Tender For A) Replacement Of 1200 Gpm Pump Installation Of 2000 Gpm Pump Motor Set On The Pontoon At Docp, Cv Area.(B) Shifting And Reinstallation Of 6000Gpm Surface Pump At Damagoria Colliery, Cv Area.(C) Installation Of 4000 Gpm Pump Type 10 Uph/8
Tender Overview
Project Description
Tender for A) Replacement Of 1200 Gpm Pump Installation Of 2000 Gpm Pump Motor Set On The Pontoon At Docp, Cv Area.(B) Shifting And Reinstallation Of 6000Gpm Surface Pump At Damagoria Colliery, Cv Area.(C) Installation Of 4000 Gpm Pump Type 10 Uph/8 Pump Sl. No. 1733625014 And H.T. Motor Make Marathon S.No. 3F/331484-0002/650Kw On Pontoon At Docp Under C.V. Area.
BOQ
| Sl. No. | Item Description |
| 1 | A) Replacement of 1200 GPM Pump installation of 2000 GPM Pump Motor set on the pontoon at DOCP, CV Area. |
| 2 | Labour charges for all bolt, nuts opening welded portion cutting by gas and dismantling of Pump motor set with bends, suction pipe, foot valve etc. with taking out from the pontoon to surface with help of crane. |
| 3 | Skilled - 2 men x 2 days |
| 4 | Semi-skilled - 2 men x 2 days |
| 5 | Labour charges for Old and scrap griders, MS Plate, angles etc. are collected from dumping yard of DOCP by gas cutting and lifting and carrying by manually for bed plate repairing and modification of old bed plate. |
| 6 | Skilled - 2 men x 4 days |
| 7 | Unskilled - 2 men x 4 days |
| 8 | Labour charges for 2 nos. bend and 2 nos. short piece making by 12\\" dia MS pipe cutting by gas and both side 12\\" dia MS flangge welding in side and outside double layer welding with 16\\" dia flange fitting and grand finishing short piece bend making as per required size. |
| 9 | Skilled - 2 men x 3 days |
| 10 | Unskilled - 2 men x 3 days |
| 11 | Labur charges for 1 no. curve type bend making by 12\\" dis MS pipe cutting by gas and both size flange welding in size & outside double layer welding with both side grind finishing as per required size |
| 12 | Skilled - 1 men x 2 days |
| 13 | Unskilled - 1 men x 2 days |
| 14 | Labour cost for manually loading and unloading of Bed Plate complete, pump motor set, bend, short piece, 8\\" MS Pipe 12 pcs., 10\\" MS pipe 4 pcs. etc. from E&Mi office to DOCP Quarry. |
| 15 | Skilled - 4 men x 2 days |
| 16 | Semiskilled - 4 men x 2 days |
| 17 | Unskilled - 2 men x 2 days |
| 18 | Labour charges for Lifting and installation of Pump and Motor on the bed plate by the help of crane and setting with line leveling and fitting by bolting and welding on pontoon |
| 19 | Skilled - 2 men x 1 shift |
| 20 | Semiskilled - 2 men x 1 shift |
| 21 | Unskilled - 4 men x 1 shift |
| 22 | Labour charges for Jointing and fittings with 8\\" dia MSPipe 8\\" bends fitting with delivery line and 10' length suction pipe with 12\\" foot valve in 15' deep water with pump and alignment of motor pump with bed plate. |
| 23 | Skilled - 2 men x 2 shift |
| 24 | Semiskilled - 2 men x 2 shift |
| 25 | Unskilled - 4 men x 2 shift |
| 26 | Crane hiring charges |
| 27 | Brass Valve 1/2\\"-1 No., Bend-3/4\\", cooling Pipe clamp etc. |
| 28 | Industrial Gas DA Cly.(6Mᵌ) |
| 29 | Industrial Oxygen Cly.(18Mᵌ) |
| 30 | Labour charges for handling and placing manually of 8%dia and 10\\" dia MS pipe approx 350' for flange welding |
| 31 | Skilled - 2 men x 1 shift |
| 32 | Semiskilled - 6 men x 1 shift |
| 33 | M.S. Flange 10\\" dia (Table-D) |
| 34 | M.S. Flange 8\\" dia (Table-D) |
| 35 | Cost of 10\\" MS flange setting and fiting with 10\\" dia & 8\\" dia MS pipe inside and outside welding double layer |
| 36 | MS Electrodes(160 NO/PKT) 4mm x 450m) |
| 37 | Manually laying and jointing 8\\" MS pipeline (approx.200 ft.) |
| 38 | MS Nut, Bolt & Washer (F.T.) (4\\"x5/8\\", 5\\"x5/8\\", 65\\"x5/8\\" |
| 39 | Cost Oof DA cylinder, Oxygen cylinder rental with transporting |
| 40 | B) SHIFTING AND REINSTALLATION OF 6000GPM SURFACE PUMP AT DAMAGORIA COLLIERY, CV AREA. |
| 41 | Labour charges for all bolts, nuts,opening welded portion cutting by gas and dismantling of pump ,motors,set with bends,suction pipe, foot valve etc taking out from water for re fitting (4 times ) |
| 42 | High Skilled |
| 43 | Skilled |
| 44 | Unskilled |
| 45 | Cost of 02no. Short piece and 01 no. Suction bend bend ,01 no. no. delivery bend making by 12\\" Dia MS Pipe cutting by Gas and both side flange welding double layer fitting and finishing (4 times as reqired) |
| 46 | Highly Skilled |
| 47 | Skilled |
| 48 | Unskilled |
| 49 | Cost of 8\\" Dia M.S. Flange setting with fittings(Total 4 shifting) and double layer welding(new pipe 15 nos. And rest old pipe) |
| 50 | Labour cost for loading,unloading of 35 nos. Of pipes from Surface to mines (Total 4 shifting) |
| 51 | Skilled |
| 52 | Unskilled |
| 53 | Supply and fitting of R.I. Cloth -6MM |
| 54 | Labour cost for shifting 8\\" Sluice valve -01 no. and 01 no. Non return valve near Pump |
| 55 | Supply of 8\\" MS Flange |
| 56 | Supply and Fitting of 8\\" MS Nut and Bolt 3/4\\" x4\\" |
| 57 | Supply M.S. Electrode for welding |
| 58 | Manually laying and Jointing 8\\" MS Pipes |
| 59 | Cost of DA Cylinder -6 Cum |
| 60 | Cost of Oxygen Cylinder - 14Cum |
| 61 | Transporting of Cylinder(To and fro) and rental Charges |
| 62 | Cost of Crane /JCB /Excavator loader type of Machine |
| 63 | C) Installation of 4000 GPM Pump Type 10 UPH/8 Pump Sl. No. 1733625014 and H.T. Motor make Marathon S.No. 3F/331484-0002/650KW on Pontoon at DOCP under C.V. Area. |
| 64 | Old and scrap griders, MS Plate, angles etc. are collected from dumping yard of DOCP by gas cutting and lifting and carrying by manually for bed plate repairing and modification of old bed plate. |
| 65 | Skilled - 2 men x 3 days |
| 66 | Semi-skilled - 2 men x 4 days |
| 67 | Cost of 2 nos. bend and 2 nos. short piece making by 10\\" dia MS pipe cutting by gas and both side 10\\" dia MS flange welding in side and outside double layer welding with 10\\" dia flange fitting and grand finishing short piece bend making as per required size. |
| 68 | Skilled - 2 men x 2 days |
| 69 | Semi-skilled - 2 men x 2 days |
| 70 | 2 no. curve type bend making by 10\\" dia MS pipe cutting by gas and both side flange welding in size & outside double layer welding with both side grind finishing as per required size. |
| 71 | Skilled - 1 men x 2 days |
| 72 | Semi-skilled - 1 men x 2 days |
| 73 | Labour cost for loading and unloading of Bed Plate complete, pump motor set, bend etc. E&M Office to DOCP Quarry by crane Skilled - 1 men x 1 day Semiskilled - 3 men x 1 dayUnskilled - 4 men x 1 day |
| 74 | Lifting and installation of Pump and Motor on the bed plate by the help of crane and setting with line leveling and fitting by bolting and welding on pontoon |
| 75 | Skilled - 1 men x 1 shift |
| 76 | Semiskilled - 2 men x 1 shift |
| 77 | Unskilled - 2 men x 1 shift |
| 78 | Jointing and fittings with 10\\" dia MS Pipe 10\\" bends fitting with delivery line and 20' length suction pipe with 10\\" foot valve in 15' deep water with pump and alignment of motor pump with bed plate. |
| 79 | Skilled - 2 men x 2 shift |
| 80 | Semiskilled - 2 men x 2 shift |
| 81 | Unskilled - 4 men x 2 shift |
| 82 | Crane hiring charges |
| 83 | 1 No. Foot Valve Repairing Charge |
| 84 | Industrial Gas DA Cly. |
| 85 | Industrial Oxygen Cly. |
| 86 | M.S. Flangge 10\\" dia (Table-D) |
| 87 | Cost of 10\\" MS flange setting and fiting with 10\\" dia MS pipe inside and outside welding double layer |
| 88 | MS Electrodes |
| 89 | MS Nut, Bolt & Washer (F.T.) (4\\"x5/8\\", 5\\"x5/8\\", 6\\"x5/8\\") |
| 90 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender