Power Boards / Undertakings / PSU Closing in 7 days TDR #58148774

Tender For Works Contract For Proposed New 4 Nos. Of 11Kv Link Lines For 110/11Kv Surya Nagar Ss

Issued by Boards / Undertakings / PSU · Madurai, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Nov 2026
7 days left
EMD
17800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Madurai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Works Contract For Proposed New 4 Nos. Of 11Kv Link Lines For 110/11Kv Surya Nagar Ss

BOQ

Name of Work:-
Sl. No. Item Description
1Work Items :
2Labour Charges for Loading of Square Pole
3Labour Charges for Unloading of Square Pole
4Labour Charges for Transporting of Square Pole (Up to 8KM )
5Labour Charges for Excavation of Square Pole
6Labour Charges for Erection of Square Pole
7Erection of 11KV HG Fuse complete used for Single pole structure
8Labour Charges for Erection of 11 KV, 200 Amps, single break GOS
9Fixing of HT jumpering and earthing
10Erection of Earth pipes and Structure earthing including material cost of earth troughs
11Labour Charges for Mass concrete for Structure pole Size of 0.6 Mx0.60 Mx1.25
12Snowsem paint for transformer structure two nos. poles and cut stone for 2 coats Painting materials supplied by the Contractor
13Labour Charges for Transporting of materials including Loading & Unloading
14Labour Charges for Loading of above 9.14 mtr poles- all metal poles
15Labour Charges for Unloading of above 9.14 mtr poles- all metal poles
16Labour Charges for Transporting ofabove 9.14 mtr poles- all metal poles
17Labour Charges for Excavation of above 9.14 mtr poles- all metal poles
18Labour Charges for Erection of above 9.14 mtr poles- all metal poles
19Labour Charges for Loading of 9.00 Mtr PSC poles
20Labour Charges for Unloading of 9.00 Mtr PSC poles
21Labour Charges for Transporting of 9.00 Mtr PSC poles
22Labour Charges for Excavation of 9.00 Mtr PSC poles
23Labour Charges for Erection of 9.00 Mtr PSC poles
24Labour Charges for Loading of 8.00 Mtr PSC poles
25Labour Charges for Unloading of 8.00 Mtr PSC poles
26Labour Charges for Transporting of 8.00 Mtr PSC poles
27Labour Charges for Excavation of 8.00 Mtr PSC poles
28Labour Charges for Erection of 8.00 Mtr PSC poles
29Labour Charges for Erection of LT Single Phase X Arm / HT TI Fitting / LT TI Fitting
30Labour Charges for Erection of LT 3Q X Arm
31Labour Charges for Erection of Tapping Chanel Guarding Cross Arm
32Labour Charges for Fixing of 3' - 6\\" \\"V\\" Cross Arm [Pin Point ]
33Labour Charges for Erection of 11KV Polymer Disc
34Labour Charges for Erection of 11KV Polymer Pin Insulator
35Labour Charges for Erection of LT Shackle
36Labour Charges for Erection of Pin Insulator
37Labour Charges for Erection of Alu. Knop
38Labour charge for excavation of stay pit Size 0.86 M3 for stay
39Labour charge for Erection of stay set complete incuding of refilling
40Sleeve Concreting for Pole
41Labour Charges for Earthing of PSC Pole
42Punching of Holes
43Erection of Street light fitting with 3*CFL/LED/Others
44Paving & Stringing 7/4.09mm ACSR (Span Length Below than 30Mtr)(Per Span per wire Locations)
45Paving & Stringing 7/4.09mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations)
46Reusing of 7/3.15mm ACSR (Span Length Below than 30Mtr) (Per Span per wire Locations)
47Reusing of 7/3.15mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations)
48Reusing of 7/2.59mm ACSR (Span Length Below than 30Mtr) (Per Span per wire Locations)
49Reusing of 7/2.59mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations)
50Dismantling of 9.0 M PSC Pole
51Dismantling of 8.0 M PSC Pole
52Dismantling of 3' - 6\\" \\"V\\" Cross Arm
53Dismantling of HT TI Fitting
54Dismantling of Tapping Chanel / Guarding Cross Arm
55Dismantling of LT 3Q X Arm
56Dismantling of LT 1Q X Arm
57Dismantling of 11KV Polymer Disc
58Dismantling of 11KV Pin Insulator
59Dismantling of LT Pin Insulator
60Dismantling of LT Shackle
61Tree Clearance of Various Location
62Dismantling and re Erection of 1 phase service connection wire
63Dismantling and re Erection of 3 phase service connection wire
64Laying of 11KV 3 X 300 sq mm XLPE cable
65Labour charges for erection of heat shrinkable type transition kit for 11KV 3x300sq.mm (Outdoor) End Termination Kit
66V Trough (Cement Cover) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58148774
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 04-11-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Works Contract For Proposed New 4 Nos. Of 11Kv Link Lines For 110/11Kv Surya Nagar Ss
Basic Detail
Tender No 12/26-27
Bidding Type Tender
Location
City Madurai
State Tamil Nadu
Key Dates
Publish Date 21 Oct 2026
Submission Date 04 Nov 2026
Open Date 05 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 17800
Exemption Available
Document List
1637ce8a-df70-4527-bd80-e25947e07c53.html
BOQ_860394.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Nov 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

1637ce8a-df70-4527-bd80-e25947e07c53.html

xls

BOQ_860394.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender