Housing Urban and Rular Development Government Departments Closing in 3 days TDR #58175001

Tender For Widening And Strengthening Of Chandauki Shahgarh Jungle Tikri Odr Chainage 4.000 To 12.290 In Amethi District Including 5-Year Maintenance

Issued by Government Departments · Sultanpur, Uttar Pradesh
Tender Value
15.75 Crore
Estimated cost
Bid Submission
31 Oct 2026
3 days left
EMD
31.50 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sultanpur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Widening And Strengthening Of Chandauki Shahgarh Jungle Tikri Odr Chainage 4.000 To 12.290 In Amethi District Including 5-Year Maintenance

BOQ

Name of Work:- Widening and strengthening of Chandauki Shahgarh Jungle Tikri ODR Chainage 4.000 to 12.290 in Amethi district including 5-year maintenance
Sl. No. Item Description
1Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
2Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.
3Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
4Construction of granular sub-base by providing coarse graded material, from approved query spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per Clause 401.
5Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
6Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam after mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver as cemented base on sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the unconfined compressive strength as specified by Engr-in-charge
7Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
8Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
9Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
10Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. in patri
11Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. For Drain
12Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. For Drain
13Providing plain/ Reinforced Cement Concrete in U-Tpye Drain as per Drawing and Technical Specifications For Drain
14Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 For Drain
15Dimolishing Brick Work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. Construction of RCC 2x2 mtr span Culvert
16Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled material as directed by the Engineer-in-Charge within a distance of 60 metres (200 ft.) Construction of RCC 2x2 mtr span Culvert
17Construction of Diversion Providing and laying rienforced cement concrete pipe 1000 dia NP3 for culvert on first class bedding in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. Construction of RCC 2x2 mtr span Culvert
18Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Construction of RCC 2x2 mtr span Culvert
19Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Construction of RCC 2x2 mtr span Culvert
20Brick on edge pavement with bricks laid dry joints filled with local sand including preperation base of proper slope and its ramming spreading blinding layer of 1 cm depth of local sand over sub-base including T&P etc rwquired for proper completion of work..Construction of RCC 2x2 mtr span Culvert
21Construction of Box Cell Culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Construction of RCC 2x2 mtr span Culvert
22Sand Filling in Foundation Trenches as per Drawing & Technical Specification. Construction of RCC 2x2 mtr span Culvert
23Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
24Reinforced Cement Concrete Grade M30 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
25Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
26Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications.Construction of RCC 2x2 mtr span Culvert
27Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications.Construction of RCC 2x2 mtr span Culvert
28Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AV pipe, extending through the full width of 1V:20H towards drawing face. Complete as per drawing and technical specification.Construction of RCC 2x2 mtr span Culvert
29Drainage Spouts complete as per drawing and Technical specification. Construction of RCC 2x2 mtr span Culvert
30Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.Construction of RCC 2x2 mtr span Culvert
31Protection Work Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Construction of RCC 2x2 mtr span Culvert
32Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
33Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
34Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications. Construction of RCC 2x2 mtr span Culvert
35Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AV pipe, extending through the full width of 1V:20H towards drawing face. Complete as per drawing and technical specification.Construction of RCC 2x2 mtr span Culvert
36Providing and laying of Filter media with granular material/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.Construction of RCC 2x2 mtr span Culvert
37Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical Specification.Construction of RCC 2x2 mtr span Culvert
38Providing and laying Flooring complete as per drawing and Technical Specification laid over Cement Concrete Bedding.Construction of RCC 2x2 mtr span Culvert
39Dimolishing Brick Work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. Construction of RCC 1x3 mtr span Culvert
40Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled material as directed by the Engineer-in-Charge within a distance of 60 metres (200 ft.) Construction of RCC 1x3 mtr span Culvert
41Construction of Diversion Providing and laying rienforced cement concrete pipe 1000 dia NP3 for culvert on first class bedding in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. Construction of RCC 1x3 mtr span Culvert
42Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Construction of RCC 1x3 mtr span Culvert
43Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Construction of RCC 1x3 mtr span Culvert
44Construction of Box Cell Culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Construction of RCC 1x3 mtr span Culvert
45Sand Filling in Foundation Trenches as per Drawing & Technical Specification. Construction of RCC 1x3 mtr span Culvert
46Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
47Reinforced Cement Concrete Grade M30 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
48Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
49Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications.Construction of RCC 1x3 mtr span Culvert
50Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications.Construction of RCC 1x3 mtr span Culvert
51Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AV pipe, extending through the full width of 1V:20H towards drawing face. Complete as per drawing and technical specification.Construction of RCC 1x3 mtr span Culvert
52Drainage Spouts complete as per drawing and Technical specification. Construction of RCC 1x3 mtr span Culvert
53Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.Construction of RCC 1x3 mtr span Culvert
54Protection Work Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Construction of RCC 1x3 mtr span Culvert
55Plain Cement Concrete Grade M15 in Open Fondation complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
56Reinforced Cement Concrete Grade M30 for wall & slab etc. complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
57Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications. Construction of RCC 1x3 mtr span Culvert
58Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AV pipe, extending through the full width of 1V:20H towards drawing face. Complete as per drawing and technical specification.Construction of RCC 1x3 mtr span Culvert
59Providing and laying of Filter media with granular material/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.Construction of RCC 1x3 mtr span Culvert
60Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical Specification.Construction of RCC 1x3 mtr span Culvert
61Providing and laying Flooring complete as per drawing and Technical Specification laid over Cement Concrete Bedding.Construction of RCC 1x3 mtr span Culvert
62Excavation in foundation in ordinary soil. Construction of single Row 1000 dia
63Plain/Reinforced Cement Concrete in Open Fondation complete as per Drawing and Technical Specifications.PCC Grade M15 Construction of single Row 1000 dia
64Brick masonry work M-150 in 1:4 cement and fine sand of 1.25 FM in foundation and plinth inc all complete Construction of single Row 1000 dia
65Supply of 1000 mm dia NP3 Hume pipe including cartage complete.Construction of single Row 1000 dia
66Laying of 1000 mm dia NP3 Hume pipe in proper position complete Construction of single Row 1000 dia
67Pointing with cement mortar (1:3) Construction of single Row 1000 dia
68S/F KM Stone,Hecto-stone, etc complete work
69The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
70The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
71The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
72The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
73The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% of tenderd cost of Construction as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58175001
AUTHORITY Government Departments
TENDER VALUE 15.75 Crore
LAST DATE 31-10-2026
Authority
Authority Name Public Works Department
Work Description Tender for Widening And Strengthening Of Chandauki Shahgarh Jungle Tikri Odr Chainage 4.000 To 12.290 In Amethi District Including 5-Year Maintenance
Basic Detail
Tender No 3748/ 1com. su.a cir / 2026-27 Dt 13.10.2026
Bidding Type Tender
Location
City Sultanpur
State Uttar Pradesh
Key Dates
Publish Date 23 Oct 2026
Submission Date 31 Oct 2026
Open Date 31 Oct 2026
Finance
Tender Value 15.75 Crore
Tender Fee 2714
EMD 31.50 Lakhs
Exemption Available
Document List
038d578d-974a-4a92-ba9e-39fa0900e2de.html
BOQ_2270039.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf
Tendernotice_4.pdf
Tendernotice_5.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Oct 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

038d578d-974a-4a92-ba9e-39fa0900e2de.html

xls

BOQ_2270039.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

pdf

Tendernotice_4.pdf

pdf

Tendernotice_5.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender