Tender For Construction Of Footpath In Sector-29 Gurugram. (From Fire Station To Westin Hotel). Providing And Laying Wmm, Cement Concrete Grade M-25 And Providing And Fixing Of Kerb And Channel With Painting Work And All Other Works Contingent Theret
Tender Overview
Project Description
Tender for Construction Of Footpath In Sector-29 Gurugram. (From Fire Station To Westin Hotel). Providing And Laying Wmm, Cement Concrete Grade M-25 And Providing And Fixing Of Kerb And Channel With Painting Work And All Other Works Contingent Thereto. (Including One Year maintenance /Defect Liability Period Free Of Cost) A/C Rs. 83.89 Lakh
BOQ
| Sl. No. | Item Description |
| 1 | [11.69.2]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 2. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre [Through Rate] |
| 2 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 3 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] |
| 4 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] |
| 5 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] |
| 6 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] |
| 7 | [6.39.1A]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1A. 1:1.5:3 (1 Cement : 1.5 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) up to 25% : 3 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) up to 25%). [Rate] Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender