Tender For Rev Ing Of Chemical Dosing System Ongc Mehsana Asset
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Dec 2026
55 days left
EMD
79.10 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Mahesana → Gujarat
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Rev Ing Of Chemical Dosing System Ongc Mehsana Asset
BOQ
| Sl. No. | Item Description |
| 1 | LUMP SUM PRICE for material & services for the entire scope of work for LSTK Project of \\"Revamping of Chemical Dosing System ONGC Mehsana Asset |
| 2 | TOTAL LUMP SUM PRICE for the LSTK project inclusive of GST OIL AND NATURAL GAS CORPORATION LTD. CENTRAL PROCUREMENT DEPARTMENT-LSTK \\"Revamping of Chemical Dosing System ONGC Mehsana Asset\\" PROFORMA FOR PRICE SCHEDULE APPENDIX A-3 OF VOLUME-I Tender No.:ZV8BC26005 Notes: Note 1: Only Yellow Coloured Cells to be filled. Note 2: This excel workbook has Five work sheets. Please fill all the Five sheets very carefully and upload as per this price format. Note 3: Please refer general notes below. Name of Bidder : x Bid Reference No. x PRICE SCHEDULE-I I LSTK Project Sl. no. Items Currency INR A LUMP SUM PRICE for material & services for the entire scope of work for LSTK Project of \\"Revamping of Chemical Dosing System ONGC Mehsana Asset\\" (The detailed scope of work has been provided in Technical Bid package). x B Insurance in compliance of clause 7.3 of the GCC (i.e. Sum of B-1 to B-6 below) 0.0 B-1 Contractor’s All Risk Insurance / Erection All Risks/ Storage Cum Erection Insurance (including Offshore and Onshore Terrorism cover) x B-2 Cargo Transit Insurance x B-3 Third Party Liability Insurance x B-4 Motor Vehicles Package Policy which includes Third Party Liability x B-5 Workmen’s Compensation Insurance / Employer’s Liability Insurance x B-6 Contractor’s Constructional Plant and Equipment x C IGST/ CGST & SGST/ UTGST as applicable on (A+ B) x D TOTAL LUMP SUM PRICE for the LSTK project inclusive of GST (i.e. A+B+C) 0.0 E MATERIAL CONTENT / COMPONENT ELIGIBLE FOR PEL/ML BENEFITS (i) Amount included in Item A above (Material Cost) for availing concessional IGST/ SGST & CGST/UTGST as applicable, as per Notification No.3/2017 - Central Tax (Rate) Dated 28.06.2017 (or amended thereafter). (For Domestic Procurement of materials) x (ii) Amount included in item A above (Material Cost) for availing Custom Duty Exemptions with Concessional IGST rate for PEL/ML areas as per Notification no. 50/2017-Customs Dated 30.06.2017 (or amended thereafter). ONGC shall issue Recommendatory letter for obtaining EC for above (For Import of materials) x General Notes: |
| 3 | Payment shall be made as per Milestone Payment Formula for the respective works. |
| 4 | Cost of material shall include cost of the materials/ equipments etc. required to be incorporated in the works, aids for fabrication, transportation and installation, cost of spares and any special tools & tackles required for pre commissioning, lubricants, chemicals and consumables for testing/ pre-commissioning and the cost of consumables for startup/ commissioning as well as for duration of operation as per details given in bidding documents. |
| 5 | Bidders to ascertain themselves all the applicable taxes & duties and include in their offer all such taxes and duties as applicable. Bidders also to indicate ONLY such taxes & duties in relation to this contract, which the bidder is liable to pay directly to Indian Tax authorities separately in the price format at I-C. Payment of IGST, CGST, SGST, UTGST etc. (which bidder is required to pay directly to Indian Tax Authorities) would, however, be made at actuals in Indian Rupees upon submission of documentary proof of duty assessment & payment (through deposit or through credit) thereof and would further be limited to the amount indicated in price schedule, whichever is less. No reimbursement shall be made to the bidder for Custom Duty, IGST, CGST, SGST, UTGST etc., paid by bidders to their Sub Contractor, Vendors, Agents etc. Change in law is not applicable against such taxes & duties (i.e. Custom Duty, IGST,SGST,CGST,UTGST etc.) paid by bidders to their Sub Contractor, Vendors, Agents etc. |
| 6 | The above costs i.e. total lump sum price are all inclusive costs for providing the material & services as per the requirements contained in the Bidding Documents read with subsequent amendments/addendum /corrigendum /clarifications conveyed to the bidder.Bidder to note that price quoted at sl. no. D above i.e. TOTAL LUMPSUM PRICE for complete scope of work of the tender (i.e. A+B+C) shall be considered for ascertaining the ranking of bidders. |
| 7 | TDS as applicable under statute, will be deducted. |
| 8 | Deleted |
| 9 | Bidders to consider various Custom & GST exemptions/Concessional rate available for eligible PEL/ML areas. |
| 10 | In cases where Contractors contends that their Corporate Policies with worldwide coverage meets the insurance requirements of the contract in respect of Policies from B-1 to B-6 under item B above, Contractor needs to ensure that all the conditions mentioned in the contract in respect of insurance are complied with. Any other policy not mentioned above but required to be taken on the basis of specific nature of contract, as mentioned in the contract should also be included in the Total Insurance cost. |
| 11 | Refer scope of work mentioned under Vol-II of the tender documents. |
| 12 | Deleted |
| 13 | Local Content Compliance and Payment Condition:The Contractor shall ensure that the percentage of local content declared in Appendix B-25 in accordance with relevant Para of ITB and the Public Procurement (Preference to Make in India) Order is actually achieved during execution of the Contract and shall submit Local Content Certification, duly certified by a Cost Accountant or Chartered Accountant in practice, during execution of the project but not later than submission of the Final Bill or before achieving ninety percent (90%) of financial progress, whichever is earlier. Failing submission of such certification within the stipulated time, ONGC shall withhold ten percent (10%) of the Contract Value, and payment of the last ten percent (10%) of the Contract Value shall be made only after receipt and acceptance of the aforesaid Local Content Certification, confirming compliance with the local content category declared at the time of tendering. Further, in the event the Contractor fails to meet the declared local content requirement resulting in change of supplier category from Class-I to Class-II/Non-Local or from Class-II to Non-Local, ONGC shall levy a penalty of ten percent (10%) of the Contract Value. |
| 14 | The bidder shall be deemed to have visited and examined the site, fully acquainted themselves with the existing site conditions,including sub soil strata, nature of work, and all factors affecting the execution of work before submission of the price bid. Name of Authorised Signatory: Designation: Place and Date: II UNIT ADJUSTMENT RATE (Deleted) III Cost Re-Imbursable Additional Items : Cost Plus Percentage |
| 15 | Percentage fee applicable to cost of material used for extra work items. |
| 16 | Percentage fee applicable to equipment subcontracts for extra work |
| 17 | Percentage fee applicable to labour subcontracts for extra work |
| 18 | Percentage fee applicable to one year’s spares Notes: |
| 19 | The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding Documents. |
| 20 | In respect of item 4 the cost shall be reimbursed as per provision of clause 3.2.5 of part II, GCC. IV CUSTOMS DUTY : Deleted V Change In Laws and Regulations: Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the bidder’s lump sum prices for the Works (as quoted in the Appendix A-3, I through V) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under: Sl. no. ITEM Bidding Documents Clause Reference Laws / Acts / Rules / regulations reference Tarif indicating rate of tax/ duty/ fee/ charge/ levy Tax Amount included in the Lump sum price (Add taxes together for all locations/ works) 1.0 2.0 3.0 4.0 5.0 |
| 21 | IGST/ CGST & SGST/ UTGST as applicable on following:- Notes: |
| 22 | Bidder may suitably add other heads/columns/rows to indicate all the provisions and related information with regard to above. Bidders are requested to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. Strike out the items, which are not applicable or write `not applicable’. |
| 23 | The Taxes and duties shown above shall tally with the same quoted in Price Format. |
| 24 | Change in law shall not be applicable to taxes and duties in respect of subcontractors, venders etc. of contractors. |
| 25 | Bidder shall indicate the details of Laws/ Acts / Rules/ Regulations reference and tariff indicating rates of tax/ duties/ fee/ charge/ levy under Column 3 & 4 respectively in the unpriced bid also. |
| 26 | Bidders are advised to refer thoroughly scope of work (all disciplines), price impacting activities in the entire terms & conditions mentioned in the tender documents. |
| 27 | For clarity on tax clauses and change in law clauses of GCC, bidder/ contractor may note the following:a. If there is any difference in rate between quoted rate of tax and applicable rate of tax as on bid submission date, then such difference in rate will be maintained for effecting change in law, if any, in future. Without prejudice to any other remedies available to company in the contract or in Law, in case of change in laws during scheduled completion period (included extended period without levy of LD/without reserving right to levy LD), irrespective of amount and rates of taxes quoted by successful bidder/contractor, the total quoted amount (including tax amounts) will be considered as inclusive of all applicable tax amounts which are applicable on the date of bid submission and accordingly, difference between applicable rate of taxes on the date of bid submission and the rates of taxes applicable on the date of change in law, will be reimbursed to successful bidder/contractor by company in case such difference is positive and such difference will be recovered from the successful bidder/contractor by the company in case such difference is negative. b. In case the quoted tax rate/tax amount is less than the applicable tax rate/ tax amount on date of bid submission, it would be considered that the difference in the two rates/amounts is included in the amounts quoted in other quoted line items, other than the quoted tax amount and (i) payment/reimbursement will be limited to considering the quoted tax rate or the quoted tax amount or the amount shown in proof of payment, whichever is lower and (ii) in case there is a change in law, such difference between the quoted tax rate/tax amount and the applicable tax rate/ tax amount on date of bid submission, will be subtracted from the base value (base value is the amount on which taxes are applied which would be derived from the total quoted/contract value inclusive of taxes) to arrive at the net base value on which effect of change in law would be applied. c. In case the quoted tax rate/tax amount is more than the applicable tax rate/ tax amount as on the date of bid submission (i) payment/reimbursement will be restricted to the lower of the two and (ii) in case there is a change in law, it will be treated as per Point \\"a\\" above. Name of Authorised Signatory Designation Place and Date Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 26, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 55 daysDec 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 56 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender