Tender For Two Years Annual Rate Contract For Ofc Restoration In The Row Under Phbmpl Haldia, Phbpl Haldia And Phbpl Bolpur Into 3 Groups -Group A- Phbmpl Haldia
Tender Overview
Project Description
Tender for Two Years Annual Rate Contract For Ofc Restoration In The Row Under Phbmpl Haldia, Phbpl Haldia And Phbpl Bolpur Into 3 Groups -Group A- Phbmpl Haldia
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Nov-2026 | Due date extension | Date | 13-Nov-2026 |
| 2 | 16-Nov-2026 | Corrigendum and Due date extension | Date | 23-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | Group A_Under PHBMPL-Haldia Jurisdiction |
| 3 | Supply Items |
| 4 | Supply of 24 Fibre Single Mode Composite |
| 5 | Supply of 40 mm OD HDPE pipe |
| 6 | Supply of OFC Jointing kits |
| 7 | Supply of pre-fabricated RCC (1:1.5:3) B |
| 8 | Supply of full range (upto 8 feet) RF iD |
| 9 | Supply of patch of 5M as per direction o |
| 10 | Supply of patch of 20M as per direction |
| 11 | Supply of wall mounted Fibre Termination |
| 12 | Supply of Joint pit markers for OFC join |
| 13 | Supply of pig Tail |
| 14 | Service Items |
| 15 | Laying of HDPE pipe (excluding blowing o |
| 16 | Installation of jointing kit as per draw |
| 17 | Blowing of OFC through laid HDPE, post i |
| 18 | Installation of pre-fabricated RCC (1:1. |
| 19 | Installation of RF iD type Electronic Ma |
| 20 | Boring / Tunnelling / HDD on normal Pipe |
| 21 | Installation of OFC Joint pit markers at |
| 22 | Installation of wall mounted Fibre Termi |
| 23 | Hop testing, end to end testing, trial r |
| 24 | CABLE TRENCH: Excavation in unpaved area |
| 25 | Locating OFC fault site with OTDR and id |
| 26 | Preparation of cable and splicing using |
| 27 | Testing of OFC after splicing of Fibre c |
| 28 | Opening of existing joint pit (6 / 12 / Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
TodayBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender