Home Affairs Statutory Bodies & Commissions/Committees Closing in 17 days TDR #58173398

Tender For Construction Of 08 Number Log Bridges At Lanchom-03Nos, Khoiliang-03 Nos, Chiranglat-02 Nos Under 25Th Bn Itbp

Issued by Statutory Bodies & Commissions/Committees · Papum Pare, Arunachal Pradesh
Tender Value
62.77 Lakhs
Estimated cost
Bid Submission
13 Nov 2026
17 days left
EMD
1.25 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Papum Pare → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of 08 Number Log Bridges At Lanchom-03Nos, Khoiliang-03 Nos, Chiranglat-02 Nos Under 25Th Bn Itbp

BOQ

Name of Work:- Construction of 08 number Log Bridges at Lanchom-03Nos, Khoiliang-03 Nos, Chiranglat-02 Nos under 25th Bn ITBP
Sl. No. Item Description
1Construction of Log bridge at Lanchom (Near Khala) of 25th Bn I.T.B.P (A.P). (GR-033766 / HT:2059 Mtr)
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil
3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size)
5Centering and shuttering including strutting. propping etc. and removal of form work for: Foundations, footings, bases for columns
640 mm wooden planking,tougued and grooved in flooring, including fixing with iron srews complete with:Second class teak wood
7Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position : Local wood Tita/Champa/Pine/Tiger
8Providing & supplying of U / L clips with washer, nut and bolts complete for fixing of wooden column. (Non scheduled item). Double U-clip set of 5mm thickness, length 22\\" and width 2\\" inner column fixing 4\\", along with nuts/bolts of dia 1\\"/1.5\\" and length 5\\"-6''
9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars
10Construction of Log bridge at Khoiliang area of 25th Bn I.T.B.P (A.P). (GR-016762 / HT:1774 Mtr)
11Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil
12Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
13Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size)
14Centering and shuttering including strutting. propping etc. and removal of form work for: Foundations, footings, bases for columns
1540 mm wooden planking,tougued and grooved in flooring, including fixing with iron srews complete with:Second class teak wood
16Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position : Local wood Tita/Champa/Pine/Tiger
17Providing & supplying of U / L clips with washer, nut and bolts complete for fixing of wooden column. (Non scheduled item). Double U-clip set of 5mm thickness, length 22\\" and width 2\\" inner column fixing 4\\", along with nuts/bolts of dia 1\\"/1.5\\" and length 5\\"-6''
18Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars
19Name of work: Construction of Log bridge at Chiranghlat area of 25th Bn I.T.B.P (A.P). (GR-992743 / HT:1399 Mtr)
20Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil
21Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
22Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size)
23Centering and shuttering including strutting. propping etc. and removal of form work for: Foundations, footings, bases for columns
2440 mm wooden planking,tougued and grooved in flooring, including fixing with iron srews complete with:Second class teak wood
25Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position : Local wood Tita/Champa/Pine/Tiger
26Providing & supplying of U / L clips with washer, nut and bolts complete for fixing of wooden column. (Non scheduled item). Double U-clip set of 5mm thickness, length 22\\" and width 2\\" inner column fixing 4\\", along with nuts/bolts of dia 1\\"/1.5\\" and length 5\\"-6''
27Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58173398
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 62.77 Lakhs
LAST DATE 13-11-2026
Authority
Authority Name Indo Tibetan Border Police Force
Work Description Tender for Construction Of 08 Number Log Bridges At Lanchom-03Nos, Khoiliang-03 Nos, Chiranglat-02 Nos Under 25Th Bn Itbp
Basic Detail
Tender No 25BNrr-295/2026-I/127014/2026
Bidding Type Tender
Location
City Papum Pare
State Arunachal Pradesh
Key Dates
Publish Date 23 Oct 2026
Submission Date 13 Nov 2026
Open Date 16 Nov 2026
Finance
Tender Value 62.77 Lakhs
Tender Fee Ref. Documents
EMD 1.25 Lakhs
Exemption Not Available
Document List
0b79d076-fa94-47fb-8693-645e3c574b6b.html
BOQ_978859.xls
TenderDoc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Nov 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
html

0b79d076-fa94-47fb-8693-645e3c574b6b.html

xls

BOQ_978859.xls

pdf

TenderDoc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender