Tender For Repair/Maintanance To Internal Electrification Including Complete Rewiring, Replacement Of Conventional Switches Into Modular In Certain Sailors Ma Accn C1 To C5 At Akash Ganga Area installation Rajali Arakkonam.
Tender Overview
Project Description
Tender for Repair/Maintanance To Internal Electrification Including Complete Rewiring, Replacement Of Conventional Switches Into Modular In Certain Sailors Ma Accn C1 To C5 At Akash Ganga Area installation Rajali Arakkonam.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Nov-2026 | TECHNICAL BID CORRIGENDUM 2 | Technical Bid | 14-Nov-2026 |
| 2 | 02-Nov-2026 | TECHNICAL BID CORRIGENDUM | Technical Bid | 14-Nov-2026 |
| 3 | 14-Nov-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 21-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Taking down copper/aluminium point wiring (light,fan, socket or power) complete, including fixtures and fittings such as switches, ceiling roses, pendents, regulators, sockets, light fittings etc. removing materials to store for keeping in safe custody or for taking credit and making good disturbed surfaces of wall, floors, etc.complete all as specified and as directed. |
| 2 | Material and labour point wiring with 1.5 Sqmm single core PVC insulated FRLS unsheathed multi stranded copper conductor wire drawn into existing concealed conduit including provision of 1.5 Sqmm single core PVC insulated FRLS unsheathed multi stranded copper conductor as earth wire and cast iron / pressed steel treminal boxes for mounting switches, sockets, fan regulator etc with 3 mm thick plastic laminated sheet cover complete for the following point wiring :- |
| 3 | One light/ fan/ exhaust fan/ buzzer point controlled by one switch. |
| 4 | One 3 pin socket outlet 6 Amps, Independent board with cables 1.5 Sqmm size. |
| 5 | One 3 pin socket outlet 6 Amps,same board with cables 1.5 Sqmm size. |
| 6 | One light point controlled by two 2- way switches, with cable 1.5 Sqmm size. |
| 7 | All as per item ser no-2 above here in before but one 3 pin socket outlet 6/16 Amps, indipendent board with cables 4.0 Sqmm size. Complete all as specified and directed. |
| 8 | Material and labour point wiring with 1.5 Sqmm single core PVC insulated FRLS unsheathed multi stranded copper conductor drawn into PVC Conduit and Casing & caping fixed on wall/roof/ceiling including wall cutting etc of size not less than 20 mm dia including provision of 1.5 Sqmm single core PVC insulated FRLS unsheathed multi stranded copper conductor as earth wire and cast iron / pressed steel treminal boxes for mounting switches, sockets, fan regulator etc with 3 mm thick plastic laminated sheet cover complete for the following :- |
| 9 | One light point controlled by one switch. |
| 10 | One 3 pin socket outlet 6 Amps, indipendent board with cables 1.5 Sqmm size. |
| 11 | All as per item ser no-4 above here in before but one 3 pin socket outlet 6/16 Amps, indipendent board with cables 4.0 Sqmm size. Complete all as specified and directed. |
| 12 | M&L for sub main wiring for phase and neutral with PVC FRLS insulated unsheathed multi stranded along with earth wire FRLS PVC insulted copper conductor, single core cable in and including surface/concealed /PVC conduit appropriate size including cutting chases on brick walls concrete if required/ necessary surfaces not exc 10cm girth and making good in cement mortar (1:3) the existing surface after carryiing out the concealed wiring including necessary finishesas specified for the following sizes. |
| 13 | 2x 1.5 sqmm and 1x ,.1.5 sqmm as earth wire |
| 14 | 2x 4.0 sqmm and 1x 4.0 sqmm as earth wire |
| 15 | 2x 10.0 sqmm and 1x 10.0 sqmm as earth wire |
| 16 | Taking down existing rusted switch board sunken box from site including removing fixtures and fittings such as switch, socket fan regulator complete, removing materials to store for keeping in safe custody or for taking credit and making good disturbed surfaces necessary plaster, white wash matches with existing colour of wall, floors, etc.complete all as specified and as directed. |
| 17 | Supply and fixing of GI metal flush box suitable for mounting moduler plate of following modules:- |
| 18 | 1 or 2 Module |
| 19 | 3 Module |
| 20 | 4 Module |
| 21 | 6 Module |
| 22 | 8 Module |
| 23 | Supply and fixing of combined both frame and cover plates fixing on mounting boxes for following modules:- |
| 24 | Cover plate with frame,2 Module |
| 25 | Cover plate with frame,3 Module |
| 26 | Cover plate with frame,4 Module |
| 27 | Cover plate with frame,6 Module |
| 28 | Cover plate with frame,8 Module |
| 29 | Supply and fixing in repair of modular switch one way 6A white Active one module complete all as specified and as directed. |
| 30 | Supply and fixing in repair of modular fan step regulator,120 W-2 module complete all as specified and as directed. |
| 31 | Supply and fixing in repair of modular socket 6A, 3 pin combined two module complete all as specified and as directed. |
| 32 | Supply and fixing in repair of modular switch 16A, 3 pin combined two module complete all as specified and as directed. |
| 33 | Supply and fixing in repair of modular socket 16A, 3 pin combined two module complete all as specified and as directed. |
| 34 | Supply and fixing in repair modular bell push 6A one module complete all as specified and as directed. |
| 35 | S&F Ceiling rose three terminals/ PVC/ polycarbonate, isolated body including taking down complete all as specified and as directed. |
| 36 | S&F in repair for Lamp holder angular/batten type, PVC/ polycarbonate type with back plate complete all as specified and as directed. |
| 37 | S&F in repair for decorative wall light fixture made up of Polycarbonate, suitable for 9w LED Lamp B22 Base with LED lamp of 9w complete all as specified and as directed. |
| 38 | Supply and fix Rechargable/ Inverter BEE Rated LED Lamps 12W.complete all as specified and directed. |
| 39 | Supply and fix Eco compact wall mounted LED batten for T8 LED tube with ULTRON high efficency LED polycarbonate tube with in built driver and metal heat sink 20/22 watt icluding taking down old unserviceable fittings all as specified and as directed. |
| 40 | Taking down ceiling fans of any make and sweep from ceiling hook/existing position and painting with two coats of synthetic enamel paint of approved tint including cleaning, scrapping and hanging/ fixing in etc all as specified and as directed. |
| 41 | S&F MCB,DB SPN 12 way in SS enclosure type. Note : MCB SPN/SP shall be measured and paid under the respective item of the schedule.complete all as specified and directed. |
| 42 | Supply , install & connect indoor type distribution board of 2mm thick CRCA sheet powder coated painting fabrication and concealed in wall with all incomming outgoing cable connections provisions neutral and earth links for distribution with suitable insulation materials for fixing, suitable wiring from existing DB covered and as well as comprising following switch gear items mounted on suitable fibre sheet for protectcting and fixing DB SPN 12 way and single phase meter with locking arrangement complete including taking down old metal box and making good disturbed surfaces necessary plaster, white wash matches with existing colour of wall, floors, etc and taken in to credit complete all as specified and as directed. Note : 1. Including demolisation of bricks/concrete, PCC for concealed DB box. 2. Rate quoted taking down old DB&Meter box. 3. Including removing meter and refixing it again. |
| 43 | Supply and fix for MCB SPN 230 V, 40-63 Amps with breaking capacity 10KA C curve complete all as specified and as directed.Note : Including taking down old unserviceable. |
| 44 | Supply and fix for MCB SP 230 V, 6-32 Amps with breaking capacity 10KA C curve complete all as specified and as directed.Note : Including taking down old unserviceable. |
| 45 | S& F for modular sheet metal enclosure double pole and neutral with a three pin and earth plug and socket complete with one SP MCB 25-32 Amps. Complete all as specified and directed. |
| 46 | S&F sheet metal enclosure vertical TPN MCCB DB 08 way double door with spreader terminals,insulating phase barrier and hardware with neccesary arrangements having incoimg capacity of 250A complete all as specified and directed Note :-(i) Including taking down old u/s DB, MCCB and MCB's (ii) MCCB and MCBs shall be measured and paid separately under the respective item of shedule. |
| 47 | Supply and fix for MCCB 4 Pole, 415 V, adjustable Thermal & Fixed Magnetic setting type type 200 Amps with breaking capacity 36 KA complete all as specified and as directed. Note : Including taking down old unserviceable. |
| 48 | Supply and fix Energy saving not less than 35 Watts LED light fitting ,IP66 powder coated pressure die cast aluminium high power street light with heatresisant toughened glass with lens by providing GI pipe medium grade 25 mm dia 1.5 Mtr in length with suitable size MS Clamp two nos made out of 25x3 mm FI incl two coat of synthetic enamel paint over a coat of red oxide primer, prewired and including connecting up with 3 core flexible copper conductor cable of 1.5 Sqmm from ceiling rose to fitting and including taking down old u/s damaged all as specified. Please Enable Macros to View BoQ information |
| 49 | Supply and fix Energy saving not less than 35 Watts LED light fitting ,IP66 powder coated pressure die cast aluminium high power street light with heatresisant toughened glass with lens by providing GI pipe medium grade 25 mm dia 1.5 Mtr in length with suitable size MS Clamp two nos made out of 25x3 mm FI incl two coat of synthetic enamel paint over a coat of red oxide primer, prewired and including connecting up with 3 core flexible copper conductor cable of 1.5 Sqmm from ceiling rose to fitting and including taking down old u/s damaged all as specified. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender