Auction Sale Of Released Material From Quarter- (A)Mzr- Rbi 133 A-G (7 Nos) Rbi 131 A-G (7 Nos) Rbi 119 A-G (7 Nos) Map 111 A-D (4 Nos) Rbii 134 A-D (4 Nos) Rb-Ii 135A, (1 Nos) Total (A) (30Nos) (B)Bgn- Map10 A-D (4 Nos) Rbi 13 A-F, (6 Nos) Rbi 12 Ab
Tender Overview
Project Description
Auction Sale Of Released Material From Quarter- (A)Mzr- Rbi 133 A-G (7 Nos) Rbi 131 A-G (7 Nos) Rbi 119 A-G (7 Nos) Map 111 A-D (4 Nos) Rbii 134 A-D (4 Nos) Rb-Ii 135A, (1 Nos) Total (A) (30Nos) (B)Bgn- Map10 A-D (4 Nos) Rbi 13 A-F, (6 Nos) Rbi 12 Ab (2 Nos) Total(B) ( 12Nos) Total (A+B)= 42 Quarters. Abandoned Material Details-Asbestos Cement Sheet ,F.P.S Bricks Class Designation 10.0 ,Mildsteel Round Bar 12 Mmdia And Below ,Second Class Kall Wood In Scantling ,Structural Steel Such As Tees, Angles Channels And R.S. Joists And All Like Materials Remark-27.Before Commencing Dismantling, The Purchaser Must Obtain Written Permission From The Controlling Officer Through The Concerned Custodian/Sse, Along With Approval Of Detailed Work Execution Plan.28.The Purchaser Must Submit A Complete List Of All Personnel Proposed To Work On Site, Along With Valid Photo Identification And Required Skill Certifications. Railway Officials Reserve The Right To Verify And, If Necessary, Deny Entry To Any Individual For Safety Or Security Reasons.29.The Purchaser Shall Indemnify The Railway Unconditionally Against All Liabilities, Claims, Losses, Damages, Penalties, Or Costs Arising From The Dismantling Operations, Including Personal Injury, Death, Or Property Damage.30.The Structure Shall Be Electrically Isolated (De-Energized), And A ?Safety Certificate For Work? To Be Issued By The Concerned Railway Electrical Department Before Commencing The Dismantling Work.31.A Minimum Clearance Distance, As Specified By The Railway Engineering Department, Must Be Maintained Between The Dismantling Site And The Nearest Running Track/Live Electrical Equipment. No Equipment Or Material Should Infringe Upon The Prescribed Schedule Of Dimensions.32.Quantity Is Calculated On Approximation Basis. Bidder Is Advised To Visit The Lot Before Bidding.33.Delivery Will Be Given Under Surveillance Of Body Worn Camera.Note-All The Material Calculation Done For Above Ground Level Structure Only.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender