Tender For Shifting Including Diversion And Extension Of 10 Inch Dia Pipeline Of 4000 Gpm 02 Nos. And 01 No. 3000Gpm And 01 No.2000 Gpm Pump Motor Set And Multiple Times Shifting And And Multiple Times Re-Installation At Level Of Water At Abandoned S
Tender Overview
Project Description
Tender for Shifting Including Diversion And Extension Of 10 Inch Dia Pipeline Of 4000 Gpm 02 Nos. And 01 No. 3000Gpm And 01 No.2000 Gpm Pump Motor Set And Multiple Times Shifting And And Multiple Times Re-Installation At Level Of Water At Abandoned Sump Of North Tisra Quarry To Maintain Smooth Supply Of Domestic Water To Colony Way By 9 No.Siding Of Amal. Nt-St- Kujama Ocp Under Lodna Area.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of 09 nos pipes of 10 inch dia from Lavel position and transporting from vertical to bottom and from bottom to storing place in mines for loading on truck. |
| 2 | Dismantling of 25 nos pipes of 10 inch dia from verticle / incline position and transporting from vertical to bottom and from bottom to storing place in mines for loading on truck. |
| 3 | Dismantling of 8 nos pipes of 8 inch dia from verticle / incline position and transporting from vertical to bottom and from bottom to storing place in mines for loading on truck. |
| 4 | Dismentling of 4 nos bends, 4 tapper / short piece & 04 Nos. mail piece of 8 inch dia from incline / vertical position and manually lowering down from verticle position to bottom level for loading on truck. |
| 5 | Dismentling of 12 nos bends, 15 tapper / short piece & 06 Nos. mail piece of 10 inch dia from incline / vertical position and manually lowering down from verticle position to bottom level for loading on truck. |
| 6 | Dismentling of 9 nos bends , 9 short piece & 9 Nos. mail piece of 10 inch dia from LEVEL position and manually lowering down from verticle position to bottom level for loading on truck. |
| 7 | Manually carrying ,transporting AND Loading & unloading all above dismantle pipe 10” dia 34 Nos.kept at safe place. . |
| 8 | Dismentling of 6 nos Pipe of 8 inch dia from LEVEL position and transporting from verticle to bottom and from bottom to storing place in mines for loading on truck |
| 9 | Manually carrying ,transporting AND Loading & unloading all above dismantle pipe 8” dia 17 Nos.kept at safe place. |
| 10 | Carry laying & Joining of 10”dia 08 Nos. pipes incluiding surface leveling & supporting wherever required in level position |
| 11 | Carry laying & Joining of 8”dia 11 Nos. pipes incluiding surface leveling & supporting wherever required in level position Incline/Verticle position |
| 12 | Carry laying & Joining of 10”dia 32 Nos. pipes incluiding surface leveling & supporting wherever required in level position Incline/Verticle position |
| 13 | Joining 10”dia 06 nos bends ,10 short piece & 6 Nos. mail piece in level position |
| 14 | Joining 10”dia 17 nos bends, 27 tapper / short piece & 12 Nos. mail piece of 10 inch dia in incline/ vertical position |
| 15 | Joining 8”dia 04 nos bends, 04 tapper / short piece & 04 Nos. mail piece in Level position |
| 16 | Joining 8”dia 02 nos bends, 05 tapper / short piece in incline/ vertical position |
| 17 | installation of 4000 GPM pump, 2000/ 3000 GPM pump & Matching suction pipe with foot valve & fitting Delevery line with the pump , joining of sluice valve,NRV, Foot valve, both side matching short piece & all related job |
| 18 | Cost of Making 10\\"dia bend |
| 19 | Cost of Making 8\\"dia bend |
| 20 | Cost of Making 10\\"dia tapper /short piececs/meal piece |
| 21 | Cost of Making 8\\"dia tapper /short piececs/meal piece |
| 22 | Cost of Nut –Bolt ( ¾ x3”& 4”) |
| 23 | Cost of DA Gas |
| 24 | Cost of Oxygen Gas |
| 25 | Supply/cost of 8”dia flange |
| 26 | Supply/cost of 10”dia flange |
| 27 | Cost of Cutting of loints from convayor belt |
| 28 | Transporting cost oxygen, D.A &welding M/C |
| 29 | Supply of Cost of welding rod |
| 30 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender