Tender For Providing And Fixing Of Wall Panelling, Vinyl Flooring And False Ceiling In The Reinforced Cement Concrete Building For Establishing The Gleeble Thermo-Mechanical Physical Simulator Laboratory At Iit Hyderabad, Kandi, Sangareddy.
Tender Overview
Project Description
Tender for Providing And Fixing Of Wall Panelling, Vinyl Flooring And False Ceiling In The Reinforced Cement Concrete Building For Establishing The Gleeble Thermo-Mechanical Physical Simulator Laboratory At Iit Hyderabad, Kandi, Sangareddy.
BOQ
| Sl. No. | Item Description |
| 1 | Supply, installation, testing and fixing of 50 mm thick double-skin concealed tongue-and-groove modular wall panels, manufactured from 0.80 mm thick PPGI/Pre-coated GI sheets on both sides with protective guard film and filled with PUF insulation of density 40 ± 2 kg/m³, including bottom GI/PPGI floor track, perimeter profiles, interlocking joints, necessary fasteners, trims and accessories. All panel joints shall be properly aligned and sealed with cleanroom-compatible silicone sealant to achieve an airtight, smooth and hygienic finish. The item shall also include provision and concealed installation of 1 No. 32 mm dia PVC conduit run inside the PUF partition panel, including bends, couplers, draw wire and all necessary accessories. Further including supply and installation of R70 extruded aluminium coving at wall-to-wall and wall-to-ceiling junctions, with approved polyester powder-coated finish matching the wall panel colour, including connectors, fixing accessories and cleanroom-compatible sealant, and 3D aluminium corner coving pieces at all required internal corners. Complete in all respects including cutting, fitting, alignment, sealing, finishing, protection and removal of protective film after completion, as per approved drawings, specifications and instructions of the Engineer-in-Charge. |
| 2 | Partition wall panels |
| 3 | Supply, installation, testing and fixing of 50 mm thick double-skin walkable modular false ceiling panels, having 0.80 mm thick PPGI sheets on both sides, hot-dip galvanized with zinc coating of minimum 120 GSM, powder-coated in approved colour as decided by the Client, with internal GI framework and PUF insulation of density 40 ± 2 kg/m³, designed for a minimum load-bearing capacity of 100–125 kg/m², or as specified in the tender technical specification, including all necessary mounting and suspension accessories. Ceiling panels shall be interlocking/tongue-and-groove type and shall be suspended from the overhead structure using threaded tension rods, adjustable turnbuckles, GI support members, clamps, brackets and other approved accessories, with suspension/support arrangement suitable for site conditions and for a false ceiling-to-true-ceiling height varying from 2.8 m to 6.0 m, including additional reinforcement/support wherever required for walkability and Minimum Vendor-Declared Load Bearing Capacity: 100–125 kg/mThe item shall include complete provision for integration of HEPA filter modules, diffusers, light fixtures, pipe drops, electrical drops and other ceiling-mounted services, including required cut-outs, framing/reinforcement and finishing. All ceiling panel-to-panel joints shall be maintained at 3–4 mm maximum joint width and properly sealed. All gaps between panel-to-panel, ceiling panels and HEPA modules/diffusers/pipe/electrical drops and other ceiling elements shall be sealed with FDA-approved food-grade, cleanroom-compatible silicone sealant, of the same or nearest approved colour as the ceiling panel. All gaps between ceiling panels and adjacent civil walls shall be properly closed using powder-coated aluminium L-angle, securely fixed to the civil wall and ceiling panels. All panel-to-panel gaps shall additionally be closed/sealed with suitable PPGI/GI aluminium closure strips/sheets as required to achieve an airtight, smooth and hygienic finish.Complete with all GI/PPGI framework, suspension rods, turnbuckles, brackets, clamps, fasteners, supports, reinforcement, trims, aluminium angles, closure sheets, sealants, cut-outs, edge finishing, alignment, levelling, installation and making good, including all materials, labour, tools, tackles, lifting equipment and accessories required for a complete walkable cleanroom false ceiling system, strictly as per approved tender drawings, technical specifications, site conditions and directions of the Engineer-in-Charge. |
| 4 | False ceiling-walkable type |
| 5 | Supply of Scientific metallic doors designed to fit flush in the wall panel system or Brick walls on both sides with 1.2 mm thick Galvanised iron sheets duly epoxy powder coated formed to Single rebait profile with maximum bending radius 1.2mm. Door frames to be supplied in knock down form, Butt jointed for insert each other assembly a side. The shutters to be constructed from 0.8 mm thick Galvanised steel sheet press formed to provide a 46 mm thick fully flushed double skin shell with lock seam joints at style edges. The internal construction to be honeycomb core paper craft for structural strength and flatness. The frames & shutters should have provisions for receiving all specified hardware and vision panels 300 x 600 (Double glazed ).The Door to be provided with following dorset/yale make Hardware,Stainless steel hinges,handle with push plate,morticed dead lock one side key,Standard arm door closer,kick plate,Door bottom seal etc. all complete |
| 6 | Single Leaf Sliding door Size - 1200 x 2100 mm |
| 7 | Double Leaf door Size - 1500 x 2100 mm |
| 8 | Supply and installation of homogeneous, single-layered, flexible vinyl sheet flooring of approved make, available in 2.0 m wide rolls, having an overall thickness of 2.0 mm, suitable for cleanroom/pharmaceutical applications, with uniform composition and colour throughout the thickness. The flooring shall be laid over a properly prepared, smooth, dry and level substrate using approved compatible adhesive, including surface preparation, cleaning, application of primer wherever required, cutting, laying, alignment and fixing of vinyl sheets. All sheet joints shall be hot-welded using matching/approved welding rod to form a continuous, hygienic and impervious surface. The work shall include coving/upturn at wall junctions wherever shown in the approved drawings, sealing of joints and edges, finishing, trimming, removal of excess material and complete cleaning after installation. The rate shall be inclusive of vinyl flooring material, adhesive, primer, welding rod, hot-air welding, installation/labour charges, cutting and wastage, tools, tackles, transportation, handling and all other materials and accessories required for complete installation, as per approved make, colour, tender technical specifications, drawings and instructions of the Engineer-in-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender