Tender For Instllation & Energisation Of Chungimati-Vi Community L.I.P Under Rajgangpur Block
Tender Value
34.69 Lakhs
Estimated cost
Bid Submission
30 Oct 2026
3 days left
EMD
34693
Bank guarantee accepted
Document Fee
7080
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sundargarh → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Instllation & Energisation Of Chungimati-Vi Community L.I.P Under Rajgangpur Block
BOQ
| Sl. No. | Item Description |
| 1 | Earth work on excavation of foundation in hard soil within 50m initial lead & 1.5 m initial lift including dressing and leveling the bed & depositing the excavated materials within above lead & lift. |
| 2 | Earthwork in excavation of foundation in hard soil such as Hard stiff clay, stiff black cotton, hard red earth, shales, moorum ordinary gravels etc within 50m.Initial lead and 1.5m. Initial lift including rough dressing and levelling the bed and depositing the excavated materials within initial lead at nearby the worksite for reuse including breaking clods and stacking rubble for spreading and leveling as the case may be etc complete as per direction of the Engineer-in-charge. |
| 3 | Filling in F&P with sand wall watered and rammed. |
| 4 | C.C. (1:4:8) with 4cm size of h.g. metal. |
| 5 | Fly Ash. Brick masonary in cm (1:6) in foundation and plinth 25cm x 12cm x 8cm size |
| 6 | Filling in F&P with excavated materials. |
| 7 | Fly Ash Brick masonary in cm (1:6) in supper structure. |
| 8 | 12mm thick cement plaster over brick works.(1:6) |
| 9 | 20mm (¾\\") thick C.P. (1:6) over F&P works. |
| 10 | Rigid and smooth centering & shuttering for RCC works including tales works after dismantlling then after centering including cost of all materials in ground floor.c base+Colum/Pillar+Plinth Bend |
| 11 | Rigid and smooth centering & shuttering for RCC works including tales works after dismantlling then after centering including cost of all materials in ground floor.Lintel |
| 12 | Rigid and smooth centering & shuttering for RCC works including tales works after dismantlling then after centering including cost of all materials in ground floor.Chajah |
| 13 | Rigid and smooth centering & shuttering for RCC works including tales works after dismantlling then after centering including cost of all materials in ground floor.Roof Slab |
| 14 | RCC (1:2:4) with 12mm size C.B. chips including hoisting and laying |
| 15 | Supplying fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification. Quantity same as Item No.10 i.e. 3.59cum @ 0.90 Qntl. Per cum |
| 16 | C.C. (1:2:4) with 12mm size hard granite chips |
| 17 | Supply fitting and fixing of Iron Door with iron choukhat of (size 1.00 x 2.00m) |
| 18 | Supply fitting and fixing of Iron window with iron choukhat of (size 0.90 x 1.20m) with Grill |
| 19 | 2.5cm A.S. flooring with C.C.(1:2:4) with 12mm size chips. |
| 20 | Painting 2 coats with approved shade of paint after a coat of primer including all cost. |
| 21 | Distempering two coats to walls with distermper of approved shade on new work to give an even shade after 1 coat of white washing |
| 22 | 20mm thick cement plaster 1 :4 for grading plaster |
| 23 | Supply, fitting and fixing of skylight |
| 24 | Writing charges of required data on the wall of pump chamber |
| 25 | Cement punning |
| 26 | Labour charges for writing reqd. data & information on the Brick pillar |
| 27 | Cost of Outlet |
| 28 | Supplying all materials, labour, T&P for jointing of 200 mm outer dia High Density Polythylene Pipes of specified material grade & pressure rating by butt fusion welding method as per speciication & laying in tranches including testing including all cost etc complete as per direction of the Engineer-in-charge |
| 29 | Filling in F&P with excavated materials in layers not exceeding 0.30m including breaking clods within 50m. initial lead including leveling the tranches as the case may be etc complete as per direction of the Engineer-in-charge |
| 30 | Supplying all materials, labour, T&P for jointing of 160 mm outer dia High Density Polythylene Pipes of specified material grade & pressure rating by butt fusion welding method as per speciication & laying in tranches including testing including all cost etc complete as per direction of the Engineer-in-charge |
| 31 | Electrical installation including labour charges of Control chamber wiring, fitting of all electrical equipment with help of back light board including all required petty purchase materials fitting & fixing of danger board, energy meter, laying of T.d. cable including power supply & commissioning etc. 1 Set |
| 32 | Earthing with help of 1½\\" dia G.I. Pipe 2 Nos. incuding all baour and required materials such as G.I. Wire G.I. Socket, Charoal, Salt, small size nut & bolts and all other materials required including excavation of earth pit & fitting thereof in complete - 1 No. |
| 33 | Cost of 160mm Ø Butterfly Valve with all fittings (160mm Ø MS Pipe 1mtr. length, 160mm Ø Socket-2 Nos. and Flange-2 Nos. |
| 34 | Cost, supplying of 160 mm x 160 mm x 110 mm Ø weld less G.I. Tee (3.6mm thickness) with bend, closing and opening arrangement of reputed brand including all cost, conveyance, cess etc. complete |
| 35 | Cost of Sign Board / Digitilation of Pre Post Photo / Display Board in ACP Sheet with Informatory Information including fixing etc all. |
| 36 | 12.5 HP/9.375 KW Energy efficiency Monoblock pump set of total head 20 mtrs having discharge 1700 LPM with squirrel cage induction motor fitted with bronze impeller |
| 37 | Cost of Control Panel with Automatic Star Delta Starter, relay range 8.9 to 13.5 with MCB for pump up to 15 HP |
| 38 | Cost of 6 KVAR Capacitor |
| 39 | Cost of 63 Amp-400 V.T.P main switch confirming to IS No.4064 |
| 40 | Cost of motor hood made out of 18 gauge CR sheet |
| 41 | Cost of Base plate made of MS Angle with holos |
| 42 | Cost of 3 x 16 mm2 T.D. Cable |
| 43 | Cost of 4.0mm2 PVC Single Core Copper Wire |
| 44 | Cost of 100 mm Ø G.I. Pipe |
| 45 | Cost of 100 mm Ø G.I. Bend |
| 46 | Cost of 100 mm Ø C.I. Foot Valve |
| 47 | Cost of 100 mm Ø G.I. Flange |
| 48 | Cost of Rubber Insertion, Nut Bolt etc. |
| 49 | Cost of 100 mm Ø C.I. Reflux Valve (NR) |
| 50 | Cost of 50 mm Ø Kirloskar make C.I. double Air release valve with saddle & Raiser pipe |
| 51 | Cost of 200 x 200 x 160 mm Spigot moulded reducing HDPE Tee 10 kg |
| 52 | Cost of 100x100x25mm G.I. Tee with ball valve for priming |
| 53 | Cost of 200mm x 160mm Ø MS Reducer |
| 54 | Labour charges for suction & delivery pipe fitting including fitting of priming Tee, sluice Valve, NR Valve, Air release valve and riser Tee etc and installation of Motor |
| 55 | Cost of 160 mm Ø HDPE Pipe PN 4 (PE-80) |
| 56 | Cost of 200 mm Ø HDPE Pipe PN 4 (PE-80) |
| 57 | Cost of 200 mm Ø HDPE Bend |
| 58 | Cost of 200 mm HDPE End Cap |
| 59 | Cost of 200 mm HDPE Tail piece 160 mm long |
| 60 | Cost of 160 mm HDPE Tail piece 160 mm long |
| 61 | Cost of 160 mm HDPE End Cap |
| 62 | Construction of 3 phase 11 KV HT line as per REC standard confirming to IE Rules 1956 with 400 kg 10 M long PSC Pole with 55 Sqmm AAA Conductor average span 50mtr , 11 KV \\"V\\" Cross arm required No.of 11 KV T C Disc. polymer Insulators in tension point with spike provision |
| 63 | Construction and erection of 11 /0.4 KV , 25 KVA (Level-II,Star-II)Double Pole mounted Substation with 5mtrx3mtrx1.5mtr height mesonary toe wall /G.I. Flat fencing boundary wall with Flat with Polymer insulator ,L.T Dist Box with MCCB , Aluminim bus bar of single bay including tapping pole with material and spike provision |
| 64 | Construction of 3 Phase L.T line as per REC standard confirming to RE rule 1956 with 300Kg 9 Mtr long PSC pole support in 30M span length with 3x35mm² +1x25 mm ² LT, AB cable with coil earthing device, LT dead end clam, Suspension clamp with spike provision |
| 65 | Electrical Earthing including all materials as per the direction of the Engineer- incharge including all Taxes excluding cost of GST. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 31, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender