Tender For Ofc Construction Work Under 4G Saturation In Udaipur Oa Of Udaipur Ba
Tender Value
1.50 Crore
Estimated cost
Bid Submission
13 Nov 2026
15 days left
EMD
3 Lakhs
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jaipur → Rajasthan
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Ofc Construction Work Under 4G Saturation In Udaipur Oa Of Udaipur Ba
BOQ
| Sl. No. | Item Description |
| 1 | Excavation of Trenches/HDD |
| 2 | Excavating trenches up to a depth of 1.65m and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection as per tender specification |
| 3 | i) In Non Rocky Soil /Soft Soil/Kachcha soil (0.45+0.30)/2*1.65*1 |
| 4 | ii) In Pucca Soil |
| 5 | ii) In Soft Rock Soil /Disintegrated (D.I.) Soil (0.45+0.30)/2*1.65*1 |
| 6 | iii) in Rocky soil/Hard Rock Soil (0.45+0.30)/2*1.65*1 |
| 7 | Excavation and trenching including tunneling or boring and reinstatement as per construction specification of tender to a depth of 1.65 mtrs in bituminized/ concrete/set stone (rate per meter) for single PLB pipe. |
| 8 | Laying of PLB HDPE duct by HDD method at a depth of 1.65 mtrs or more ( for single PLB pipe ) in Soft Soil |
| 9 | Laying of PLB HDPE duct by HDD method at a depth of 1.65 mtrs or more ( for single PLB pipe ) in Rocky Soil |
| 10 | Road/Rail crossing through horizontal boring method and inserting 65/50/40 Dia G.I./DWC pipes & pushing HDPE Pipe/Coils inside & drawing PP rope. |
| 11 | The Executive agency will supply PLB HDPE pipes/coil PP rope . |
| 12 | Laying of PLB HDPE pipe/GI Pipe/RCC pipe/DWC |
| 13 | Laying of single PLB HDPE Pipes/Coils, coupled with coupler |
| 14 | The Executive Agency will supply PLB Pipe /PLB sockets/Coupler, End caps. |
| 15 | Laying and fixing of G.I. Pipes (Medium duty class having inner diameter of 50mm, as per ISI specifications) in trenches with PLB pipe HDPE Pipes/Coils inside |
| 16 | Laying and fixing G.I. pipes(Medium duty class having inner diameter of 50mm, as per ISI specification) in trenches on Bridges and Culverts with PLB HDPE pipes/Coils inside |
| 17 | Laying and fixing of G.I. Pipes (Medium duty class having inner diameter of 50mm, as per ISI specifications) in trenches with PLB pipe HDPE Pipes/Coils inside (G.I. Pipe supplied by Contractor) |
| 18 | Laying of full round RCC (ISI mark)/DWC pipe (As per existing TEC GR no. GR/DWC-34/01 sep-2007 with latest amendments) in trenches over PLB HDPE pipes/coils, on culverts/bridges/Nula and for cases where cable is laid at less depth (wherever required) |
| 19 | Laying of half- split RCC(ISI Mark)/DWC pipe (as per existing TEC GR no GR/DWC-34/01 sep 2007 with latest amendment) in trenches over PLB HDPE pipes /coils, on culverts/ bridges/nula/and for cases where cable is laid at less depth (wherever required) |
| 20 | Providing cement concrete 1:2:4 at Wheel guard of bridge/culvert over the toe or in the trench for protection 25cm* 25cm over 40mm Dia PLB pipe |
| 21 | Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh (as per specification of tender) in the trenches for protection, where the depth is less than 120 Cms (Cement Concrete as per specification) 25cm* 25cm over 40mm Dia PLB pipe |
| 22 | PLB HDPE ducts will be supplied by the Executive Agency. All other materials required for the work shall be arranged by the contractor. Rates include cost of material and standard curing, shuttering etc. and transportation from stores. |
| 23 | Cable laying by Pulling/blowing |
| 24 | Laying of OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes |
| 25 | OFC will be provided by the Executive Agency. All other materials required for the work shall be arranged by the contractor. |
| 26 | Splicing of cable |
| 27 | Splicing of fibers in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost (6F,12F & 24F) |
| 28 | Splicing of all the fibers of (6F, 12F & 24F) OF cable in the fibre termination box at the Gram Panchayats and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 29 | Splicing of fibers (48F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost |
| 30 | Splicing of all the fibers of (48F) OF cable in the fibre termination box (FDMS) at the Exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 31 | Splicing of fibers (96F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost |
| 32 | Splicing of all the fibers of (96F) OF cable in the fibre termination box (FDMS) at the exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 33 | Note: ALL tools, splicing machine and instruments required for the work shall be arranged by the contractor. |
| 34 | Jointing Chamber |
| 35 | Construction of Bricks joints chamber as per specification and the construction practice as specified in the tender document |
| 36 | Construction of pre fabricated RCC joints chamber as per specification and the construction practice as specified in the tender document |
| 37 | Digging of pits for Existing Joint Chamber, filling of Joint Chamber with clean sand & back filling of jointing pit as per tender specifications. |
| 38 | Note: ALL materials required for the work shall be arranged by the contractor. |
| 39 | Route indicator |
| 40 | Digging of pit 1 mtr towards jungle side on each main hole/joint chamber for fixing of route/joint indicator fixing & concreting of route/joint /route indicator painting & sign writing of route including supply of Joint/route indicator |
| 41 | Restoration of road surface |
| 42 | Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface ( total up to 75mm thick ), including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997 |
| 43 | Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road. |
| 44 | Note: ALL materials required for the work shall be arranged by the contractor. |
| 45 | Route index Diagram |
| 46 | Supply of route index diagram in hard as well as soft copy on CD for complete Block |
| 47 | Videography of the route on which cable is laid |
| 48 | Note: The contractor shall arrange all materials required for the work. |
| 49 | Laying of OF cable in buildings( Leading in work) |
| 50 | Laying of OF cable in corridor/risers/exchange premises (leading work) |
| 51 | Mounting of FDMS at OLT locations |
| 52 | Physical mounting of FDMS/WSC on wall |
| 53 | Recovery of Store |
| 54 | Recovery of empty 24F cable Drum (Less) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 13, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysNov 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender