Tender For Construction & Upgradation Of Rural Roads/Cds/Bridges Under Pmgsy.
Tender Value
5.72 Crore
Estimated cost
Bid Submission
05 Nov 2026
7 days left
EMD
5.72 Lakhs
Bank guarantee accepted
Document Fee
23600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sagar → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction & Upgradation Of Rural Roads/Cds/Bridges Under Pmgsy.
BOQ
| Sl. No. | Item Description |
| 1 | Road/Bridge Work |
| 2 | Construction of Submersible Bridge Across Local Nala on T-05 to Kanera to Gond Road at ch. 1200m and Construction of Submersible Bridge Across Local Nala on ODR to Sagaunee Puraina Road at ch. 2200m Package No.MP33 RBR 002 and Construction of Submersible Bridge Across Natural Stream on ODR to Sagaunee puraina Road at ch.1800m Under Package No.MP33 RBR 011 (Offer Based on SSR issued by MP PWD Bridge & Road work Effective from 11.04.2025 ) as per detailed BOQ attached in Annex-II A. Please Enable Macros to View BoQ information MPRRDA,PIU-1 Sagar Annex-II A Bill of Quantity Details for the Percentage(%) Rate Tender Based on SSR -11.04.2025 (MP PWD Bridge and Road Work) District :- Sagar PIU :- 1 Sagar , Package No. :- MP-33RBR011 Sl. No. Block Name of the Road/Bridge Length in Meter |
| 3 | Jaisinagar |
| 4 | Jaisinagar |
| 5 | Jaisinagar Total Total Bridge Length 119.0 Amount of Construction Cost (in Rs.) 56662000.0 Amount of Mantenance Cost (in Rs.) 567000.0 Total Amount of PAC (in Rs.) 57229000.0 Sl. No. SOR .no. Description of item Unit Quantity Rate Amount Q-1 Q-2 Q-3 |
| 6 | 2.2 A |
| 7 | 2.3 B (i) |
| 8 | 2.3 (ii) B |
| 9 | 2.3 (ix) |
| 10 | 4.1 A |
| 11 | 4.3 A |
| 12 | 4.16 A |
| 13 | 5.1(i) |
| 14 | 5.3(ii) |
| 15 | 5.5(b)(ii) |
| 16 | 5.9(i) |
| 17 | 5.11(ii) |
| 18 | 8.3 (iv) 60 cm eqilateral triangle Each 20.0 3717.0 74340.0 6.0 22302.0 (iv) 3717.0 6.0 12.0 22302.0 8.0 29736.0 viii) 60 cm circular Each 12.0 4078.0 48936.0 4.0 16312.0 viii) 4078.0 4.0 8.0 16312.0 4.0 16312.0 (ix) 80 cm x 75 cm rectangular Each 6.0 6689.0 40134.0 2.0 13378.0 (ix) 6689.0 2.0 4.0 13378.0 2.0 13378.0 |
| 19 | 12.1 I (i) |
| 20 | 12.1 I (ii) |
| 21 | 12.1 I (iii) |
| 22 | 12.1 II (i) |
| 23 | 12.1 (IV) |
| 24 | GeneralNotes No.16 |
| 25 | 12.2 a)up to 3m depth cum 2758.63 39.5 108965.89 451.02 17815.29 39.5 787.87 1238.89 31120.865 1519.74 60029.73 b)beyond 3m to 6m depth Ordinary rock (not requiring blasting) cum 67.08 119.5 8016.06 67.08 8016.06 0.0 0.0 67.08 0.0 0.0 b)3m to 6m depth cum 1384.78 65.25 90356.9 0.0 65.25 503.04 503.04 32823.36 881.74 57533.535 c)3m-6m depth cum 168.86 179.25 30268.16 0.0 0.0 168.86 30268.155 |
| 26 | 12.6 (i) B |
| 27 | 12.6 (i) E |
| 28 | 12.6 (i) (G) |
| 29 | 12.33 |
| 30 | 12.37 |
| 31 | 12.38 |
| 32 | 13.1 (A) |
| 33 | 13.1 (B) |
| 34 | 13.1 (F) (1) |
| 35 | 13.1 (G) 1.0 Height Upto 5 m cum. 568.45 5533.0 3145233.85 137.3 759680.9 1.0 5533.0 223.42 360.72 1236182.86 207.73 1149370.09 2.0 Height 5m to 10 m cum. 332.76 5689.0 1893071.64 43.41 246959.49 2.0 5689.0 112.41 155.82 639500.49 176.94 1006611.66 |
| 36 | 13.8 A |
| 37 | 13.12 |
| 38 | 13.16 |
| 39 | 13.18(A) |
| 40 | 13.18(B) |
| 41 | 14.1 C (i) (2) |
| 42 | 14.4 (ii) |
| 43 | 14.11 |
| 44 | 14.15 |
| 45 | 14.16 |
| 46 | 14.17 |
| 47 | 14.18 |
| 48 | 14.19 |
| 49 | 14.21 |
| 50 | 14.24 (i) |
| 51 | 14.24 (ii) |
| 52 | 14.24 (iii) |
| 53 | 14.24 (iv) |
| 54 | 14.28 |
| 55 | 14.31 |
| 56 | 14.33 |
| 57 | 16.4 A |
| 58 | 16.7 (c) |
| 59 | 16.9 (B) |
| 60 | MPRRDA SOR 2024-10.12 (A) |
| 61 | MPRRDA SOR 2024-10.12 (B) |
| 62 | MPRRDA SOR- 10.13 |
| 63 | MPRRDA SOR 2024-14.10 56661897.47 10801131.24 18726133.955 27044650.86 566.62 Sub Engineer Assistant Manager General Manager MPRRDA PIU-1 SAGAR MPRRDA PIU-1 SAGAR MPRRDA PIU-1 SAGAR 956.55 Note |
| 64 | Deduction for item No.4.3 if sensor paver is not used. |
| 65 | Deduct from Item No.6.1 above if paver finisher with electronic sensor is not used and laying, (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work.) Note:- This item is to be executed with prior written permission from the C.E. |
| 66 | Deduct from Item No.6.3 & 6.4 above if slip form paver with electronic sensor is not used and laying, compaction is done by fix form paver having 60 mm vibratory needle @ 2 Nos. per metre. (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid work.) Note:- This item is to be executed with prior written permission from the C.E. Five Year Routine Maintenance Year Cost in lakhs % Cost I 84993.0 0.0015 II 84993.0 0.0015 III 113324.0 0.002 IV 141655.0 0.0025 V 141655.0 0.0025 Total Maintenance Cost 566620.0 0.01 Sub Engineer Assistant Manager General Manager MPRRDA PIU-1 SAGAR MPRRDA PIU-1 SAGAR MPRRDA PIU-1 SAGAR 956.55 |
AI Tender Summary
Tender Timeline
Oct 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysNov 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender