Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 19 days TDR #58160846

Bids Are invited for Custom Bid For Services - M19787 For Laying Of New Hdpe Pipelines For Process Water And Drinking Water From Wtp To Plant At Mcp - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And

Issued by Boards / Undertakings / PSU · Balaghat, Madhya Pradesh
Tender Value
49.46 Lakhs
Estimated cost
Bid Submission
12 Nov 2026
19 days left
EMD
98900
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Balaghat → Madhya Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - M19787 For Laying Of New Hdpe Pipelines For Process Water And Drinking Water From Wtp To Plant At Mcp - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms,Depth Upto 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth,Including Consolidating Each Deposited Layer By Ramming, Watering,Etc. And Disposing Of Surplus Excavated Soil As Directed, Within Alead Of 50 M :-All Kinds Of Soil -Pipes, Cables Etc. Exceeding 80 Mm Dia. But Not Exceeding 300 Mm Dia , Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms,Depth Upto 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth,Including Consolidating Each Deposited Layer By Ramming, Watering,Etc. And Disposing Of Surplus Excavated Soil As Directed, Within Alead Of 50 M :-All Kinds Of Soil -Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm , Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil- Pipes, Cables Etc. Exceeding 80 Mm Dia. But Not Exceeding 300 Mm Dia For Depth Exceeding 1.5 M, But Not Exceeding 3 M. , Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil- Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm For Depth Exceeding 1.5 M, But Not Exceeding 3 M. , Excavating Trenches Of Required Width For Pipes, Cables, Etc, Including Excavation For Sockets, Depth Upto 1.5 M, Including Getting Out The Excavated Materials, Returning The Soil As Required In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layers By Ramming, Watering Etc., Stacking Serviceable Material For Measurements And Disposal Of Unserviceable Material As Directed,Within A Lead Of 50 M :Ordinary Rock : - Pipes, Cables Etc. Exceeding 80 Mm Dia But Not Exceeding 300 Mm Dia , Excavating Trenches Of Required Width For Pipes, Cables, Etc, Including Excavation For Sockets, Depth Upto 1.5 M, Including Getting Out The Excavated Materials, Returning The Soil As Required In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layers By Ramming, Watering Etc., Stacking Serviceable Material For Measurements And Disposal Of Unserviceable Material As Directed,Within A Lead Of 50 M :Ordinary Rock : - Pipes, Cables Exceeding 300 Mm Dia But Not Exceeding 600 Mm Dia , Extra For Excavating Trenches For Pipes, Cables, Etc. In Ordinary Rock Exceeding 1.5 M In Depth But Not Exceeding 3 M. -Pipes, Cables Etc. Exceeding 80 Mm Dia But Not Exceeding 300 Mm Dia , Extra For Excavating Trenches For Pipes, Cables, Etc. In Ordinary Rock Exceeding 1.5 M In Depth But Not Exceeding 3 M. -Pipes, Cables Exceeding 300 Mm Dia But Not Exceeding 600 Mm Dia , Laying And Jointing Of 250 Mm Od Hdpe Pipe Pe 100 Class, Pn 8 ,6M Length Including Specials(Y-Piece,Bend Etc.)Including Butt Welding Of Joints And Collar , Flange Joints , Laying And Jointing Of 500 Mm Od Hdpe Pipe Pe 100Class, Pn 10 ,6M Length Including Specials(Y-Piece,Bend Etc.) Including Butt Welding Of Joints And Collar , Flange Joints , Filling In Plinth With Best Available Local Sand Under Floors Including Watering, Ramming Consolidating And Dressing Complete , Spreading Moorum In Specified Thickness As Directed By Engineer -In- Charge Including Watering And Rolling With Hand Roller Etc. Complete. (Payment Of Moorum To Be Made Separately) , Filling Murum In Trenches, Plinth,Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth,Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. , Supplying And Stacking At Site Good Quality Moorum. , Filling Available Excavated Earth (Excluding Rock) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. , Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Upto 30 Cm Measured At A Height Of 1M Above Ground Level And Removal Of Rubbish Upto A Distance Of 50 M Outside The Periphery Of The Area Cleared. , Surface Dressing Of The Ground Including Removing Vegetation And Inequalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish, Lead Upto 50 M And Lift Upto 1.5 M. All Kinds Of Soil , Fixing Of Sluice Valve , Nrv , Air Release Valve For 500 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 250 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 200 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 150 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 100 Mm Od Hdpe Pipes , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means Over Areas (Exceeding 30Cm In Depth. 1.5M In Width As Well As 10 Sqm On Plan) Including Disposal Of Excavated Earth, Lead Upto 50M And Lift Upto 1.5M, Disposed Earth To Be Levelled And Neatly Dressed :-All Kinds Of Soil , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan) Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M:-All Kinds Of Soil. , Transportation By Mechanical Means Of Hdpe Pipes And Specials,Valves,Flanges,Other Connected Fittings Etc. From Plant Area To Work Site Including Loading Unloading And Stacking , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:3:6 (1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 40 Mm Nominal Size) (Mines Waste Rock Free Issue). , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level :1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size) (Only Crusher Broken Aggregate To Be Used). , Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete:-Cold Twisted Bars , Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For :Foundations, Footings, Bases Of Columns, Etc. For Mass Concrete, Walls, Slabs. , 6 Mm Cement Plaster Of Mix :1:3 (1 Cement: 3 Fine Sand) , Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Water Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels / Subway And Bridge Deck Etc., Prepared By Mixing In The Ratio Of 5 : 2 (5 Parts Integral Crystalline Slurry : 2 Parts Water) For Vertical Surfaces And 3 : 1 (3 Parts Integral Crystalline Slurry : 1 Part Water) For Horizontal Surfaces And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Brush. The Material Shall Meet The Requirements As Specified In Aci- 212-3R-2010 I.E By Reducing Permeability Of Concrete By More Than 90% Compared With Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per Specification And The Direction Of The Engineer-In-Charge. The Product Performance Shall Carry Guarantee For 10 Years Against Any Leakage. For Vertical Surface Two Coats @ 0.70 Kg Per Sqm , Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Water Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels / Subway And Bridge Deck Etc., Prepared By Mixing In The Ratio Of 5 : 2 (5 Parts Integral Crystalline Slurry : 2 Parts Water) For Vertical Surfaces And 3 : 1 (3 Parts Integral Crystalline Slurry : 1 Part Water) For Horizontal Surfaces And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Brush. The Material Shall Meet The Requirements As Specified In Aci- 212-3R-2010 I.E By Reducing Permeability Of Concrete By More Than 90% Compared With Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per Specification And The Direction Of The Engineer-In-Charge. The Product Performance Shall Carry Guarantee For 10 Years Against Any Leakage. For Horizontal Surface One Coat @1.10 Kg Per Sqm. , Extra For Providing And Mixing Water Resisting And Crystalline Waterproofing Concrete Admixture In Cement Concrete Work @ 1 Kg Per 50 Kg Of Cement As Approved By Eic. , Structural Steel Work In Single Section, Fixed With Or Without Connecting Plate,Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete Of Required Profile (Trapezoidal, Eaves, Valley Or Boundary Wall) , Neat Cement Punning.

BOQ

Sl. No. Item TitleItem Description
1Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. and disposing of surplus excavated soil as directed, within alead of 50 m :-All kinds of soil -Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm diaExcavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. and disposing of surplus excavated soil as directed, within alead of 50 m :-All kinds of soil -Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia
2Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. and disposing of surplus excavated soil as directed, within alead of 50 m :-All kinds of soil -Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mmExcavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth,including consolidating each deposited layer by ramming, watering,etc. and disposing of surplus excavated soil as directed, within alead of 50 m :-All kinds of soil -Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm
3Extra for excavating trenches for pipes, cables etc. in all kinds of soil- Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia for depth exceeding 1.5 m, but not exceeding 3 m.Extra for excavating trenches for pipes, cables etc. in all kinds of soil- Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia for depth exceeding 1.5 m, but not exceeding 3 m.
4Extra for excavating trenches for pipes, cables etc. in all kinds of soil- Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm for depth exceeding 1.5 m, but not exceeding 3 m.Extra for excavating trenches for pipes, cables etc. in all kinds of soil- Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm for depth exceeding 1.5 m, but not exceeding 3 m.
5Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed,within a lead of 50 m :Ordinary rock : - Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm diaExcavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed,within a lead of 50 m :Ordinary rock : - Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia
6Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed,within a lead of 50 m :Ordinary rock : - Pipes, cables exceeding 300 mm dia but not exceeding 600 mm diaExcavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed,within a lead of 50 m :Ordinary rock : - Pipes, cables exceeding 300 mm dia but not exceeding 600 mm dia
7Extra for excavating trenches for pipes, cables, etc. in ordinary rock exceeding 1.5 m in depth but not exceeding 3 m. -Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm diaExtra for excavating trenches for pipes, cables, etc. in ordinary rock exceeding 1.5 m in depth but not exceeding 3 m. -Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia
8Extra for excavating trenches for pipes, cables, etc. in ordinary rock exceeding 1.5 m in depth but not exceeding 3 m. -Pipes, cables exceeding 300 mm dia but not exceeding 600 mm diaExtra for excavating trenches for pipes, cables, etc. in ordinary rock exceeding 1.5 m in depth but not exceeding 3 m. -Pipes, cables exceeding 300 mm dia but not exceeding 600 mm dia
9Laying and jointing of 250 MM OD HDPE pipe PE 100 Class, PN 8 ,6M length including specials(Y-piece,bend etc.)including butt welding of joints and collar , flange jointsLaying and jointing of 250 MM OD HDPE pipe PE 100 Class, PN 8 ,6M length including specials(Y-piece,bend etc.)including butt welding of joints and collar , flange joints
10Laying and jointing of 500 MM OD HDPE pipe PE 100Class, PN 10 ,6M length including specials(Y-piece,bend etc.) including butt welding of joints and collar , flange jointsLaying and jointing of 500 MM OD HDPE pipe PE 100Class, PN 10 ,6M length including specials(Y-piece,bend etc.) including butt welding of joints and collar , flange joints
11Filling in plinth with best available local sand under floors including watering, ramming consolidating and dressing completeFilling in plinth with best available local sand under floors including watering, ramming consolidating and dressing complete
12Spreading moorum in specified thickness as directed by Engineer -In- Charge including watering and rolling with hand roller etc. complete. (Payment of moorum to be made separately)Spreading moorum in specified thickness as directed by Engineer -In- Charge including watering and rolling with hand roller etc. complete. (Payment of moorum to be made separately)
13Filling murum in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Filling murum in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
14Supplying and stacking at site Good quality Moorum.Supplying and stacking at site Good quality Moorum.
15Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
16Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
17Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soilSurface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil
18Fixing of Sluice valve , NRV , air release valve for 500 MM OD HDPE pipesFixing of Sluice valve , NRV , air release valve for 500 MM OD HDPE pipes
19Fixing of Sluice valve , NRV,air release valve for 250 MM OD HDPE pipesFixing of Sluice valve , NRV,air release valve for 250 MM OD HDPE pipes
20Fixing of Sluice valve , NRV,air release valve for 200 MM OD HDPE pipesFixing of Sluice valve , NRV,air release valve for 200 MM OD HDPE pipes
21Fixing of Sluice valve , NRV,air release valve for 150 MM OD HDPE pipesFixing of Sluice valve , NRV,air release valve for 150 MM OD HDPE pipes
22Fixing of Sluice valve , NRV,air release valve for 100 MM OD HDPE pipesFixing of Sluice valve , NRV,air release valve for 100 MM OD HDPE pipes
23Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed :-All kinds of soilEarth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed :-All kinds of soil
24Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m:-All kinds of soil.Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m:-All kinds of soil.
25Transportation by mechanical means of HDPE pipes and specials,valves,flanges,other connected fittings etc. from plant area to work site including loading unloading and stackingTransportation by mechanical means of HDPE pipes and specials,valves,flanges,other connected fittings etc. from plant area to work site including loading unloading and stacking
26Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) (Mines waste rock free issue).Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) (Mines waste rock free issue).
27Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Only crusher broken aggregate to be used).Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Only crusher broken aggregate to be used).
28Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete:-Cold twisted barsReinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete:-Cold twisted bars
29Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete, walls, slabs.Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete, walls, slabs.
306 mm cement plaster of mix :1:3 (1 cement: 3 fine sand)6 mm cement plaster of mix :1:3 (1 cement: 3 fine sand)
31Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For vertical surface two coats @ 0.70 kg per sqmProviding and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For vertical surface two coats @ 0.70 kg per sqm
32Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI- 212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For horizontal surface one coat @1.10 kg per sqm.
33Extra for providing and mixing Water Resisting and crystalline waterproofing concrete admixture in cement concrete work @ 1 Kg per 50 Kg of cement as approved by EIC.Extra for providing and mixing Water Resisting and crystalline waterproofing concrete admixture in cement concrete work @ 1 Kg per 50 Kg of cement as approved by EIC.
34Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete of required profile (Trapezoidal, eaves, valley or boundary wall)Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete of required profile (Trapezoidal, eaves, valley or boundary wall)
35Neat cement punning.Neat cement punning.

AI Tender Summary

OUR REF NO 58160846
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 49.46 Lakhs
LAST DATE 12-11-2026
Authority
Authority Name Hindustan Copper Limited
Work Description Bids Are invited for Custom Bid For Services - M19787 For Laying Of New Hdpe Pipelines For Process Water And Drinking Water From Wtp To Plant At Mcp - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms,Depth Upto 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth,Including Consolidating Each Deposited Layer By Ramming, Watering,Etc. And Disposing Of Surplus Excavated Soil As Directed, Within Alead Of 50 M :-All Kinds Of Soil -Pipes, Cables Etc. Exceeding 80 Mm Dia. But Not Exceeding 300 Mm Dia , Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms,Depth Upto 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth,Including Consolidating Each Deposited Layer By Ramming, Watering,Etc. And Disposing Of Surplus Excavated Soil As Directed, Within Alead Of 50 M :-All Kinds Of Soil -Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm , Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil- Pipes, Cables Etc. Exceeding 80 Mm Dia. But Not Exceeding 300 Mm Dia For Depth Exceeding 1.5 M, But Not Exceeding 3 M. , Extra For Excavating Trenches For Pipes, Cables Etc. In All Kinds Of Soil- Pipes, Cables Etc. Exceeding 300 Mm Dia But Not Exceeding 600 Mm For Depth Exceeding 1.5 M, But Not Exceeding 3 M. , Excavating Trenches Of Required Width For Pipes, Cables, Etc, Including Excavation For Sockets, Depth Upto 1.5 M, Including Getting Out The Excavated Materials, Returning The Soil As Required In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layers By Ramming, Watering Etc., Stacking Serviceable Material For Measurements And Disposal Of Unserviceable Material As Directed,Within A Lead Of 50 M :Ordinary Rock : - Pipes, Cables Etc. Exceeding 80 Mm Dia But Not Exceeding 300 Mm Dia , Excavating Trenches Of Required Width For Pipes, Cables, Etc, Including Excavation For Sockets, Depth Upto 1.5 M, Including Getting Out The Excavated Materials, Returning The Soil As Required In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layers By Ramming, Watering Etc., Stacking Serviceable Material For Measurements And Disposal Of Unserviceable Material As Directed,Within A Lead Of 50 M :Ordinary Rock : - Pipes, Cables Exceeding 300 Mm Dia But Not Exceeding 600 Mm Dia , Extra For Excavating Trenches For Pipes, Cables, Etc. In Ordinary Rock Exceeding 1.5 M In Depth But Not Exceeding 3 M. -Pipes, Cables Etc. Exceeding 80 Mm Dia But Not Exceeding 300 Mm Dia , Extra For Excavating Trenches For Pipes, Cables, Etc. In Ordinary Rock Exceeding 1.5 M In Depth But Not Exceeding 3 M. -Pipes, Cables Exceeding 300 Mm Dia But Not Exceeding 600 Mm Dia , Laying And Jointing Of 250 Mm Od Hdpe Pipe Pe 100 Class, Pn 8 ,6M Length Including Specials(Y-Piece,Bend Etc.)Including Butt Welding Of Joints And Collar , Flange Joints , Laying And Jointing Of 500 Mm Od Hdpe Pipe Pe 100Class, Pn 10 ,6M Length Including Specials(Y-Piece,Bend Etc.) Including Butt Welding Of Joints And Collar , Flange Joints , Filling In Plinth With Best Available Local Sand Under Floors Including Watering, Ramming Consolidating And Dressing Complete , Spreading Moorum In Specified Thickness As Directed By Engineer -In- Charge Including Watering And Rolling With Hand Roller Etc. Complete. (Payment Of Moorum To Be Made Separately) , Filling Murum In Trenches, Plinth,Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth,Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. , Supplying And Stacking At Site Good Quality Moorum. , Filling Available Excavated Earth (Excluding Rock) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. , Clearing Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Saplings Of Girth Upto 30 Cm Measured At A Height Of 1M Above Ground Level And Removal Of Rubbish Upto A Distance Of 50 M Outside The Periphery Of The Area Cleared. , Surface Dressing Of The Ground Including Removing Vegetation And Inequalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish, Lead Upto 50 M And Lift Upto 1.5 M. All Kinds Of Soil , Fixing Of Sluice Valve , Nrv , Air Release Valve For 500 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 250 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 200 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 150 Mm Od Hdpe Pipes , Fixing Of Sluice Valve , Nrv,Air Release Valve For 100 Mm Od Hdpe Pipes , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means Over Areas (Exceeding 30Cm In Depth. 1.5M In Width As Well As 10 Sqm On Plan) Including Disposal Of Excavated Earth, Lead Upto 50M And Lift Upto 1.5M, Disposed Earth To Be Levelled And Neatly Dressed :-All Kinds Of Soil , Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan) Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M:-All Kinds Of Soil. , Transportation By Mechanical Means Of Hdpe Pipes And Specials,Valves,Flanges,Other Connected Fittings Etc. From Plant Area To Work Site Including Loading Unloading And Stacking , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:3:6 (1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 40 Mm Nominal Size) (Mines Waste Rock Free Issue). , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level :1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size) (Only Crusher Broken Aggregate To Be Used). , Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete:-Cold Twisted Bars , Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For :Foundations, Footings, Bases Of Columns, Etc. For Mass Concrete, Walls, Slabs. , 6 Mm Cement Plaster Of Mix :1:3 (1 Cement: 3 Fine Sand) , Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Water Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels / Subway And Bridge Deck Etc., Prepared By Mixing In The Ratio Of 5 : 2 (5 Parts Integral Crystalline Slurry : 2 Parts Water) For Vertical Surfaces And 3 : 1 (3 Parts Integral Crystalline Slurry : 1 Part Water) For Horizontal Surfaces And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Brush. The Material Shall Meet The Requirements As Specified In Aci- 212-3R-2010 I.E By Reducing Permeability Of Concrete By More Than 90% Compared With Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per Specification And The Direction Of The Engineer-In-Charge. The Product Performance Shall Carry Guarantee For 10 Years Against Any Leakage. For Vertical Surface Two Coats @ 0.70 Kg Per Sqm , Providing And Applying Integral Crystalline Slurry Of Hydrophilic In Nature For Waterproofing Treatment To The Rcc Structures Like Retaining Walls Of The Basement, Water Tanks, Roof Slabs, Podiums, Reservior, Sewage & Water Treatment Plant, Tunnels / Subway And Bridge Deck Etc., Prepared By Mixing In The Ratio Of 5 : 2 (5 Parts Integral Crystalline Slurry : 2 Parts Water) For Vertical Surfaces And 3 : 1 (3 Parts Integral Crystalline Slurry : 1 Part Water) For Horizontal Surfaces And Applying The Same From Negative (Internal) Side With The Help Of Synthetic Fiber Brush. The Material Shall Meet The Requirements As Specified In Aci- 212-3R-2010 I.E By Reducing Permeability Of Concrete By More Than 90% Compared With Control Concrete As Per Din 1048 And Resistant To 16 Bar Hydrostatic Pressure On Negative Side. The Crystalline Slurry Shall Be Capable Of Self-Healing Of Cracks Up To A Width Of 0.50Mm. The Work Shall Be Carried Out All Complete As Per Specification And The Direction Of The Engineer-In-Charge. The Product Performance Shall Carry Guarantee For 10 Years Against Any Leakage. For Horizontal Surface One Coat @1.10 Kg Per Sqm. , Extra For Providing And Mixing Water Resisting And Crystalline Waterproofing Concrete Admixture In Cement Concrete Work @ 1 Kg Per 50 Kg Of Cement As Approved By Eic. , Structural Steel Work In Single Section, Fixed With Or Without Connecting Plate,Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete Of Required Profile (Trapezoidal, Eaves, Valley Or Boundary Wall) , Neat Cement Punning.
Basic Detail
Tender No GEM/2026/B/8189063
Bidding Type Tender
Location
City Balaghat
State Madhya Pradesh
Key Dates
Publish Date 22 Oct 2026
Submission Date 12 Nov 2026
Open Date 13 Nov 2026
Finance
Tender Value 49.46 Lakhs
Tender Fee Ref. Documents
EMD 98900
Exemption Not Available
Document List
5979dcd0-08e9-41ad-97f8-92d5deda8735.pdf
1792664574.xlsx
1792664583.pdf
1792664587.pdf
1792664593.pdf
1792664596.pdf
M19787_cc7f9bff-4aa0-4345-8ea81792664672532_mithlesh_c.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Nov 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
pdf

5979dcd0-08e9-41ad-97f8-92d5deda8735.pdf

xlsx

1792664574.xlsx

pdf

1792664583.pdf

pdf

1792664587.pdf

pdf

1792664593.pdf

pdf

1792664596.pdf

pdf

M19787_cc7f9bff-4aa0-4345-8ea81792664672532_mithlesh_c.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender