Tender For Design And Build Containment Facility For Grapes - Cpc 1, Pune
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Dec 2026
38 days left
EMD
38 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Design And Build Containment Facility For Grapes - Cpc 1, Pune
BOQ
| Sl. No. | Item Description |
| 1 | Design and Build containment facility for grapes – CPC 1, Pune |
| 2 | Design and Build of the containment facility for grapes – CPC 1 — comprising the construction and development of the containment facility. The project scope includes execution of Electrical Works, Plumbing Works and HVAC Systems along with all necessary support services and allied facilities. The project shall be executed in accordance with DBR/Specifications and Guidelines, relevant Indian Standard (IS) Codes, and as approved by ADB/NHB/ICAR/MoAFW and as per the directions of the Principal Scientist (Plant Pathology). The scope also includes complete handing over of the facility and comprehensive Operation & Maintenance for a period of five (5) years, ensuring all works are completed in all respects. (The project cost will be 85 % for design and build of the facility and 15% for the Operation and Maintenance of Services - Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years, including comprehensive warranty on the equipment, for the containment facility which will run concurrently with DLP of 12 Months). (For implementation of site-specific EHSMP and EMoP at least 1.5 % of the total scope of works/quoted price shall be allotted for EHSMP and EMoP) (A Provisional Sum (PS) of NR 1,50,00,000 or INR 1.5 crore will be added as a separate item over and above of the quoted amount while awarding the contract agreement for miscellaneous expenses. This PS will not be part of the stages of payment). |
| 3 | EHS Management Plan and Environmental Monitoring |
| 4 | Preparation of EHS Management Plan (EMP)Preparation, submission, approval, and implementation of Contractor’s Environmental, Health and Safety (EHS) Management Plan in accordance with contract requirements, including site-specific Environmental Management Plan (EMP), method statements, risk assessments, emergency response procedures, and EHS Code of Conduct; including deployment of qualified EHS personnel, monitoring, reporting, and compliance with statutory and ADB Safeguard Policy requirements.The rate shall include all costs for preparation, approvals, implementation, periodic updates, staff, training, documentation, and reporting throughout the contract period. |
| 5 | Environmental Monitoring Plan ImplementationImplementation of Environmental Monitoring Plan including baseline and periodic monitoring of environmental parameters (air, water, noise, waste, etc.) as specified in the contract; provision of monitoring equipment, sampling, laboratory testing, documentation, and submission of monitoring reports in formats acceptable to the Engineer and Employer. |
| 6 | Occupational Health and Safety (OHS) ComplianceProvision and maintenance of Occupational Health and Safety measures including supply of personal protective equipment (PPE), site safety arrangements, worker welfare facilities, safety signage, toolbox talks, training programs, incident reporting, and compliance with applicable labor and safety regulations and contract EHS provisions. |
| 7 | Deployment of EHS PersonnelDeployment of qualified Environmental, Health and Safety (EHS) Officer(s) at site for the entire duration of the works, including supervision of EHS compliance, coordination with Engineer, reporting, audits, and corrective actions as per contract requirements. |
| 8 | Waste Management and DisposalCollection, segregation, transportation, and disposal of construction and hazardous waste in accordance with approved Waste Management Plan, statutory regulations, and contract provisions; including documentation and disposal certificates. |
| 9 | Site Restoration and Environmental Safeguards ComplianceFinal site cleanup, restoration, and compliance with environmental safeguard requirements including removal of temporary facilities, disposal of residual waste, reinstatement of disturbed areas, and submission of completion reports. Summary of Costs Name of Work: Design and Build containment facility for grapes – CPC 1, Pune Description Amount in INR Total (including Goods and Service Tax) without Provisional sum 0.0 Provisional Sums 15000000.0 Grand Total (including Goods and Service Tax) with Provisional sum in figures 15000000.0 Grand Total (including Goods and Service Tax) with Provisional sum in words Fifteen Million & point Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 38 daysDec 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 38 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender