Tender For Establishment Of Closure With Barbed Wire Fencing Using Wooden Posts With 4 Strand And 2 Criss Cross Ba/Bw In Earthen Pirts & Cement Concrete Block Every 10Th Post, Planting Of Polybag Raised Conifer Saplings/ Medicinal & Naked Root Saplin
Tender Overview
Project Description
Tender for Establishment Of Closure With Barbed Wire Fencing Using Wooden Posts With 4 Strand And 2 Criss Cross Ba/Bw In Earthen Pirts & Cement Concrete Block Every 10Th Post, Planting Of Polybag Raised Conifer Saplings/ Medicinal & Naked Root Saplings Of Fruit/Fodder Species In Staggered Pits , Sowing, Dibbling And Grass Slips & Drsm Work In Comptt. 29/D ,Forest Range Dachhan Of Marwah Forest Division, Under Bdmp Scheme For The Year 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Providing & fixing of Barbed wire fencing with wooden Posts (minimum height = 6' & minimum mid-girth = 14'') with 4 Strand & 2 Criss-Cross BABW in Earthen Pits & Cement Concrete Block for every 10TH Post and various works as per the detailed estimate.Note: i) Wooden fence posts shall be extracted and prepared in personal supervision of concerned BO (to be cross verified by RFO) . ii) The contractor shall be solely responsible for the conversion and all other operations required for the extraction and preparation of wooden fence posts duly fashioned of the prescribed dimensions. The contractor shall also be responsible for the collection and removal of lops, tops and timber lying within a radius of 3 km from the closure establishment site for extraction and transportation of wooden fence posts, as part of the work, without any additional financial liability to the Department.If any unauthorized felling of un-enumerated trees is found, action under Sec. 26 of Indian Forest Act, 1927 would be initiated. The Black Annealed Barbed wire with standard specification conforming to product code BA-BW, allied materials like “U” nails etc. and its mechanical carriage including loading, unloading and stacking charges will be managed/procured himself by the contractor. iii) A proper testing certificate with regard to the material i.e Barbed Wire etc. has to be produced by the contractor before the execution of work. A proper Measurement Book of the work has to be prepared against which work done payment is to be made to the contractor. |
| 2 | Planting of Poly raised Conifer saplings/ Medicinal plants along the contours as well as on the flat surface in Staggered pitss of size 45cm x 45cm x 45cm within the available blanks including carriage/lifting of plants from different nurseries of Marwah Forest Division by mechanical transport within a maximum lead of 100 Kms and headload carriage including loading and unloading upto site of work with all operations. (Note: Plant material shall be supplied departmentally) |
| 3 | Planting of Naked root saplings of Fruit/Fodder species along the contours as well as on the flat surface in Staggered pits of size 45cm x 45cm x 45cm within the available blanks including carriage/lifting of plants from different nurseries of Marwah Forest Division by mechanical transport within a maximum lead of 100 Kms and headload carriage including loading and unloading upto site of work with all operations. (Note: Plant material shall be supplied departmentally) |
| 4 | Afforestation works by means of Patch sowing of conifer seeds @ 30 seeds/Patch in 45cm × 45cm × 15cm patches including cost and carriage of seeds. |
| 5 | Afforestation works by means of Dibbling of Aesculeus, Walnut & Oak seeds including cost and carriage of seeds |
| 6 | Afforestation works by means of Augmentation of grass slips |
| 7 | DRSM work- Excavation of foundation for DRSM Structures.Collection of stones from different sites and their dumping .Carriage of stones from dumping site to work site through head load.Fashioning and dressing of stones using hammers.Construction of structures along the gullies /sliding zones.Numbering of structures by using paint propoerly complete in all respect.(Rates as per Forest Schedule Rate 2017) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender