Bids Are invited for Custom Bid For Services - M19786 For Miscellaneous Civil Works Required For Upkeep Of Township Quarters And Public Buildings At Mcp 2026-27 - Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means Over
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - M19786 For Miscellaneous Civil Works Required For Upkeep Of Township Quarters And Public Buildings At Mcp 2026-27 - Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means Over Areas (Exceeding 30Cm In Depth. 1.5M In Width As Well As 10 Sqm On Plan) Including Disposal Of Excavated Earth, Lead Upto 50M And Li , Supplying And Filling In Plinth With Best Locally Available Sand Under Floors Including, Watering, Ramming Consolidating And Dressing Complete. , Clearing Of Grass And Removal Of The Rubbish Upto A Distance Of 50 M Outside The Periphery Of The Area Cleared. , Providing And Laying Cement Concrete In Retaining Walls, Return Walls, Walls(Any Thickness) Including Attached Pilasters, Columns, Piers, Abutments, Pillars, Posts, Struts, Buttresses, String Or Lacing Courses, Parapets, Coping, Bed Blocks, Anchor Blocks, Plain Window Sills, Fillets Etc. Up To Floor Five Level, Excluding The Cost Of Centering, Shuttering And Finishing :1:2:4 (1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size) , R.C.C. Work In Walls,Includ Attached Pilasters, Buttresses, Plinth And String Courses, Fillets, Columns, Pillars, Piers, Abutments, Posts And Struts Etc.Up To Floor Five Level Excluding Cost Of Centering, Shuttering, Finishing And Reinforcement In Cement Concrete 1:2:4/ , Centering And Shuttering For Precast Concrete Slabs For Manholes, Drains Etc, Including Removal Of Form Work Etc. Complete. , Providing Precast Reinforced Cement Concrete Slabs And The Likes Including Finishing Wherever Necessary But Excluding The Cost Of Centering, Shuttering And Reinforcement With 1:2:4 (1 Cement:2 Sand: 4 Graded Stone Aggregate 20 Mm Nominal Size). , Providing And Laying Brick Work With Locally Best Available Bricks In Cement Mortar 1:6 (1 Cement: 6 Sand) In Foundation And Plinth. , Providing And Laying Half Brick Masonry With Locally Best Available Bricks In Super Structure From Plinth (Floor One Level To Floor Two Levels In Cement Mortar 1:4 (1 Cement: 4 Sand). , Providing And Laying Random Rubble Masonry With Hard Stone In Super Structure Above Plinth Level Including Leveling Up With Cement Concrete 1:6:12 (1 Cemenmt;6 Sand:12 Stone Aggregate 20 Mm Size) In Cement Mortar 1:6 (1 Cement:6 Sand). , 12 Mm Cement Plaster Of Mix :1:6 (1 Cement: 6 Fine Sand) , 12 Mm Cement Plaster Of Mix 1:4 (1 Cement: 4 Fine Sand) At Any Height , 6 Mm Cement Plaster Of Mix :1:3 (1 Cement: 3 Fine Sand) , Neat Cement Punning. , Grading Roof For Water Proofing Treatment With Cement Concrete 1:2:4 (1 Cement: 2 Sand :4 Graded Stone Aggregates 20 Mm Nominal Size). , Finishing Walls With Water Proofing Cement Paint Of Approved Brand And Manufacture (Viz Snowcem Plus Or Equivalent Quality) And Of Required Shade To Give An Even Shade For All Heights:Old Work One Or More Coats , Providing & Mixing Water Proofing Material Of Approved Brand And Quality In Cement In The Proportion Recommended By The Manufacturer As Per Specification And Direction Of Engineer-In-Charge , Providing Gola 75X75 Mm In Cement Concrete 1:2:4 (1 Cement: 2 Sand: 4 Stone Aggregate 10 Mm And Downgraded) Including Finishing With Cement Mortar 1:3 (1 Cement:3 Sand) As Per Standard Design, Including Cutting Of Chase Wherever Required. , Disposal / Transportation Of Waste / Rubbish, Old Bricks Etc By Mechanical Transport Including Loading, Unloading, Leveling, Dressing Of Rubbish Up To A Distance Of One Km From The Work Site. , Providing And Laying Cement Concrete In Footings, Foundations Etc, Including The Cost Of Centering & Shuttering (Wherever Required) In 1:4:8(1 Cement:4 Sand:8 Graded Stone Aggregate, 40 Mm Nominal Size). , Providing And Laying Cement Concrete In Footing And Bases For Columns Excluding The Cost Of Centering And Shuttering (Wherever Required) Of Mix 1:3:6 (1 Cement : 3 Sand : 6 Graded Stone Aggregate) 40 Mm Nominal Size. , Reinforcement For Rcc Works Including Straightening, Cutting, Bending, Binding & Placing In Position Complete. Mild Steel Round , Reinforcement For Rcc Works Including Straightening, Cutting, Bending, Binding & Placing In Position Complete.Tor Steel , Demolishing Stones Rubble Masonry Including Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials Within 50 Mtr Lead In Cement Mortar At All Height , Painting Top Of Roofs With Bitumen Of Approved Quality At 17 Kg Per 10 M2 Impregnated With A Coat Of Coarse Sand At 60 Cu Dm Per 10 M2 Including Cleaning The Slab Surface With Brushes And Finally With A Piece Of Cloth Lightly Soaked In Kerosene Oil Complete.With Residual Type Petroleum Bitumen Of Penetration 80/100. Removing Existing Old Dilapidated Tar Felting From Roof Terraces And Disposal Of The Waste Within 50 Mtrs. Lead As Per The Direction Of The Engineer-In-Charge , Repairs To Plasters Of Thickness 12 Mm To 20 Mm In Patches Of Area 2.50 Sqm And Under Including Cutting The Patches In Proper Shape And Preparing And Plastering The Surface Of The Wall Complete Including Disposal Of Rubbish To The Dumping G , Distempering With Oil Bound Washable Distemper Of Approved Brand And Manufacturers To Give An Even Shade, Including Necessary Surface Preparation Etc.Old Work (One Or More Coats) , Removing Dry Or Oil Bound Distemper By Scrapping Sand Papering Etc. And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Complete. , Colour Washing Such As Green Blue Or Buff Etc. To Give An Even Shade With Lime. , Painting With Synthetic Enamel Paint Of Approved Brand & Manufacturer (Asian, Nerolac, Johnson & Nicholsen Etc) In All Shades To Give An Even Shade.A)On Steel / Wood Work Wall Etc , Dismantling Cement Concrete Including Disposal Of Materials/Rubbish Within 50 M. Lead, 1:3:6 Or Richer Mix. , Dismantling Old Plasters Or Skirting Raking Out Joints And Cleaning The Surface For Plaster Including Disposal Of Rubbish To The Dumping Ground Within 50 M. Lead. , Dismantling Brick Work Stone Work Including Stacking The Serviceable Materials And Disposal Of Unserviceable Material Within 50 M. Lead In Cement Mortar. , Providing And Laying Random Rubble Masonry With Hard Stone In Foundation And Plinth Including 1:6:12 (1 Cemenmt;6 Sand:12 Stone Aggregate 20 Leveling Up With Cement Concrete Mm Size) At Plinth Level With Cement Mortar 1:6 (1 Cement:6 Sand). , Earth Work In Excavation In Foundation Of Storm Water Drains, Removal Of Silt Etc, Not Exceeding 1.50 M .In Widths Or 10 Sqm. On Plan, Including Dressing Of Sides Back Filling The Trenches Etc. Including Getting Out The Excavated Soil As Directed By The Engineer-In-Charge, Lift Up To 1.50 & Lead Up To 50 M. In All Kind Of Soil, Except Rock , Applying Priming Coat With Ready Mixed Primer Of Approved Brand Of Metal Primer/Wood Primer , Providing & Fixing On Wall Face Un-Plasticized: Pvc Moulded Fittings/Accessories For Un- Plasticized, Pvc Rain Water Pipes Conforming To Is: 4985 Including Granting With Seal Ring Conforming To Is: 5382 Leaving 10 Mm Gape For Thermal , Providing & Fixing On Wall Face Unplastissed –Pvc Working Pressure 4 Kg/Cm2) Rainwater Pipes Conforming To Is-4985 Including Jointing With Seal Ring Conforming To Is:5382 Leaving 10 Mm Gape For Thermal Expansion Single Socketed Pipes–11 , Providing & Fixing On Wall Face Unplasticised: Pvc Moulded Fittings/Accessories For Unplastised: Pvc Rain Water Pipes Conforming To Is: 4985 Including Granting With Seal Ring Conforming To Is: 5382 Leaving 10 Mm Gape For Thermal Expansion-A)Bend 87.50 -110 Mm Dia Meter , Providing And Fixing Unplasticised – Pvc Pipe Clips Of Approved Design To Unplasticised – Pvc Rain Water Pipe By Means Of 50X50x50mm Hard Wood Plugs, Screwed With M.S. Screw, Of Required Length Including Cutting Brick Work And Fixing In , Providing & Laying Cement Concrete 1:2:4 (1 Cement:2 Sand:4 Graded Stone Aggregate 20 Mm Nominal Size) At Plinth Level & Sill Level Or Coping For Drains & Compound Wall, Including Necessary Side Shuttering & Finishing All Complete, As Per The Direction Of Engineer-In-Charge. , White Washing With Lime To Give An Even Shade Including Necessary Surface Preparation Etc.Old Work (One Or More Coats).
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender