Tender For Works Contract For Proposed New 4 Nos. Of 11Kv Link Lines For 110/11Kv Surya Nagar Ss
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Nov 2026
7 days left
EMD
17800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Madurai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Works Contract For Proposed New 4 Nos. Of 11Kv Link Lines For 110/11Kv Surya Nagar Ss
BOQ
| Sl. No. | Item Description |
| 1 | Work Items : |
| 2 | Labour Charges for Loading of Square Pole |
| 3 | Labour Charges for Unloading of Square Pole |
| 4 | Labour Charges for Transporting of Square Pole (Up to 8KM ) |
| 5 | Labour Charges for Excavation of Square Pole |
| 6 | Labour Charges for Erection of Square Pole |
| 7 | Erection of 11KV HG Fuse complete used for Single pole structure |
| 8 | Labour Charges for Erection of 11 KV, 200 Amps, single break GOS |
| 9 | Fixing of HT jumpering and earthing |
| 10 | Erection of Earth pipes and Structure earthing including material cost of earth troughs |
| 11 | Labour Charges for Mass concrete for Structure pole Size of 0.6 Mx0.60 Mx1.25 |
| 12 | Snowsem paint for transformer structure two nos. poles and cut stone for 2 coats Painting materials supplied by the Contractor |
| 13 | Labour Charges for Transporting of materials including Loading & Unloading |
| 14 | Labour Charges for Loading of above 9.14 mtr poles- all metal poles |
| 15 | Labour Charges for Unloading of above 9.14 mtr poles- all metal poles |
| 16 | Labour Charges for Transporting ofabove 9.14 mtr poles- all metal poles |
| 17 | Labour Charges for Excavation of above 9.14 mtr poles- all metal poles |
| 18 | Labour Charges for Erection of above 9.14 mtr poles- all metal poles |
| 19 | Labour Charges for Loading of 9.00 Mtr PSC poles |
| 20 | Labour Charges for Unloading of 9.00 Mtr PSC poles |
| 21 | Labour Charges for Transporting of 9.00 Mtr PSC poles |
| 22 | Labour Charges for Excavation of 9.00 Mtr PSC poles |
| 23 | Labour Charges for Erection of 9.00 Mtr PSC poles |
| 24 | Labour Charges for Loading of 8.00 Mtr PSC poles |
| 25 | Labour Charges for Unloading of 8.00 Mtr PSC poles |
| 26 | Labour Charges for Transporting of 8.00 Mtr PSC poles |
| 27 | Labour Charges for Excavation of 8.00 Mtr PSC poles |
| 28 | Labour Charges for Erection of 8.00 Mtr PSC poles |
| 29 | Labour Charges for Erection of LT Single Phase X Arm / HT TI Fitting / LT TI Fitting |
| 30 | Labour Charges for Erection of LT 3Q X Arm |
| 31 | Labour Charges for Erection of Tapping Chanel Guarding Cross Arm |
| 32 | Labour Charges for Fixing of 3' - 6\\" \\"V\\" Cross Arm [Pin Point ] |
| 33 | Labour Charges for Erection of 11KV Polymer Disc |
| 34 | Labour Charges for Erection of 11KV Polymer Pin Insulator |
| 35 | Labour Charges for Erection of LT Shackle |
| 36 | Labour Charges for Erection of Pin Insulator |
| 37 | Labour Charges for Erection of Alu. Knop |
| 38 | Labour charge for excavation of stay pit Size 0.86 M3 for stay |
| 39 | Labour charge for Erection of stay set complete incuding of refilling |
| 40 | Sleeve Concreting for Pole |
| 41 | Labour Charges for Earthing of PSC Pole |
| 42 | Punching of Holes |
| 43 | Erection of Street light fitting with 3*CFL/LED/Others |
| 44 | Paving & Stringing 7/4.09mm ACSR (Span Length Below than 30Mtr)(Per Span per wire Locations) |
| 45 | Paving & Stringing 7/4.09mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations) |
| 46 | Reusing of 7/3.15mm ACSR (Span Length Below than 30Mtr) (Per Span per wire Locations) |
| 47 | Reusing of 7/3.15mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations) |
| 48 | Reusing of 7/2.59mm ACSR (Span Length Below than 30Mtr) (Per Span per wire Locations) |
| 49 | Reusing of 7/2.59mm ACSR (Span Length Above than 30Mtr) (Per Span per wire Locations) |
| 50 | Dismantling of 9.0 M PSC Pole |
| 51 | Dismantling of 8.0 M PSC Pole |
| 52 | Dismantling of 3' - 6\\" \\"V\\" Cross Arm |
| 53 | Dismantling of HT TI Fitting |
| 54 | Dismantling of Tapping Chanel / Guarding Cross Arm |
| 55 | Dismantling of LT 3Q X Arm |
| 56 | Dismantling of LT 1Q X Arm |
| 57 | Dismantling of 11KV Polymer Disc |
| 58 | Dismantling of 11KV Pin Insulator |
| 59 | Dismantling of LT Pin Insulator |
| 60 | Dismantling of LT Shackle |
| 61 | Tree Clearance of Various Location |
| 62 | Dismantling and re Erection of 1 phase service connection wire |
| 63 | Dismantling and re Erection of 3 phase service connection wire |
| 64 | Laying of 11KV 3 X 300 sq mm XLPE cable |
| 65 | Labour charges for erection of heat shrinkable type transition kit for 11KV 3x300sq.mm (Outdoor) End Termination Kit |
| 66 | V Trough (Cement Cover) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 04, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysNov 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.