Power Boards / Undertakings / PSU Closing in 4 days TDR #58186029

Tender For Civil Work For Establishment Of Gopalapuram 110/11 Kv Substation

Issued by Boards / Undertakings / PSU · Virudhunagar, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Nov 2026
4 days left
EMD
2.70 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Virudhunagar → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Civil Work For Establishment Of Gopalapuram 110/11 Kv Substation

BOQ

Name of Work:-
Sl. No. Item Description
1Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
2Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete.
3PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete.
4RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete.
5RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete.
6Refilling the excavated earth including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete.
7RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level
8Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete.
9RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete.
10Providing PCC 1:3:6 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC.
11RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For floor slab concrete 100mm Tk
12Brickwork in CM 1:5 mix using II class champer bricks of size 9\\"x 4 3/8\\"x2\\"3/4\\" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete.
13Brickwork in CM 1:3 mix using II class chamber brick of size 9\\"x 4 3/8\\" x 2 3/4\\" for bath, fol, brick on edge, partition wall, superstructure including cost of labour materials, curing, lead, lift, etc., complete.
14RCC 1:1 1/2:3 mix using 12 to 20mm HBS metal (machine crushed) for contineous lintel, tier slab and bed block, cover slab for staircase slab, water tank slab with formwork including cost of all materials, lead, lift, etc., complete.(by using mixer machine).
15RCC 1:1.5:3 mix using 12 to 20mm hbs metal (machine crushed) for Sun shade 60cm. Projection 80 mm thick at wall end and 50 mm thick at free end and loft, with form work including cost of all materials, labour, leas, lift, etc., complete. (by using mixer machine).
16RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for roof beam, with centering shuttering including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement
17RCC 1:1 1/2:3 using 12mm to 20 mm hbs metal (machine crushed) for roof slab concrete of 125 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
18RCC 1:1 1/2:3 using 12mm to 20 mm hbs metal (machine crushed) for roof slab concrete of 150 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
19Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
20Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, litf, etc, complete.
21Plastering with CM. 1:3 mix 12mm thick for ceiling, loft, bath, rcc pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
22Providing weathering course with one course of pressed tiles of size 25 x 25 x 2cm Embeded in CM 1:3 12mm thick & pointed with same mortor mixed with crude oil 10% weight of cement used over a bed of brick jelly, lime concrete of 80mm thick with ratio of 32:12.5 cft, (no sand) with the required slope and beaten with wooden beaters including cost of all materials, curing, labour lead lifts etc., complete.
23Providing projected border of 7.50cm width on top of parapet wall in CM 1:3 mix 12mm thick including cost of all material labour, lead, lift, curing etc., complete.
24Providing projected border of 20cm width on plinth beam side in CM 1:3 mix 12mm thick including cost of all material labour, lead, lift, curing etc., complete.
25Manufacturing and supplying of steel door using 50x50x6mm for outer frame 25x25x6mm for shutter frame with MS flat 25x6mm 3Nos and for panels with 12mm thick outside laminated MDF duratuff exterior quality with bolts, washers, hinges 12mm dia tower bolts of 200x38x2.4mm at top and 150x38x2.4mm at bottom and one no 250x16mm aldrop etc complete as per standard drawing and specn as well as per the direction of engineer at site. steel door size 0.90x2.00m.(single leaf)
26Supplying and fixing of PVC down fall pipe including cost of all materials, lead, lift, etc., complete.
27Providing two coats of white cement based wall putty over the plastered surface including removal of all loosly adhering materials from the wall surface with the help of emery stone,putty blade or wire brush and making the surface in just wet condition as per the specification and approved by the site engineer including cost of all materials, labour, transport,lead etc complete.
28Painting two coats with approved exterior/ interior emulsion paint over one coat of primer for outside wall including cost of all materials labour lead lift etc complete
29White washing two coats with best quality of white cement and robin blue pigment over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc.,including cost of all materials, lead, lift, etc., complete.
30Painting all exposed faces of door, windows and fencing post two coats an approved enamel paint over one coat of primary coat including cost of all materials, lead, lift, labour etc complete
31Flooring with approved Marbonite of size 600mmX 600mmx6mm over cement mortar 1:3,12mm thick including pointing with white cement finishing the joints, flush pointing the surface etc., complete.
32Flooring with approved acid proof tiles over cement mortor 1:3 12mm thick including pointing with white cement finishing the joints flush pointing the surface etc complete.
33Dadooing with glazed tiles of best quality of approved make johnson neycer
34Supplying and fixing of 110mm dia PVC pipe for Sewage pipe
35Supplying and fixing of 110mm dia PVC pipe for Raindown pipe
36Supplying and fixing of 100mm dia PVC bend
37Supplying and fixing 100mm dia PVC TEE
38Belgium mirror 300x450mm
39Wash basin 500x400mm
40Sanitary fittings (Western Type)
41PVC floor trap 100x50
42Inspection chamber 0.45x0.45x0.45
43Supplying and fixing of approved quality of aluminium towel rod
44Supplying and fixing of PVC shower and nickel control valve complete
45Supplying,laying and fixing in position of 32 mm PVC pipes
46Supplying,laying and fixing in position of 25 mm PVC pipes
47Supplying, fixing in position of 32mm dia gunmetal gate valve leader, zolots make of best quality
48Supplying, fixing in position of 25mm dia gunmetal gate valve leader, zolots make of best quality
49Supplying and fixing in position of 15mm dia brass screw down bib cock of best quality
50Supply and fixing 1No. 4 way S.P and natural distribution board with insulator and 1No. MCB of 6 amps each of standard company
51Wiring with PVC insulated copper cable for light & fan points
52Supply and fixing 15A plug
53Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor, with conduit pipe suspension from the ceiling with PVC unsheathed copper leads from terminals to the fittings with tube.
54Supply and fixing of 5A 3 pin and 2pin combined flush type wall socket with 5A flush type switch on suitable TW box
55Supply and fixing of 1200 mm (48\\") AC ceiling fan
56Supply and fixing of 20w LED bulk head fittings (Flood/street type)
57Supply and fixing of 32 Amps DP switch of 500 V with metal clad with fuse and neutral (side handle) on suitable TW board, with earth connection only
58Earthing as per P.W.D standard with an earth electrode of 2 mtr. Class 'B' GI pipe of dia not less than 32mm complete with necessary masonry work
59Supply and fixing of 375 mm (15\\") sweep (light duty) AC exhaust fan complete
60Supplying and fixing musical quartz type wall clock
61Engraving the month and year of construction
62Supply and fixing of angle 65x65x6 including all cost of materials. Lead, lift labour etc., complete.
63Supplying of steel table with on drawer and one cup-board of size 44\\"x24\\"x30\\" including cost of all labour, lead, lift etc complete
64Full arm steel 'S' type chair including cost of all labour, Lead, lift etc complete
65Steel rack of 4 shelves (open type) with 3 compartment of size 3'x1'x4' including cost of all labour, lead, lift etc complete
66Steel stool of size 1 1/4' x 1 1/4' including cost of all labour, lead, lift etc complete
67Steel half bench of size 3 1/4' x 1 1/4' x 1 1/2' including cost of all labour, lead, lift etc complete.
68Supplying and fixing of angle with 18Kg sheet proper welding for various size of name board with holding post height 2m above the GL of angle 65x65x6mm and painting and lettering the name of office over the two coat of painting as the direction of site engineer including all, brush, painting, labour, materials etc complete.
69Supply and fixing in position of UPVC partially glazed single leaf door
70Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows
71Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators with exhaust fan
72Drilling 150 mm dia bore well in all classes of soil, rock etc complete
73Supplying and fixing of 150 mm inner dia PVC casing pipe
74Supplying and erction of 3phase 3HP Submersible Pump, including cost materials, labour etc., complete.
75Supplying and fixing CPVC 40mm pipe
76Supplying and fixing 14mm nylon rope for bore well
77Supplying and fixing 4 core 6 sq.mm cable for bore wells
78Supplying and fixing 40mm adopter for bore well
79Supplying and fixing 150mm cap for bore well
80Supplying and fixing clamp for bore well
81Supplying and fixing 40mmx32mm reducer for bore well
82Supplying and fixing 40mm 'S' bend for bore well
83Supplying and fixing 20mm Nipple for bore well
84Supplying and fixing bore well accessories etc.,
85Supplying and fixing 3 Phase L&T starter with Panel Board including cost of materials, labour charges, etc., complete.
86RCC 1:1.5:3 mix 20mm thick for foundation raft concrete
87Plastering with CM. 1:3 mix 20mm thick for septic tank, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete.
88RCC 1:1 1/2:3 using 12mm to 20 mm hbs metal (machine crushed) for Septic tank roof slab concrete of 100 mm thick with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete. But excluding cost of steel reinforcement.
89Supply and providing 1000 litres capacity Priming Tank made up of PVC. Make: SINTEX / EQUIVALENT
90Labour charges for bore well geological for ground water including all labour, lead, lift etc, complete.
91Supplying and fixing of 100mm vent PVC pipe
92Supplying and fixing of 100mm PVC pipe
93Supplying and fixing of man hole cover with CI frames (60m x 60m ) of best quality including cost of materials lead lift etc complete.
94Fabrication, supplying and fixing of structural steel members for hand railing etc complete.
95Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth, earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m etc., complete.
96Supplying, filling and spreading of Msand foundation as per standard specification including cost of all materials lead lift etc complete
97PCC 1:3:6 mix using 20mm HBS metal for foundation without formwork, including cost of all materials, lead, lift, curing, etc complete
98RCC 1:1.5:3 using 20mm (machine crushed) metal without formwork for raft foundation including cost of all materials, lead, lift, labour etc., complete.
99RCC 1:1.5:3 using 20mm (machine crushed) metal with formwork for culvert wall including cost of all materials, lead, lift, labour etc., complete.
100PCC1:2:4 using 12 - 20mm with form work including cost of all materials, lead, lift, labour etc., complete.
101Brickwork in CM 1:5 using chamber Bricks including cost of all material, labour lead lift curing etc complete.
102Brickwork in CM 1:3 mix using chamber Brick of size including cost of all materials labour lead lift curing etc complete.
103Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete
104Painting two coats with approved exterior/ interior emulsion paint over one coat of white cement primer coat complete.
105Supplying and fabrication of GI/MS angle for fencing post and gates including cost of all materials lead ,lift etc. complete.
106Supplying and laying 50x50mm GI Chain link fencing with 10 gauge as per IS Standards for including cost of all materials, lead, lift etc. complete.
107RCC 1:1½:3 mix using 12 mm to 20 mm HBS metal (machine crushed) for gate pillars, culvert slab etc. with formwork including all cost of labour, materials, lead, lift, curing etc complete but excluding cost of steel reinforcement (By using mixer machine and vibrator)
108Plastering with CM 1:3 mix 12 mm thick for gate pillars including all cost labour materials lead lift labour curing etc., complete.
109Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc., complete.
110Transporting the excess excavated earth and refilling in low lying area including cost of all materials lead lift etc complete.
111Painting of steel members with two coats of enamel paint over one coat of primer including cost of all materials lead, lift etc complete
112Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
113Supplying, filling and spreading of M sand foundation as per standard specification including cost of all materials lead lift etc complete
114PCC 1:3:6 using 20mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete.
115PCC 1:2:4 using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, lead, lift, curing etc., complete.
116PCC 1:2:4 using 20mm HBS machine crushed metal for foundation with form work including cost of all labour, materials, lead, lift, curing etc., complete.
117RCC 1:1.5:3 using 20mm (machine crushed) metal for raft without form work including cost of all labour, materials, lead, lift etc., complete.
118RCC 1:1.5:3 using 20mm (machine crushed) metal for with formwork including cost of all labour, materials, lead, lift etc., complete.
119RCC 1:1.5:3 using 20mm (machine crushed) metal for precast slab for cable duct cover slab including cost of all materials, lead, lift, labour with formwork etc., complete.
120Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
121Supply and fixing of 90lbs rails over the transformer plinth including cutting the required length wrlding of MS flat at bottom of rails including MS bolts & aligning all lead, lift, labour etc., complete.
122Brickwork in CM 1:5 mix using II class champer bricks size 9\\"X4\\"3/8\\" X 2\\"3/4\\" for retainging wall including cost of materials, labour, lead, lift, curing etc., complete.
123Plastering CM 1:3 mix 12mm thick including cost of materials, labour, lead, lift watering, curring etc., complete.
124Supplying and filling with red gravel in the SS yard and stacking them to department gauge, labour for filling and compaction including cost of all materials, lead, lift etc., complete.
125Supplying and filling with Quarry dust including cost of all materials, lead, lift, labour etc., complete.
126Supplying and filling with 20mm metal including cost of all materials, lead, lift, labour etc., complete.
127Painting two coats with approved exterior/ interior emulsion paint over one coat of primer for outside wall including cost of all materials labour lead lift etc complete
128Supplying and fixing in position of GI angle 50 X 50 X 6mm of required length for fixing the cable duc, as per the dierection of site Engineer including cost of all materials, lead, lift and cutting the GI angle required length and labour for fixing etc., complete.
129Providing water supply arrangements to earthpits for 32 mm dia PVC pipe
130Providing water supply arrangements to earthpits for 25 mm dia PVC pipe
131Providing water supply arrangements to earthpits for PVC PLUG.
132Supply and fixing in position of 32mm dia Gun metal gate valve including cost of materials, labour, lead, lift etc., complete.
133Supply and fixing in position of 25mm dia Gun metal gate valve including cost of materials, labour, lead, lift etc., complete.
134Supplying and fixing earth trough of 60cms dia 40mm thick and 60cm height with top cover including cost of all materials, lead, lift, labour etc., complete.
135Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
136Collection,supply and spreading of red gravel for all including cost of materials, labour, lead, lift etc., complete.
137Providing Granular Sub - Base with close graded Materials including cost of all materials lead, lifts consolidation with power roller etc complete
138Providing WMM for wet mix 40mm metal with Quary dust and River sand for road base including cost of all materials lead, lifts water consolidation with power roller etc complete
139RCC 1:1.5:3 using 20mm (machine crushed) metal without including cost of all labour, materials, lead, lift etc., complete.
140Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
141Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20mm thick to full width and depth of 150mm thick plastering with CM 1:3, 12mm thick includng cost of cement, all materials, labour, curing, all lead, lift etc., complete. as per standard specification.
142Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
143Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete.
144PCC 1:3:6 mix using 20mm HBS metal for foundation without formwork, including cost of all materials, lead, lift, curing, etc complete
145RCC 1:1½:3 mix using 12 mm to 20 mm HBS metal (machine crushed) for Raft without formwork for foundation including cost of all materials, labour, lead, lift, curing etc. complete but excluding cost of steel reinforcement (By using mixer machine and vibrator)
146PCC 1:2:4 mix using 12-20mm HBS metal for drainage with formwork, including cost of all materials, lead, lift, curing, etc complete
147Brickwork in CM 1:3 using II class chamber Bricks of size 9\\"x4⅜\\"x2¾\\" including cost of all materials, labour, lead, lift, curing etc complete.
148RCC 1:1½:3 mix using 12 mm to 20 mm HBS metal (machine crushed) for cover slab with formwork including cost of all materials, labour, lead, lift, curing etc. but excluding cost of steel reinforcement (By using mixer machine and vibrator)
149Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
150Plastering with CM 1:3 mix 12 mm thick for sump and drainge wall including cost of all materials, labour, lead, lift, curing etc. complete
151Plastering with CM 1:3 mix 20 mm thick for sump flooring including cost of all materials, labour, lead, lift, curing etc. complete
152Painting two coats with approved exterior/ interior emulsion paint over one coat of primer for outside wall including cost of all materials labour lead lift etc complete
153Providing Granular Sub - Base with close graded Materials including cost of all materials lead, lifts consolidation with power roller etc complete
154Providing WMM for wet mix 40mm metal with Quarry dust and M sand
155Suppling and laying interlock concrete paver of approved make as per vendor list, at petrol pump driveways with M40 grade concrtere blocks with minimum thickness of 80mm and providing 100mm thick Stone dust cushion below the pavers as sub base, stone dust filling between the pavers and compacting the same as per specifications.
156SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
157CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
158Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \\"0\\" only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58186029
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 10-11-2026
Authority
Authority Name Tamil Nadu Transmission Corporation Limited
Work Description Tender for Civil Work For Establishment Of Gopalapuram 110/11 Kv Substation
Basic Detail
Tender No CE/TPSO/MDU/017/26-27
Bidding Type Tender
Location
City Virudhunagar
State Tamil Nadu
Key Dates
Publish Date 23 Oct 2026
Submission Date 10 Nov 2026
Open Date 11 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 2.70 Lakhs
Exemption Available
Document List
546069df-db49-4b42-aee5-cb8a9e8e6716.html
BOQ_861489.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Nov 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
html

546069df-db49-4b42-aee5-cb8a9e8e6716.html

xls

BOQ_861489.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender