Bids Are invited for Renovation And Repair Of Principle Office State Unani Medical College Prayagraj
Tender Overview
Project Description
Bids Are invited for Dismantling Door Comma Windows And Clerestory Window Steel Or Wood Shutter Including Chowkhats Comma Architrave Holdfast Etc Complete And Stacking Within 50M Lead , Dismantling Of Wall Tiles Including Base Concrete And Including Stacking Dismantled Material As Directed By Engineer Incharge With Distance Of 60Mtr , Removing White Or Colour Wash By Scrapping And Sand Papering The Surface Smooth Including Necessary Repairs To Scratches Etc , Dismantaling Of Old Plaster Or Skirting Raking Out Joints And Cleaning The Surface For Plaster Including Disposal Of Rubbish To The Dumping Ground Within 50 Metres Lead , Dismantling Tile Work In Floor Laid In Cement Motar Including Stacking Of Serviceable Material And Disposal Of Uncerviceable Material Within 50M Lead As Per Direction Of Engineer In Charge , Dismantling Of Aluminium Partition Including Disposal Of Unserviceable Material Within 50M Lead As Directed By Engineer Incharge , Demolishing Of Brick Work Manually Or By Mechanical Mean Including Stacking Of Serviceable Material And Diposal Of Unserviceable Material Within 50M Lead As Per Direction Of Engineer In Charge , As Per Atc Page No 6 To 8 , Dismantling Wc Pan Of All Sizes Including Disposal Of Dismantled Materials Incharge Malba All Complete As Per Directions Of Engineerin Charge , Dismantling Of Flushing Cistern Of All Types Ci Or Pvc Or Vitrious China Including Stacking Of Useful Materials Near The Site And Disposal Of Unserviceable Materials Within 50 Metres Lead , Dismantling Of Wash Basin Of All Types Make Vitrious China Including Stacking Of Useful Materials Near The Site And Disposal Of Unserviceable Materials Within 50 Metres Lead , Demolishing Rcc Work Manually Or By Mechanical Means Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer In Charge , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , Supplying And Filling In Plinth With Sand Under Floors Comma Including Watering Comma Ramming Comma Consolidating And Dressing Cormplete , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , Steel Reinforcement For R.C.C Work Including Straightening, Cutting, Bending, Placing In Position,And Binding Allcomplete Above Plinth Level. , Providing Centering And Shuttering Including Struting Props And Removal Of It For Platform , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , Providing And Fixing Ist Quality Ceramic Glazed Wall Tiles In Wall For Dado Work In Wall Room , Providing And Fixing Aluminium Work For Doors Comma Windows Comma Ventilators And Partitions With Extruded Built Up Standard Tubular , Powder Coated , As Per Atc Page No 6 To 8 , Providing And Applying White Cement Based Putty Of Average Thickness 1Mm Of Approved Brand And Manufacture Over The Plastered Wall Surface To Prepare The Surface Even And Smooth , Providing And Fixing False Ceiling At All Height Including Providing And Fixing Of Framework Made Of Special Section Comma Power Pressed From Ms Sheets And Galvanised With Zinc Coating Of 120 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8 , As Per Atc Page No 6 To 8
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Dismantling Door comma Windows and Clerestory Window steel or Wood Shutter including Chowkhats comma Architrave holdfast etc Complete and Stacking Within 50m Lead | As per ATC |
| 2 | Dismantling Of Wall Tiles including base concrete and including Stacking dismantled material as directed by engineer incharge with Distance of 60mtr | As per ATC |
| 3 | Removing White or Colour wash by scrapping and sand papering the surface smooth including necessary repairs to scratches Etc | As per ATC |
| 4 | Dismantaling of old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | As per ATC |
| 5 | Dismantling tile work in floor laid in cement motar including stacking of serviceable material and disposal of uncerviceable material within 50m lead as per direction of engineer in charge | As per ATC |
| 6 | Dismantling of aluminium partition including disposal of unserviceable material within 50m lead as directed by engineer incharge | As per ATC |
| 7 | Demolishing of brick work manually or by mechanical mean including stacking of serviceable material and diposal of unserviceable material within 50m lead as per direction of engineer in charge | As per ATC |
| 8 | As per ATC page No 6 to 8 | As per ATC |
| 9 | Dismantling WC Pan of all sizes including disposal of dismantled materials incharge malba all complete as per directions of Engineerin Charge | As per ATC |
| 10 | Dismantling of flushing cistern of all types CI or PVC or Vitrious China including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | As per ATC |
| 11 | Dismantling of Wash basin of all types make Vitrious China including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | As per ATC |
| 12 | Demolishing RCC work manually or by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer in charge | As per ATC |
| 13 | As per ATC page No 6 to 8 | As per ATC |
| 14 | As per ATC page No 6 to 8 | As per ATC |
| 15 | Supplying and filling in plinth with sand under floors comma including watering comma ramming comma consolidating and dressing cormplete | As per ATC |
| 16 | As per ATC page No 6 to 8 | As per ATC |
| 17 | As per ATC page No 6 to 8 | As per ATC |
| 18 | As per ATC page No 6 to 8 | As per ATC |
| 19 | Steel Reinforcement for R.C.C work including Straightening, Cutting, bending, placing in position,and binding allcomplete Above plinth level. | As per ATC |
| 20 | Providing centering and shuttering including struting props and removal of it for platform | As per ATC |
| 21 | As per ATC page No 6 to 8 | As per ATC |
| 22 | As per ATC page No 6 to 8 | As per ATC |
| 23 | As per ATC page No 6 to 8 | As per ATC |
| 24 | As per ATC page No 6 to 8 | As per ATC |
| 25 | As per ATC page No 6 to 8 | As per ATC |
| 26 | Providing and Fixing Ist Quality Ceramic Glazed wall tiles in wall For dado Work in wall Room | As per ATC |
| 27 | Providing and fixing aluminium work for doors comma windows comma ventilators and partitions with extruded built up standard tubular | As per ATC |
| 28 | Powder coated | As per ATC |
| 29 | As per ATC page No 6 to 8 | As per ATC |
| 30 | Providing and Applying White cement based Putty of average Thickness 1mm of Approved Brand and manufacture over the plastered wall surface to prepare the surface even and Smooth | As per ATC |
| 31 | Providing and fixing false ceiling at all height including providing and fixing of framework made of special section comma power pressed from MS sheets and galvanised with zinc coating of 120 | As per ATC |
| 32 | As per ATC page No 6 to 8 | As per ATC |
| 33 | As per ATC page No 6 to 8 | As per ATC |
| 34 | As per ATC page No 6 to 8 | As per ATC |
| 35 | As per ATC page No 6 to 8 | As per ATC |
| 36 | As per ATC page No 6 to 8 | As per ATC |
| 37 | As per ATC page No 6 to 8 | As per ATC |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender