Tender For Comprehensive Maintenance Of Central Type Ac Plants, Package Ac Plants At Af Stn Tughlakabad
Tender Overview
Project Description
Tender for Comprehensive Maintenance Of Central Type Ac Plants, Package Ac Plants At Af Stn Tughlakabad
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Nov-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 21-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Material and Labour for checking the leakage in both low and high side of the system by feeding dry nitrogen to maintain adequate pressure in the system, plugging the leaks including Supply and Fix replacement of Teflon sealing of all refrigerant line valves like liquid lines valves/suction/ discharge valves of compressors, gland packages of all angle valves flaring of all connections framing welding etc complete for the following plants:- Note:1. Entire work is to be carried out by OEM i.e Bluestar for following plants. |
| 2 | AC plant of capacity 2 x 30 TR-Plant for ESCT. OEM-Bluestar |
| 3 | AC plant of Capacity 3x65 TR plant for PW-VI. OEM-Bluestar |
| 4 | AC plant of Capacity 3x37.5 TR plant for PW-IV(Block-25). OEM-Blue Star |
| 5 | AC plant package type of Cap 2x5.5TR-Plant for New signal centre.OEM-Bluestar |
| 6 | AC plant of Capacity 3 x 26 TR plant for Spyder. OEM-Bluestar |
| 7 | AC plant package type of Cap 1x7.5 TR-Plant for PW-III (MRL Lab). OEM-Voltas |
| 8 | AC plant package type of Cap 3x7.5 TR-Plant for PW-VI (MRM Lab). OEM-Voltas |
| 9 | Material and Labour for opening the upper sheet and side sheet of AHU’s,Condensor Unit of the following plants for access to cooling coil, including Material and Labour for washing/cleaning of cooling coil externally with mild acid (or caustic soda hot water solution) followed by water jet including cleaning/washing of air filters and descaling of cooling coil of AHU, re-fixing and changing of necessary fitting, T&P for mounting and all connections framing welding as specified and directed. Note :1. Entire work is to be carried out by OEM i.e Bluestar for following plants. |
| 10 | AC plant of capacity 2x30 TR-Plant for ESCT. Make-Bluestar |
| 11 | AC plant of Capacity 3x65 TR plant for PW-VI. OEM-Bluestar |
| 12 | AC plant of Capacity 3x37.5 TR plant for PW-IV(Block-25). OEM-Blue Star |
| 13 | AC plant of capacity 3x26 TR-Plant for spyder. Make-Bluestar |
| 14 | Material and Labour, including taking down for repair of AHU motor suitable for AC plants with following capacity by dismounting it from weather making unit of AHU, rewinding of 10/12.5HP motor same gauge with super enamelled copper wire including removing burnt winding cleaning of slotes sepration of rotor and startor making insulation to all joints and refixing the same at its original position all as specified and directed. |
| 15 | Material and Labour for repair of AHU motor suitable for AC plants with following capacity by dismounting it from weather making unit of AHU, rewinding of upto 7.5 HP motor same gauge with super enamelled copper wire including removing burnt winding cleaning of slotes sepration of rotor and startor making insulation to all joint all as specified and directed. |
| 16 | Supply and Fixing in replacement of following defective spare parts of AHU blower motor of any description/make and capacity 10/12.5 Hp and in any positioin :- |
| 17 | Replacement of ball bearing. |
| 18 | Replacement of cooling fan. |
| 19 | Replacement of capacitor of suitable mfd |
| 20 | Replacement of seal of motors. |
| 21 | Turning and polishing of motor shaft including lathe work |
| 22 | Repacement of Motor pulley with all accessories and as per sample |
| 23 | Supply & fixing in replacement of following defective spare parts of AHU Blower motor of any description/make and capacity upto 7.5 Hp and in any positioin :- |
| 24 | Replacement of ball bearing. |
| 25 | Replacement of cooling fan. |
| 26 | Replacement of capacitor of suitable mfd |
| 27 | Replacement of seal of motors. |
| 28 | Turning and polishing of motor shaft including lathe work |
| 29 | Repacement of Motor pulley with all accessories and as per sample |
| 30 | Material and Labour for fixing in replacement of gun metal gate valve butterfly type of 15 mm dia complete all as specified and directed. |
| 31 | Same as per Item No. 7.00 herein before but 20 mm dia |
| 32 | Same as per Item No. 7.00 herein before but 25 mm dia |
| 33 | Same as per Item No. 7.00 herein before but 50 mm dia |
| 34 | Same as per Item No. 7.00 herein before but 65 mm dia |
| 35 | Same as per Item No. 7.00 herein before but 80 mm dia |
| 36 | Material and Labour in replacement of Y type strainer CI body flanged ends with stainless stell strainer type as per existing of following sizes complete all as specified and as directed:- |
| 37 | 65 mm dia. |
| 38 | 80 mm dia. |
| 39 | Material and Labour for evacuation of gas from the system into the empty cylinder provided by department/pumping down to the system, descaling condenser unit of the following capacity plants after bypassing the cooling tower, pumps & supply and circulation of the descalling solution (ANTI SCALENE SCALE FOEE-100) with pump brushing the tubes and where required drilling the stubbon scalling without damaging the tube, replacement of deshed end gasket and unserviceable nuts and bolts assembling back complete testing and commissioning including removing air lock, recharging the gas taken out of the system complete all as specified and directed.Notes :- 1. Descaling pumps, nylon brush, acid including storage containers, drill and drill bits to be arranged by contractor and cost of the same deemed to be included in the rate quoted. 2. Entire work is to be carried out by OEM i.e Bluestar for following plants. |
| 40 | AC plant of capacity 2x30 TR-Plant for ESCT (OEM-Bluestar). No of compressors are 4 |
| 41 | AC plant of capacity 3x26 TR-Plant for spyder (OEM- Bluestar. No of compressors are 6 |
| 42 | AC plant of Capacity 3x 65 TR plant for PW-VI. OEM-Bluestar no of compressor are12 |
| 43 | AC plant of Capacity 3x37.5 TR plant for PW-IV (Block-25). OEM-Voltas No. of compressor are 9 |
| 44 | Material and Labour for Vacuum the system and after maintaining vacuum for 24 hours supply and charge refrigerant gas HCFC 22/32/407C/410 iin ac plant or package type of plant complete all as specified and directed. |
| 45 | Material and Labour in replacement for EWT/LWT sensor suitable for tripping for AC plant of spyder 3x26 TR, 2x36 TR ESCT, 3x67.5 TR PW-VI, 3x37.5 TR PW-III AC plant,as required and specified by OEM i.e Bluestar. Complete all as specified and as directed. |
| 46 | Material and Labour in replacement for digital temperature humidity display assembly as per existing sample for AC plant of spyder 2x26 TR, 2x30 TR ESCT, 3x67.5 TR PW-VI, 3x37.5 TR PW-III AC,3x7.5 TR PW- VI (MRM Lab), 2x5.5 TR New Signal and 1X 7.5 TR MRL Lab plant as required and specified complete all as specified and as directed. |
| 47 | Material and Labour in replacement for Thermometer gauge with thermowell complete with fittings etc as reqd capacity 0-50 degree celcius placed on pipe line as per existing for AC plant of spyder 2x26 TR, 2x30 TR ESCT, 3x7.5 TR PW-VI, 3x7.5 TR PW-III AC plant as required and specified. Complete all as specified and as directed. |
| 48 | Material and Labour in replacement pressure gauge complete with fittings ,cock valve ,syphon and pressure gauge etc Range 0-10.6 KG/cm2 (low/high) as per existing for AC plant of spyder 2x26 TR, 2x30 TR ESCT 3x7.5 TR PW-VI, 3x7.5 TR PW-III AC plant as required and specified complete all as specified and as directed. |
| 49 | Material and Labour for painting of AC Plant as per existing colour including Compressor, condenser, motor, chiller pump, AHU, cooling tower, Plant LT panel including base and all pipe lines & connected valve etc complete all as specified and directed for the following plants:- |
| 50 | AC plant of capacity 2x30 TR-Plant for ESCT |
| 51 | AC plant of capacity 3x26 TR-Plant for Syder |
| 52 | Material and Labour for thermal insulation for ducts with 13mm thick closed cell elastomeric nitrile rubber insulation with AL coating from one side for protrction of insulation complete all as specified and directed. |
| 53 | Supply and installation in replacement of aluminium powder coated grills / diffusers for supply air/return air and size 400x 400mm, square type with MS volume control dampers complete all as specified and directed. |
| 54 | Material and Labour in replacement of supply/return air ducting fabricated out of GI Sheet of thickness as under, complete all specified and directed as under:- |
| 55 | Made out of 22 Gauge |
| 56 | Supply and Fix in replacement of high pressure/Low pressure cutout as per sample complete all specified and directed |
| 57 | Supply and Fix in replacement of Oil pressure cutout as per sample complete all specified and directed. |
| 58 | Supply and Fix in replacement of Solonoid Valve for AC plant of Cap upto 66 TR complete all specified and directed. |
| 59 | Supply and Fix in replacement of Safety relief Valve for AC plant of Cap upto 66 TR complete all specified and directed. |
| 60 | Material and Labour in replacement of PCB contoller panel with display unit complete with necessary mounting, contactor, wiring kit, thimble, contact complete suitable for existing AC Plant cap upto 66.0 TR as per sample at site complete all as specified and as directed. Make :- Blue star or equivalent carrier/Voltas. |
| 61 | Material and Labour in replacement Duct filter with ss material filter media capacity shall capable 5 microns as per existing, suitable for AC plant of capacity upto 66 TR, package units as per site requirement. Complete all as specified and directed. |
| 62 | Material and Labour in replacement Strip heating element of cap 3KW (3000 W) 240 Volt Ac 50 Hz single phase complete all as specified and directed. |
| 63 | Material and Labour in replacement compressor Strip heaters of cap 1.5KW, 240 Volt Ac 50 Hz single phase complete all as specified and directed. |
| 64 | Taking out the U/S motor and rewinding of motor capacity 7.5 HP with same gauge with super enameled copper wire including removing burnt winding cleaning of slots separation of rotor and starter making insulation to all joint and replacement of the following items. All as specified and directed.(a) Replacement of ball bearing. Make: SKF-02 Nos (b) Replacement of bush (c) Replacement of cooling fan - 01 Nos. |
| 65 | All as per srl item no.27 above but motor capacity 5 HP |
| 66 | All as per srl item no. 27 above but motor capacity 3 HP |
| 67 | All as per srl item no. 27 above but motor capacity 2 HP |
| 68 | Taking out the U/S and opening of pump 7.5 HP centrifugal for repair and replacement of following u/s parts including re-fixing of all the same and testing and commissioning complete all as directed. |
| 69 | All as per srl item No 31 above but 05 HP |
| 70 | All as per srl item No 31 above but 02/03 HP |
| 71 | Supply and Fix in replacement of gun metal impeller upto 7.5 HP pump complete all as specified and directed. |
| 72 | Supply and Fix testing and commissioning in replacement of water pump self priming regenerative 5 HP three phase voltage range 380 V-415 V, frequency range 50 Htz as per site complete all as specified and directed. |
| 73 | Repairing and overhauling, commissioning and testing of AC compressor suitable for 26 TR at various location of AC plants, comprising of dismantling replacement of unserviceable components including, metaling grinding, polishing and reflux nuts, bolts, washers, assembling the compressor testing on load complete all as specified and directed. Note:-Spare parts/Component will be measured & paid seperately under respective items Model No SZ185S4RC of Danfoss or equivalent of Blue Star/Voltas |
| 74 | Supply only under mentioned spare parts for AC plants for maintenance of repair to compressor |
| 75 | Connecting rod |
| 76 | Cylinder liner |
| 77 | Piston |
| 78 | Piston ring |
| 79 | Gajan pin |
| 80 | Suction plates |
| 81 | Suction read and discharge read |
| 82 | Oil pump |
| 83 | Loder assembly |
| 84 | Gasket sets complete |
| 85 | Tyre coupling with lock |
| 86 | Oil filter |
| 87 | Spring section |
| 88 | Spring ducting |
| 89 | Oil seal |
| 90 | Main Bearing |
| 91 | Repairing and overhauling, commissioning and testing of AC compressor suitable for 65.0 TR at various location of AC plants, comprising of dismantling replacement of unserviceable components including, metaling grinding, polishing and reflux nuts, bolts, washers, assembling the compressor testing on load complete all as specified and directed. Note:-Spare parts/Component will be measured & paid seperately under respective items Model No DSH240A4ABB of Danfoss or equivalent of Blue Star/Voltas |
| 92 | Supply only under mentioned spare parts for AC plants for maintenance of repair to:-compressor |
| 93 | Connecting rod |
| 94 | Cylinder liner |
| 95 | Piston |
| 96 | Piston ring |
| 97 | Gajan pin |
| 98 | Suction plates |
| 99 | Suction read and discharge read |
| 100 | Oil pump |
| 101 | Loder assembly |
| 102 | Gasket sets complete |
| 103 | Tyre coupling with lock |
| 104 | Oil filter |
| 105 | Spring section |
| 106 | Spring ducting |
| 107 | Oil seal |
| 108 | Main Bearing |
| 109 | Repairing and overhauling, commissioning and testing of AC compressor suitable for 30 TR to 37.5 TR at various location of AC plants, comprising of dismantling replacement of unserviceable components including, metaling grinding, polishing and reflux nuts, bolts, washers, assembling the compressor testing on load complete all as specified and directed. Note:-Spare parts/Component will be measured & paid seperately under respective items Model No SZ185S4RC of Danfoss or equivalent of Blue Star/Voltas |
| 110 | Supply only under mentioned spare parts for AC plants for maintenance of repair to compressor |
| 111 | Connecting rod |
| 112 | Cylinder liner |
| 113 | Piston |
| 114 | Piston ring |
| 115 | Gajan pin |
| 116 | Suction plates |
| 117 | Suction read and discharge read |
| 118 | Oil pump |
| 119 | Loder assembly |
| 120 | Gasket sets complete |
| 121 | Tyre coupling with lock |
| 122 | Oil filter |
| 123 | Spring section |
| 124 | Spring ducting |
| 125 | Oil seal |
| 126 | Main Bearing |
| 127 | Supply and fix the following unserviceable accessories of complete central/package type AC plant of capacity upto 66 TR including connecting testing complete all as directed :- |
| 128 | AHU motor's fan blade as per sample |
| 129 | V Belt of AHU as per sample at site |
| 130 | canvas cloth for linkage as per existing |
| 131 | Phase sequence corrector |
| 132 | Expansion valve as per existing |
| 133 | Anti freeze thermosat |
| 134 | MS Nuts, bolts and washers of various sizes as required. |
| 135 | Compressor oil No-90 |
| 136 | Supply and laying of MS pipe , Class 'C' confirming to IS 1239/3589, heavy class, Nominal Dia 100 mm, chilled water piping including necessary fittings viz. bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators duly insulated with 50mm thick EPS pipe section having 16Kg density and final finished with 26 SWG Aluminium clading etc. Pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fastners) with necessary accessories complete all as specified and directed. |
| 137 | Ditto all as per item No 43 above but for size 80 mm dia complete all as specified and as directed. |
| 138 | Ditto all as per item No 43 above but for size 65 mm dia complete all as specified and as directed. |
| 139 | Supply and fixing 60 mm thick closed cell elastomeric nitrile insulation over MS pipe in trenches /walls/ceilings of size 50 to 100 mm with Aluminium cover of minimum thickness 1.5mm with proper screw to cover the pipe omplete all as specified and directed. Please Enable Macros to View BoQ information |
| 140 | Supply and fixing 60 mm thick closed cell elastomeric nitrile insulation over MS pipe in trenches /walls/ceilings of size 50 to 100 mm with Aluminium cover of minimum thickness 1.5mm with proper screw to cover the pipe omplete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender