Environment and Forests Statutory Bodies & Commissions/Committees Closing in 21 days TDR #58182722

Bids Are invited for Sitc Of 01 Twin-Cell Frp Cooling Tower Of 960 Usgpm - Part A: Cooling Tower And Support Steel: Supply, Installation, Testing And Commissioning Of One (1) Twin-Cell, Induced-Draft, Counter Flow Frp Cooling Tower From A Cti Std-201

Issued by Statutory Bodies & Commissions/Committees · Medchal Malkajgiri, Telangana
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Nov 2026
21 days left
EMD
84000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Medchal Malkajgiri → Telangana
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Sitc Of 01 Twin-Cell Frp Cooling Tower Of 960 Usgpm - Part A: Cooling Tower And Support Steel: Supply, Installation, Testing And Commissioning Of One (1) Twin-Cell, Induced-Draft, Counter Flow Frp Cooling Tower From A Cti Std-201 Certified Model Line, 960 Usgpm (218 M³/H), 35.0 °C To 30.0 °C At 27.2 °C Wet Bulb, Heat Rejection Not Less Than 10,90,080 Kcal/H, With Fans, Ie3 Vfd-Duty Motors, Drives And All Accessories, Oem-Supervised Erection And Commissioning And Mandatory Spares, As Per Clauses 4.5 And 5.5. (Buy-Back Value Quoted Separately In Annexure Vii-B, Not Deducted Here). , Structural Steel Grillage (Is 2062) For The Cooling Tower, Hot-Dip Galvanised (Is 4759), As Per The Oem Support Arrangement, Fixed To The Rcc Deck With Chemical Anchors, As Per Clause 4.6. Paid On The Calculated Weight Of The Approved Shop Drawings. , Part B: Piping And Valves (Lump Sum), Condenser Water Piping Package, Lump Sum, Complete As Per Drawing Incois/Engg/Ct/2026-04 Sheet 1, Clause 4.7 And Annexure Ix-B, Including Tie-Ins Ti-1 And Ti-2, Supports, Coating, Painting, Hydro Test, Flushing And Cleaning. , Valves And Pipe Specialties Package, Lump Sum, Complete As Per The Valve Schedule In Annexure Ix-A And Clause 4.8, Including Three Motorised Butterfly Valves (Two On The New Tower Cells And One On The Existing 217 Tr Tower Circuit) And Two Balancing Valves. , Ipart C: Instruments, Bimetal Dial Thermometer, 100 Mm, 0 To 60 °C, With Ss Thermowell (Tg-1 To Tg-4), As Per Clause 4.9. , Pressure Gauge, 100 Mm, With Gauge Cock And Snubber (Pg-1 To Pg-4), As Per Clause 4.9. , Pt100 Temperature Transmitter, 4 To 20 Ma, With Ss Thermowell And Shielded Cable To Cp-01 (Tt-1, Tt-2), As Per Clause 4.9. , Wet-Bulb Sensor Assembly (Temperature And Rh Transmitter In A Radiation Shield) With Shielded Cable To Cp-01 (Wbt-01), As Per Clause 4.9. , Make-Up Water Meter, 50 Mm, Class B, With Pulse Output Wired To Cp-01 (Wm-01), As Per Clause 4.9. , Part D: Shifting Of Existing Pumps, Shifting Of Two (2) Existing Condenser Pumps (Wilo Nl 125/315, 22 Kw) From The Ac Plant Room To The New Pump Room, With New Rcc Plinths, Anti-Vibration Pads, Shaft Setting, Reconnection, New Strainer Screens And Test Run, As Per Clause 4.10. , Part E: Electrical And Controls, Control Panel Cp-01 Complete As Per Drawing Incois/Engg/Ct/2026-04 Sheet 2 And Clause 4.11 (Fan Vfds With Dol Bypass, Pump Star-Delta Starters, Mov Feeders, Plc, Bms Interface, Field Stations), Including Modification Of The Outgoing Feeder In The Existing Lt Panel To A 125 A Tp Mccb. , 4C × 35 Sq Mm Copper Xlpe Armoured Cable (Is 7098 Part 1), Existing Lt Panel To Cp-01, Laid And Terminated As Per Clause 4.12. , As Item 12, But 3C × 10 Sq Mm, Cp-01 To The Pump Motors (Two Runs Per Pump, Star-Delta). , As Item 12, But 4C × 6 Sq Mm, Cp-01 To The Fan Motors. , 3C × 1.5 Sq Mm Copper Armoured Frls Control Cable (Is 1554 Part 1), Laid And Terminated As Per Clause 4.12. , As Item 15, But 8C × 1.5 Sq Mm. , Earthing Set: Two Earth Electrodes With Test Pits, Gi Strip And Bonding, With Two Separate Earth Connections For The Panel And For Each Motor, As Per Clause 4.12. , Part F: Dismantling And Miscellaneous, Dismantling Of The Three (3) Old 125 Tr Cooling Towers On The Substation Terrace, With Frames, Local Piping And Old Fan Feeders; Lowering By Crane, Capping, Making Good Of The Terrace And Removal From The C Us, After Acceptance Of The New Tower, As Per Clause 5.1. , Any Other Item Required For Satisfactory Completion Of The Work, Not Specifically Listed In Items 1 To 18 And 20, As Per Clause 3.4. Lump Sum. , Part G: Comprehensive Warranty, Comprehensive On-Site Warranty For 2 And 3 Years For The Complete Installation Under Items 1 To 18, With All Spares, Consumables And Labour And Two Preventive Maintenance Visits Per Year, As Per Clause 5.6 (Replacement Of Fill And Nozzles Due To Water Quality Excluded). The Price Breakup For Each Year Should Be Provided In Financial Document Along With Price Bid

BOQ

Sl. No. Item TitleItem Description
1PART A: COOLING TOWER AND SUPPORT STEEL: Supply, installation, testing and commissioning of one (1) twin-cell, induced-draft, counter flow FRP cooling tower from a CTI STD-201 certified model line, 960 USGPM (218 m³/h), 35.0 °C to 30.0 °C at 27.2 °C wet bulb, heat rejection not less than 10,90,080 kcal/h, with fans, IE3 VFD-duty motors, drives and all accessories, OEM-supervised erection and commissioning and mandatory spares, as per Clauses 4.5 and 5.5. (buy-back value quoted separately in Annexure VII-B, not deducted here).PART A: COOLING TOWER AND SUPPORT STEEL: Supply, installation, testing and commissioning of one (1) twin-cell, induced-draft, counter flow FRP cooling tower from a CTI STD-201 certified model line, 960 USGPM (218 m³/h), 35.0 °C to 30.0 °C at 27.2 °C wet bulb, heat rejection not less than 10,90,080 kcal/h, with fans, IE3 VFD-duty motors, drives and all accessories, OEM-supervised erection and commissioning and mandatory spares, as per Clauses 4.5 and 5.5. (buy-back value quoted separately in Annexure VII-B, not deducted here).
2Structural steel grillage (IS 2062) for the cooling tower, hot-dip galvanised (IS 4759), as per the OEM support arrangement, fixed to the RCC deck with chemical anchors, as per Clause 4.6. Paid on the calculated weight of the approved shop drawings.Structural steel grillage (IS 2062) for the cooling tower, hot-dip galvanised (IS 4759), as per the OEM support arrangement, fixed to the RCC deck with chemical anchors, as per Clause 4.6. Paid on the calculated weight of the approved shop drawings.
3PART B: PIPING AND VALVES (LUMP SUM), Condenser water piping package, lump sum, complete as per drawing INCOIS/ENGG/CT/2026-04 sheet 1, Clause 4.7 and Annexure IX-B, including tie-ins TI-1 and TI-2, supports, coating, painting, hydro test, flushing and cleaning.PART B: PIPING AND VALVES (LUMP SUM), Condenser water piping package, lump sum, complete as per drawing INCOIS/ENGG/CT/2026-04 sheet 1, Clause 4.7 and Annexure IX-B, including tie-ins TI-1 and TI-2, supports, coating, painting, hydro test, flushing and cleaning.
4Valves and pipe specialties package, lump sum, complete as per the valve schedule in Annexure IX-A and Clause 4.8, including three motorised butterfly valves (two on the new tower cells and one on the existing 217 TR tower circuit) and two balancing valves.Valves and pipe specialties package, lump sum, complete as per the valve schedule in Annexure IX-A and Clause 4.8, including three motorised butterfly valves (two on the new tower cells and one on the existing 217 TR tower circuit) and two balancing valves.
5IPART C: INSTRUMENTS, Bimetal dial thermometer, 100 mm, 0 to 60 °C, with SS thermowell (TG-1 to TG-4), as per Clause 4.9.IPART C: INSTRUMENTS, Bimetal dial thermometer, 100 mm, 0 to 60 °C, with SS thermowell (TG-1 to TG-4), as per Clause 4.9.
6Pressure gauge, 100 mm, with gauge cock and snubber (PG-1 to PG-4), as per Clause 4.9.Pressure gauge, 100 mm, with gauge cock and snubber (PG-1 to PG-4), as per Clause 4.9.
7PT100 temperature transmitter, 4 to 20 mA, with SS thermowell and shielded cable to CP-01 (TT-1, TT-2), as per Clause 4.9.PT100 temperature transmitter, 4 to 20 mA, with SS thermowell and shielded cable to CP-01 (TT-1, TT-2), as per Clause 4.9.
8Wet-bulb sensor assembly (temperature and RH transmitter in a radiation shield) with shielded cable to CP-01 (WBT-01), as per Clause 4.9.Wet-bulb sensor assembly (temperature and RH transmitter in a radiation shield) with shielded cable to CP-01 (WBT-01), as per Clause 4.9.
9Make-up water meter, 50 mm, Class B, with pulse output wired to CP-01 (WM-01), as per Clause 4.9.Make-up water meter, 50 mm, Class B, with pulse output wired to CP-01 (WM-01), as per Clause 4.9.
10PART D: SHIFTING OF EXISTING PUMPS, Shifting of two (2) existing condenser pumps (Wilo NL 125/315, 22 kW) from the AC plant room to the new pump room, with new RCC plinths, anti-vibration pads, shaft setting, reconnection, new strainer screens and test run, as per Clause 4.10.PART D: SHIFTING OF EXISTING PUMPS, Shifting of two (2) existing condenser pumps (Wilo NL 125/315, 22 kW) from the AC plant room to the new pump room, with new RCC plinths, anti-vibration pads, shaft setting, reconnection, new strainer screens and test run, as per Clause 4.10.
11PART E: ELECTRICAL AND CONTROLS, Control panel CP-01 complete as per drawing INCOIS/ENGG/CT/2026-04 sheet 2 and Clause 4.11 (fan VFDs with DOL bypass, pump star-delta starters, MOV feeders, PLC, BMS interface, field stations), including modification of the outgoing feeder in the existing LT panel to a 125 A TP MCCB.PART E: ELECTRICAL AND CONTROLS, Control panel CP-01 complete as per drawing INCOIS/ENGG/CT/2026-04 sheet 2 and Clause 4.11 (fan VFDs with DOL bypass, pump star-delta starters, MOV feeders, PLC, BMS interface, field stations), including modification of the outgoing feeder in the existing LT panel to a 125 A TP MCCB.
124C × 35 sq mm copper XLPE armoured cable (IS 7098 Part 1), existing LT panel to CP-01, laid and terminated as per Clause 4.12.4C × 35 sq mm copper XLPE armoured cable (IS 7098 Part 1), existing LT panel to CP-01, laid and terminated as per Clause 4.12.
13As item 12, but 3C × 10 sq mm, CP-01 to the pump motors (two runs per pump, star-delta).As item 12, but 3C × 10 sq mm, CP-01 to the pump motors (two runs per pump, star-delta).
14As item 12, but 4C × 6 sq mm, CP-01 to the fan motors.As item 12, but 4C × 6 sq mm, CP-01 to the fan motors.
153C × 1.5 sq mm copper armoured FRLS control cable (IS 1554 Part 1), laid and terminated as per Clause 4.12.3C × 1.5 sq mm copper armoured FRLS control cable (IS 1554 Part 1), laid and terminated as per Clause 4.12.
16As item 15, but 8C × 1.5 sq mm.As item 15, but 8C × 1.5 sq mm.
17Earthing set: two earth electrodes with test pits, GI strip and bonding, with two separate earth connections for the panel and for each motor, as per Clause 4.12.Earthing set: two earth electrodes with test pits, GI strip and bonding, with two separate earth connections for the panel and for each motor, as per Clause 4.12.
18PART F: DISMANTLING AND MISCELLANEOUS, Dismantling of the three (3) old 125 TR cooling towers on the Substation terrace, with frames, local piping and old fan feeders; lowering by crane, capping, making good of the terrace and removal from the campus, after acceptance of the new tower, as per Clause 5.1.PART F: DISMANTLING AND MISCELLANEOUS, Dismantling of the three (3) old 125 TR cooling towers on the Substation terrace, with frames, local piping and old fan feeders; lowering by crane, capping, making good of the terrace and removal from the campus, after acceptance of the new tower, as per Clause 5.1.
19Any other item required for satisfactory completion of the work, not specifically listed in items 1 to 18 and 20, as per Clause 3.4. Lump sum.Any other item required for satisfactory completion of the work, not specifically listed in items 1 to 18 and 20, as per Clause 3.4. Lump sum.
20PART G: COMPREHENSIVE WARRANTY, Comprehensive on-site warranty for 2 and 3 Years for the complete installation under items 1 to 18, with all spares, consumables and labour and two preventive maintenance visits per year, as per Clause 5.6 (replacement of fill and nozzles due to water quality excluded). The Price Breakup for each year should be provided in Financial Document along with price bidPART G: COMPREHENSIVE WARRANTY, Comprehensive on-site warranty for 2 and 3 Years for the complete installation under items 1 to 18, with all spares, consumables and labour and two preventive maintenance visits per year, as per Clause 5.6 (replacement of fill and nozzles due to water quality excluded). The Price Breakup for each year should be provided in Financial Document along with price bid

AI Tender Summary

OUR REF NO 58182722
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE Ref. Documents
LAST DATE 16-11-2026
Authority
Authority Name Department Of Earth Sciences
Work Description Bids Are invited for Sitc Of 01 Twin-Cell Frp Cooling Tower Of 960 Usgpm - Part A: Cooling Tower And Support Steel: Supply, Installation, Testing And Commissioning Of One (1) Twin-Cell, Induced-Draft, Counter Flow Frp Cooling Tower From A Cti Std-201 Certified Model Line, 960 Usgpm (218 M³/H), 35.0 °C To 30.0 °C At 27.2 °C Wet Bulb, Heat Rejection Not Less Than 10,90,080 Kcal/H, With Fans, Ie3 Vfd-Duty Motors, Drives And All Accessories, Oem-Supervised Erection And Commissioning And Mandatory Spares, As Per Clauses 4.5 And 5.5. (Buy-Back Value Quoted Separately In Annexure Vii-B, Not Deducted Here). , Structural Steel Grillage (Is 2062) For The Cooling Tower, Hot-Dip Galvanised (Is 4759), As Per The Oem Support Arrangement, Fixed To The Rcc Deck With Chemical Anchors, As Per Clause 4.6. Paid On The Calculated Weight Of The Approved Shop Drawings. , Part B: Piping And Valves (Lump Sum), Condenser Water Piping Package, Lump Sum, Complete As Per Drawing Incois/Engg/Ct/2026-04 Sheet 1, Clause 4.7 And Annexure Ix-B, Including Tie-Ins Ti-1 And Ti-2, Supports, Coating, Painting, Hydro Test, Flushing And Cleaning. , Valves And Pipe Specialties Package, Lump Sum, Complete As Per The Valve Schedule In Annexure Ix-A And Clause 4.8, Including Three Motorised Butterfly Valves (Two On The New Tower Cells And One On The Existing 217 Tr Tower Circuit) And Two Balancing Valves. , Ipart C: Instruments, Bimetal Dial Thermometer, 100 Mm, 0 To 60 °C, With Ss Thermowell (Tg-1 To Tg-4), As Per Clause 4.9. , Pressure Gauge, 100 Mm, With Gauge Cock And Snubber (Pg-1 To Pg-4), As Per Clause 4.9. , Pt100 Temperature Transmitter, 4 To 20 Ma, With Ss Thermowell And Shielded Cable To Cp-01 (Tt-1, Tt-2), As Per Clause 4.9. , Wet-Bulb Sensor Assembly (Temperature And Rh Transmitter In A Radiation Shield) With Shielded Cable To Cp-01 (Wbt-01), As Per Clause 4.9. , Make-Up Water Meter, 50 Mm, Class B, With Pulse Output Wired To Cp-01 (Wm-01), As Per Clause 4.9. , Part D: Shifting Of Existing Pumps, Shifting Of Two (2) Existing Condenser Pumps (Wilo Nl 125/315, 22 Kw) From The Ac Plant Room To The New Pump Room, With New Rcc Plinths, Anti-Vibration Pads, Shaft Setting, Reconnection, New Strainer Screens And Test Run, As Per Clause 4.10. , Part E: Electrical And Controls, Control Panel Cp-01 Complete As Per Drawing Incois/Engg/Ct/2026-04 Sheet 2 And Clause 4.11 (Fan Vfds With Dol Bypass, Pump Star-Delta Starters, Mov Feeders, Plc, Bms Interface, Field Stations), Including Modification Of The Outgoing Feeder In The Existing Lt Panel To A 125 A Tp Mccb. , 4C × 35 Sq Mm Copper Xlpe Armoured Cable (Is 7098 Part 1), Existing Lt Panel To Cp-01, Laid And Terminated As Per Clause 4.12. , As Item 12, But 3C × 10 Sq Mm, Cp-01 To The Pump Motors (Two Runs Per Pump, Star-Delta). , As Item 12, But 4C × 6 Sq Mm, Cp-01 To The Fan Motors. , 3C × 1.5 Sq Mm Copper Armoured Frls Control Cable (Is 1554 Part 1), Laid And Terminated As Per Clause 4.12. , As Item 15, But 8C × 1.5 Sq Mm. , Earthing Set: Two Earth Electrodes With Test Pits, Gi Strip And Bonding, With Two Separate Earth Connections For The Panel And For Each Motor, As Per Clause 4.12. , Part F: Dismantling And Miscellaneous, Dismantling Of The Three (3) Old 125 Tr Cooling Towers On The Substation Terrace, With Frames, Local Piping And Old Fan Feeders; Lowering By Crane, Capping, Making Good Of The Terrace And Removal From The C Us, After Acceptance Of The New Tower, As Per Clause 5.1. , Any Other Item Required For Satisfactory Completion Of The Work, Not Specifically Listed In Items 1 To 18 And 20, As Per Clause 3.4. Lump Sum. , Part G: Comprehensive Warranty, Comprehensive On-Site Warranty For 2 And 3 Years For The Complete Installation Under Items 1 To 18, With All Spares, Consumables And Labour And Two Preventive Maintenance Visits Per Year, As Per Clause 5.6 (Replacement Of Fill And Nozzles Due To Water Quality Excluded). The Price Breakup For Each Year Should Be Provided In Financial Document Along With Price Bid
Basic Detail
Tender No GEM/2026/B/8195248
Bidding Type Tender
Location
City Medchal Malkajgiri
State Telangana
Key Dates
Publish Date 23 Oct 2026
Submission Date 16 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 84000
Exemption Available
Document List
093b9af5-7c7a-4333-b09a-143d1686e35a.pdf
1792759148.xlsx
tendocv1_2026-10-23-17-49-11_6f01d52206997d6c4a2e8912310a9fab.pdf
1792759307.pdf
tendoc_e495b4ae-a440-42c5-b7db1792759818991_SKINCOIS.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 21 days
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
pdf

093b9af5-7c7a-4333-b09a-143d1686e35a.pdf

xlsx

1792759148.xlsx

pdf

tendocv1_2026-10-23-17-49-11_6f01d52206997d6c4a2e8912310a9fab.pdf

pdf

1792759307.pdf

pdf

tendoc_e495b4ae-a440-42c5-b7db1792759818991_SKINCOIS.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender