Tender For Special Repair Work For Track Line 1,2,3 At Winch Station
Tender Overview
Project Description
Tender for Special Repair Work For Track Line 1,2,3 At Winch Station
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Nov-2026 | Tender Date Change | Date | 17-Nov-2026 |
| 2 | 17-Nov-2026 | Tender date change-2 | Date | 26-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Painting of rails including scraping cleaning and preparation pf surface to stick paint on rail surface with available rail section(60R/75R)in winch with contractors own paint, men and materials, tools & plants etc,complete |
| 2 | Removing the ER clips, cleaning including cleaning of insert over sleepers and applying the grease over ERC, INSERT WITH CONTRACTORS OWN GREASE, men and materials, tools & paints etc, complete, Renewal of broken, missing fittings wherever required from the material arranged vide ERC, Liners, GRP. |
| 3 | Opening of fish plate joints examine the joints any cracks, breakage of fish plates/rails, scraping the surface and applying grease, refixing the fish plates with bolts and nuts with contractors own grease, men and materials, tools & plates etc,complete. |
| 4 | Opening of ballast bottom of sleepers level in crib, and shoulder portion, lifting the joints upto the required level and packing with crow bars upto retain the level and boxing the ballast to correct profile with contractors own men and materials, tools & plants etc.complete. |
| 5 | Supply of ERC including all cost of materials, transportation and all conveyance charges etc,complete |
| 6 | Supply of Liner including all cost of materials, transportation and all conveyance charges etc. complete |
| 7 | Supply of GRP (Grooved rubber pad) including all cost of materials, transportation and all conveyance charges etc,complete. |
| 8 | Overhauling of Existing 1 in 6 60R/75R points and crossing and aligning, levelling to the required gradient and to match the required profile with necessary packing etc, with contractors own men and materials, tools & plants etc,complete |
| 9 | Sub Total |
| 10 | GST @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender