Tender For Package-2: Design, Engineering, Supply, Erection, Testing & Commissioning Of Hydro-Mechanical Works For 640 Mw Isp-Osp Pumped Storage Project.
Tender Value
306.74 Crore
Estimated cost
Bid Submission
03 Dec 2026
37 days left
EMD
3.10 Crore
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bhopal → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Package-2: Design, Engineering, Supply, Erection, Testing & Commissioning Of Hydro-Mechanical Works For 640 Mw Isp-Osp Pumped Storage Project.
BOQ
| Sl. No. | Item Description |
| 1 | Upper Level Intake Gates & Rope Drum Hoists |
| 2 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 3 | 1st and 2nd Stage Embedded parts for 1.1 complete in all respects in accordance with the specification and drawing. |
| 4 | Rope drum hoist including control equipment for 1.1 complete in all respect in accordance with the specification and drawing. |
| 5 | Hoist supporting structures and trestles for 1.1 complete in all respect in accordance with the specification & drawing. |
| 6 | Mandatory spare parts - As per Particular Technical Specification |
| 7 | Upper level Intake Bulkhead Gates & Gantry Crane |
| 8 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 9 | 1st and 2nd Stage Embedded parts for 2.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 10 | Gantry Crane including control equipment and Rails and fixtures for 2.1 complete in all respect in accordance with specification and drawing. |
| 11 | Mandatory spare parts - As per Particular Technical Specification |
| 12 | Upper level Intake Trash Racks |
| 13 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 14 | First stage embedded parts for 3.1 complete in all respect in accordance with specification and drawing. |
| 15 | Second stage embedded parts including guides and bottom base etc. for 3.1 complete in all respect in accordance with specification and drawing. |
| 16 | Pressure Shaft/ Penstock Steel Liner |
| 17 | Steel transition at D/s of upper level intake gate including matching piece complete in all respect in accordance with specification and drawing. |
| 18 | 6.0m dia. circular steel liner of upper horizontal portion complete in all respect in accordance with specification and drawing |
| 19 | 6.0m dia. circular steel liner of upper vertical bend (UVB) complete in all respect in accordance with specification and drawing |
| 20 | 6.0m dia. circular steel liner of inclined pressure shaft complete in all respect in accordance with specification and drawing |
| 21 | 6.0m dia. circular steel liner lower vertical Bend (LVB) and lower horizontal bend (LHB) complete in all respect in accordance with specification and drawing |
| 22 | 6.0m dia. circular steel liner of lower horizontal portion complete in all respect in accordance with specification and drawing |
| 23 | Anchor rings/ Thrust rings at suitable locations on the u/s of MIV/ Turbine complete in all respect in accordance with specification and drawing |
| 24 | 6.0m dia. circular steel liner (extra/ matching piece) of length 600mm. |
| 25 | A manhole of 800mm dia. at suitable location at lower erection gallery. |
| 26 | Spare circular steel liner 6.0m dia. of one ferrule each of all thickness values. |
| 27 | Lower Level Intake Gates & Rope Drum Hoists |
| 28 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 29 | 1st and 2nd stage embedded parts for 5.1 complete in all respects in accordance with the specification and drawing. |
| 30 | Rope drum hoist including control equipment for 5.1 complete in all respect in accordance with the specification and drawing. |
| 31 | Hoist supporting structures and trestles for 5.1 complete in all respect in accordance with the specification & drawing. |
| 32 | Mandatory spare parts - As per Particular Technical Specification |
| 33 | Lower level Intake Bulkhead Gates & Gantry Cranes |
| 34 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 35 | 1st and 2nd stage embedded parts for 6.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 36 | Gantry Crane including control equipment and Rails and fixtures for 6.1 complete in all respect in accordance with specification and drawing. |
| 37 | Mandatory spare parts - As per Particular Technical Specification |
| 38 | Lower level Intake Trash Racks |
| 39 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 40 | First stage embedded parts for 7.1 complete in all respect in accordance with specification and drawing. |
| 41 | Second stage embedded parts including guides and bottom base etc. for 7.1 complete in all respect in accordance with specification and drawing. |
| 42 | Instrumentation and Main Distribution Board |
| 43 | A) Instrumentation as described in GTS/ PTS.B) Main distribution board for Upper & Lower-level Intake sites |
| 44 | Mandatory spare parts - As per Particular Technical Specification |
| 45 | Diesel Generator Set |
| 46 | Diesel generator set (250 kVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels etc. |
| 47 | Mandatory spare parts - As per Particular Technical Specification |
| 48 | Mandatory Tools & Tackles required for maintenance, assembly and disassembly As per Particular Technical Specification |
| 49 | Upper Level Intake Gates & Rope Drum Hoists |
| 50 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 51 | 1st and 2nd Stage Embedded parts for 1.1 complete in all respects in accordance with the specification and drawing. |
| 52 | Rope drum hoist including control equipment for 1.1 complete in all respect in accordance with the specification and drawing. |
| 53 | Hoist supporting structures and trestles for 1.1 complete in all respect in accordance with the specification & drawing. |
| 54 | Mandatory spare parts - As per Particular Technical Specification |
| 55 | Upper level Intake Bulkhead Gates & Gantry Crane |
| 56 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 57 | 1st and 2nd Stage Embedded parts for 2.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 58 | Gantry Crane including control equipment and Rails and fixtures for 2.1 complete in all respect in accordance with specification and drawing. |
| 59 | Mandatory spare parts - As per Particular Technical Specification |
| 60 | Upper level Intake Trash Racks |
| 61 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 62 | First stage embedded parts for 3.1 complete in all respect in accordance with specification and drawing. |
| 63 | Second stage embedded parts including guides and bottom base etc. for 3.1 complete in all respect in accordance with specification and drawing. |
| 64 | Pressure Shaft/ Penstock Steel Liner |
| 65 | Steel transition at D/s of upper level intake gate including matching piece complete in all respect in accordance with specification and drawing. |
| 66 | 6.0m dia. circular steel liner of upper horizontal portion complete in all respect in accordance with specification and drawing |
| 67 | 6.0m dia. circular steel liner of upper vertical bend (UVB) complete in all respect in accordance with specification and drawing |
| 68 | 6.0m dia. circular steel liner of inclined pressure shaft complete in all respect in accordance with specification and drawing |
| 69 | 6.0m dia. circular steel liner lower vertical Bend (LVB) and lower horizontal bend (LHB) complete in all respect in accordance with specification and drawing |
| 70 | 6.0m dia. circular steel liner of lower horizontal portion complete in all respect in accordance with specification and drawing |
| 71 | Anchor rings/ Thrust rings at suitable locations on the u/s of MIV/ Turbine complete in all respect in accordance with specification and drawing |
| 72 | 6.0m dia. circular steel liner (extra/ matching piece) of length 600mm. |
| 73 | A manhole of 800mm dia. at suitable location at lower erection gallery. |
| 74 | Spare circular steel liner 6.0m dia. of one ferrule each of all thickness values. |
| 75 | Lower Level Intake Gates & Rope Drum Hoists |
| 76 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 77 | 1st and 2nd stage embedded parts for 5.1 complete in all respects in accordance with the specification and drawing. |
| 78 | Rope drum hoist including control equipment for 5.1 complete in all respect in accordance with the specification and drawing. |
| 79 | Hoist supporting structures and trestles for 5.1 complete in all respect in accordance with the specification & drawing. |
| 80 | Mandatory spare parts - As per Particular Technical Specification |
| 81 | Lower level Intake Bulkhead Gates & Gantry Cranes |
| 82 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 83 | 1st and 2nd stage embedded parts for 6.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 84 | Gantry Crane including control equipment and Rails and fixtures for 6.1 complete in all respect in accordance with specification and drawing. |
| 85 | Mandatory spare parts - As per Particular Technical Specification |
| 86 | Lower level Intake Trash Racks |
| 87 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 88 | First stage embedded parts for 7.1 complete in all respect in accordance with specification and drawing. |
| 89 | Second stage embedded parts including guides and bottom base etc. for 7.1 complete in all respect in accordance with specification and drawing. |
| 90 | Instrumentation and Main Distribution Board |
| 91 | A) Instrumentation as described in GTS/ PTS.B) Main distribution board for Upper & Lower-level Intake sites |
| 92 | Mandatory spare parts - As per Particular Technical Specification |
| 93 | Diesel Generator Set |
| 94 | Diesel generator set (250 kVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels etc. |
| 95 | Mandatory spare parts - As per Particular Technical Specification |
| 96 | Mandatory Tools & Tackles required for maintenance, assembly and disassembly As per Particular Technical Specification |
| 97 | Upper Level Intake Gates & Rope Drum Hoists |
| 98 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 99 | 1st and 2nd Stage Embedded parts for 1.1 complete in all respects in accordance with the specification and drawing. |
| 100 | Rope drum hoist including control equipment for 1.1 complete in all respect in accordance with the specification and drawing. |
| 101 | Hoist supporting structures and trestles for 1.1 complete in all respect in accordance with the specification & drawing. |
| 102 | Upper level Intake Bulkhead Gates & Gantry Crane |
| 103 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 104 | 1st and 2nd Stage Embedded parts for 2.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 105 | Gantry Crane including control equipment and Rails and fixtures for 2.1 complete in all respect in accordance with specification and drawing. |
| 106 | Upper level Intake Trash Racks |
| 107 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 108 | First stage embedded parts for 3.1 complete in all respect in accordance with specification and drawing. |
| 109 | Second stage embedded parts including guides and bottom base etc. for 3.1 complete in all respect in accordance with specification and drawing. |
| 110 | Pressure Shaft/ Penstock Steel Liner |
| 111 | Steel transition at D/s of upper level intake gate including matching piece complete in all respect in accordance with specification and drawing. |
| 112 | 6.0m dia. circular steel liner of upper horizontal portion complete in all respect in accordance with specification and drawing |
| 113 | 6.0m dia. circular steel liner of upper vertical bend (UVB) complete in all respect in accordance with specification and drawing |
| 114 | 6.0m dia. circular steel liner of inclined pressure shaft complete in all respect in accordance with specification and drawing |
| 115 | 6.0m dia. circular steel liner lower vertical Bend (LVB) and lower horizontal bend (LHB) complete in all respect in accordance with specification and drawing |
| 116 | 6.0m dia. circular steel liner of lower horizontal portion complete in all respect in accordance with specification and drawing |
| 117 | Anchor rings/ Thrust rings at suitable locations on the u/s of MIV/ Turbine complete in all respect in accordance with specification and drawing |
| 118 | 6.0m dia. circular steel liner (extra/ matching piece) of length 600mm. |
| 119 | A manhole of 800mm dia. at suitable location at lower erection gallery. |
| 120 | Spare circular steel liner 6.0m dia. of one ferrule each of all thickness values. |
| 121 | Lower Level Intake Gates & Rope Drum Hoists |
| 122 | Intake gate (Fixed wheel type) complete in all respect in accordance with specification and drawing. |
| 123 | 1st and 2nd stage embedded parts for 5.1 complete in all respects in accordance with the specification and drawing. |
| 124 | Rope drum hoist including control equipment for 5.1 complete in all respect in accordance with the specification and drawing. |
| 125 | Hoist supporting structures and trestles for 5.1 complete in all respect in accordance with the specification & drawing. |
| 126 | Lower level Intake Bulkhead Gates & Gantry Cranes |
| 127 | Intake bulkhead gate (Slide type) complete in all respect in accordance with the specification & drawing. |
| 128 | 1st and 2nd stage embedded parts for 6.1 including air vent pipe (300mm dia.) complete in all respect in accordance with the specification & drawing. |
| 129 | Gantry Crane including control equipment and Rails and fixtures for 6.1 complete in all respect in accordance with specification and drawing. |
| 130 | Lower level Intake Trash Racks |
| 131 | Trash racks to completely cover the intake openings comprising suitable no. of trash rack panels complete in all respect in accordance with specification and drawing. |
| 132 | First stage embedded parts for 7.1 complete in all respect in accordance with specification and drawing. |
| 133 | Second stage embedded parts including guides and bottom base etc. for 7.1 complete in all respect in accordance with specification and drawing. |
| 134 | Instrumentation and Main Distribution Board |
| 135 | A) Instrumentation as described in GTS/ PTS.B) Main distribution board for Upper & Lower-level Intake sites |
| 136 | Diesel Generator Set |
| 137 | Diesel generator set (250 kVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels etc. |
| 138 | SUB TOTAL FOR PRICE SCHEDULE-1 |
| 139 | SUB TOTAL FOR PRICE SCHEDULE-2 |
| 140 | SUB TOTAL FOR PRICE SCHEDULE-3 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 37 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.