Housing Urban and Rular Development Government Departments Closing in 2 days TDR #58209909

Tender For The Installation And Removal Of The Pontoon Bridge At Hanuman Ghat On The Tamsa River Under Nagar Palika Parishad, Mau District.

Issued by Government Departments · Mau, Uttar Pradesh
Tender Value
11.80 Lakhs
Estimated cost
Bid Submission
31 Oct 2026
2 days left
EMD
1.18 Lakhs
Bank guarantee accepted
Document Fee
855
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mau → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For The Installation And Removal Of The Pontoon Bridge At Hanuman Ghat On The Tamsa River Under Nagar Palika Parishad, Mau District.

BOQ

Name of Work:- tuin eÅ esa uxj ikfydk ifjkn eÅ ds vUrxZr relk unh ds guqeku ?kkV ij ihik iqy ds ckaèkus] [kksyus rFkk vuqj{k.k dk dk;Z
Sl. No. Item Description
1Cartage of pantoon in river including all labour, boat and T&P etc. As per direction of E/I.
2Fixing of pantoon with langer and P.P. Rope or wire rope in side of river for pa ntoon includinb boat, all labour and T&P etc. As per direction of E.I.
3Fixing of iron girder with nut bolt including all labour, boat and T&P etc. As per direction of E.I.
4Placing of chequer plate on pontoon bridge in approach road including all labour T&P etc. Required for proper completion of the work.
5Tied work of Hanuman Ghat Pontoon bridge placing of Chaker plate on pantoon bridge including all labour T&P etc. As per direction of E.I.
6S/Filling of sand in gunny bag, stitching and carriage upto site complete work including supply of cement bag, magterials all labour T&P etc. Required for propercompletion of the work.
7Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of genrerator and drill machine over sleeper and all edging before fixing the railling post with hepl of 300x16 mm size nut and bolts at 1.25mtr. c/c including all labour, material T&P etc.
8Fixing of sal wood sleeper
9Extra work of pantoon: Supply of bamboo including all taxes, all materials, labour T&P etc. Reqd. For proper completion ofthe work.
10Supply of 150mm. Dia Uceliptus ballie including all taxes, all materials labour T&P etc. Reqd. For proper completion of the wokr.
11Supply of 12mm. Dia wire rope including all gtaxes all materials labour T&P etc. Required for proper completion of the work.
12Supply of 32mm. Dia P.P. Rope including all taxes, all materials labour T&P etc. Reqd. For proper completion of the work.
13Supply of 3 No,. Beldar for chaukidari work and safety of pipa every bad condition during and mallah work etc.oneyear date of start of bond and date of completion of bond etc.
14Annual repair work for safety of pipa and pantoon bridge and apprimoxy three time repair 2 No. Naka by 16 No. Unskilled beldar etc.Repair of naka approach and etc.Reuired for proper completion of the work(3x2x12=72)
15Opening of Hanuman ghat pantoon bridge Shifting of chakar plate on panoon bridge upto store including all labour T&P etc. Comlete work.
16Shifting of chakar plate from pantoon bridge approach road upto store including all labour T&P etc. Complete work.
17Opening of iron girder with nut bolt including boat, all labour and T&P etc. As per direction of E.I.
18Shifting of pantoon from river to site of river (Nadi ka Kinara) for safty place including boat, all labour and T&P etc. As per direction of E.I.
19Opening of sal wood sleeper
20Supply of empty cement bag with filling of local sand for 3 times repair of naka and etc. Reqd. For proper completion of
21Supply of Nut bolt size 32x300mm. Dia including complete work as per direction of E/I.
22Supply of Nut bolt size 32x150mm. Dia including complete work as per direction of E/I.
23Supply of Mallahi kati including all materials complete as perdirection of E.I.
24Supply of JCB machine for construction of approach road and etc. Work reqd. For proper completion of the work.
25S/O Tractor with curu and trolly with driver and fuel for consgruction of approach road and etc. Work reqd. For proper completion of work as per direction of E/I.
26E.W. in cutting or in embankment in ordinary soil. Excavation to be done in the form of regular pits not exceeding 0.5M in depth and in embankment to be in 20cm. Layers including ramming dressing etc. complete required for proper comletion of the work. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58209909
AUTHORITY Government Departments
TENDER VALUE 11.80 Lakhs
LAST DATE 31-10-2026
Authority
Authority Name Public Works Department
Work Description Tender For The Installation And Removal Of The Pontoon Bridge At Hanuman Ghat On The Tamsa River Under Nagar Palika Parishad, Mau District.
Basic Detail
Tender No 2214/12A Dt. 13.10.2026
Bidding Type Tender
Location
City Mau
State Uttar Pradesh
Key Dates
Publish Date 24 Oct 2026
Submission Date 31 Oct 2026
Open Date 31 Oct 2026
Finance
Tender Value 11.80 Lakhs
Tender Fee 855
EMD 1.18 Lakhs
Exemption Not Available
Document List
BOQ_2269558.xls
dde83af5-c5b8-4cf8-802a-348a619eec6b.html
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Oct 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_2269558.xls

html

dde83af5-c5b8-4cf8-802a-348a619eec6b.html

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender