
Technical bids will be opened and evaluated.