Tender For Supply, Installation, Testing And Commissioning Of Co2 Based Fire Detection And Suppression System Of Stage I&Ii (Renovation And Modernization) & Supply, Installation, Testing And Commissioning Of Digital Weight Monitoring Module In 72 Nos
Tender Overview
Project Description
Tender for Supply, Installation, Testing And Commissioning Of Co2 Based Fire Detection And Suppression System Of Stage I&Ii (Renovation And Modernization) & Supply, Installation, Testing And Commissioning Of Digital Weight Monitoring Module In 72 Nos Co2 Cylinders Of Stage-I Of Salal Power Station.
BOQ
| Sl. No. | Item Description |
| 1 | Supply Part (Fire Detection and Suppression System of Stage-I&II): Supply of items for the renovation and modernization of the carbon dioxide (CO₂)-based firefighting system of the Stage-I & II Generators of Salal Power Station. |
| 2 | Main fire detection and fire suppression control panel. |
| 3 | Repeater panel |
| 4 | CO2 Pilot cylinder capacity 45 Kg, with solenoid valve & manual operation lever |
| 5 | Heat detectors |
| 6 | Smoke detectors |
| 7 | Fire alarm hooter with flasher |
| 8 | Brass NRV for Co2 cylinders between HP hose of each cylinder to manifold |
| 9 | Main HP Hose wire braided HP hose with fitting for Co2 cylinders to manifold (approx. 650mm long) |
| 10 | Inter connecting hose with fitting (slave CO2 to Slave CO2) (approx. 600 mm long) |
| 11 | Inter connecting hose with fitting (slave CO2 to Manifold) (approx. 600 mm long) |
| 12 | Initial discharge nozzle horn type |
| 13 | Delayed discharge nozzle hooded type |
| 14 | Manual release button |
| 15 | Directional valve high pressure 24V DC |
| 16 | High pressure ball valve |
| 17 | Door limit switch |
| 18 | Gas discharge indicator |
| 19 | Bleeder valve |
| 20 | Teflon cable 1.0 sqmm 2 core silver coated |
| 21 | Pressure switch for Co2 discharge |
| 22 | Squeeze grip valve |
| 23 | Non return Valves for header |
| 24 | Manifolds for all banks, discharge ring header for barrels and complete pipeline from Co2 banks to Generator barrel for 06 units |
| 25 | Pipe support for pipe line |
| 26 | Pipe fittings |
| 27 | Flanges |
| 28 | Misc hardware |
| 29 | Control cable 2C 1.5 Sqmm multistrand copper armored cable |
| 30 | Control cable 10C 1.0 Sqmm multistrand copper armored cable |
| 31 | Mandatory spares: Mandatory spares for Co2 Fire Fighting system |
| 32 | Main fire control panel card of each type |
| 33 | CO2 Pilot cylinder (Filled with CO2) capacity 45 Kg, with solenoid valve & manual operating lever |
| 34 | CO2 Slave cylinders (Capacity: 45 KG, filled with CO2) with actuator |
| 35 | Heat detectors |
| 36 | Smoke detectors |
| 37 | Initial discharge directional valve |
| 38 | Delayed discharge directional valve |
| 39 | NRV for Initial bank header |
| 40 | NRV for delayed bank header |
| 41 | Bleeder valve for Initial bank header |
| 42 | Bleeder valve for delayed bank header |
| 43 | Squeeze grip valve/ safety valve for Initial bank header |
| 44 | Squeeze grip valve/ safety valve for delayed bank header |
| 45 | Brass NRV for Co2 cylinders between HP hose of each cylinder to manifold |
| 46 | Main HP Hose wire braided HP hose with fitting for Co2 cylinders to manifold (approx. 650mm long) |
| 47 | Inter connecting hose with fitting (slave CO2 to Slave CO2) (approx. 600 mm long) |
| 48 | Inter connecting hose with fitting (slave CO2 to Manifold) (approx. 600 mm long) |
| 49 | Service Part (design, erection, testing and commissioning of Carbon dioxide based firefighting system of Stage -I & II Generators) |
| 50 | Service part (dismantling of existing system firefighting system of Stage -I & II Generators) |
| 51 | Supply Part (Installation of Digital weight monitoring system in Stage-I only): Supply of Digital weight monitoring module for 72 Nos Co2 cylinders of Stage-I Units, along with Supporting structure and common alarm panel.\\" |
| 52 | Digital weight monitoring module with load cell |
| 53 | Support Structure for Co2 Cylinders |
| 54 | Addressable type Common control panel |
| 55 | Power supply |
| 56 | Service Part (Installation of Digital weight monitoring system in Stage-I only): Design erection testing and commissioning of Digital weight monitoring module in 72 Nos Co2 cylinders of Stage-I |
| 57 | Transportation : Transportation , packing and forwarding and transit insurance. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender