Tender For Angle Iron Fencing Of 4397 Rft, Pb Plantation 5500 Nos., Nr Plantation 6000 Nos., Patch Sowing 6000 Nos, Dibbling 6000 Nos., Grass Slips 6000 Nos., Bush Clearance In 3 Ha. Area, Fire Line Creation Of 1.00 Km., Inspection Path Of 1 Km & Drs
Tender Overview
Project Description
Tender for Angle Iron Fencing Of 4397 Rft, Pb Plantation 5500 Nos., Nr Plantation 6000 Nos., Patch Sowing 6000 Nos, Dibbling 6000 Nos., Grass Slips 6000 Nos., Bush Clearance In 3 Ha. Area, Fire Line Creation Of 1.00 Km., Inspection Path Of 1 Km & Drsm 104 Cum In Comptt. 13/K In Kishtwar Range Of Kishtwar Forest Division Under C A (Cat Rattle) For The Year 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.Angle Iron 50x50x6mm : |
| 6 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every pole concree, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 5 horizontal lines and 2 diagnol of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire |
| 7 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . (STAIR) |
| 8 | Sign board incl carriage PAINTING &WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet. |
| 9 | Carriage of materials from source to site of work Sand av |
| 10 | Carriage of materials from source to site of work Bajri av |
| 11 | Carriage of Steel av. Distance HL 800 mtr |
| 12 | Carriage of Cement av. Distance HL 800 mtr |
| 13 | Pit Plantation of Poly Bags:- Clearance of site and digging of pits of size 45 cm x 45 cm x 45 cm along surface in staggered contours and flat area. Removal of soil from dug-out pits and stacking near pits. Cleaning the dug-out soil of stones, pebbles, grasses and other unwanted material. Mixing of decomposed humus/manure with cleaned soil. Refilling of dug-out pits with prepared soil. De-wrapping of P.B. raised saplings and disposal of poly bags outside plantation area. Planting of P.B. raised saplings including carriage, loading/unloading from designated nursery to closure site. |
| 14 | Pit plantation of NR Plants:- Clearance of site and digging of pits of size 45cm x 45cm x 45cm in staggered fashion along the contours as well as on flat surface. Extraction / mechanical transportation of Naked root plants from the designated nurseries including loading/unloading/ head carriage upto closure site. Removing of earth roots stones pebble and grasses etc from the dugout soil of the pits and mixing of decomposed humus with the clean soil. Planting of NR plants in pits, refilling of pits with the clean soil mixed with humus and ramming complete. |
| 15 | Patch sowing:- Clearance of site and preparation of patches of size 45cm x 45cm x 15cm by digging and loosening the soil in a staggered fashion along the contours as well as on flat surfaces. Removing of weeds, earth roots, stones, pebbles, and other unwanted material from the dugout patches. Sowing of site specific seeds in the dugout patches including supply of seeds. |
| 16 | Dibbling: Clearance of site and digging of patches of size 45cm x 45cm x 15cm in staggered fashion along the contours as well as on flat surface by manual. Labour. Removing of unwanted staff, weeds and grasses etc. from the dugout patches. Dibbling of site specified seeds in the dugout patches including supply of seeds. |
| 17 | Grass Slips:- Collection and extraction of rooted grass slips from the designated source including leaving, dressing and dandling. Carriage of grass slips from source to work site including loading and unloading with all leads and lifts. Site Clearance layout and preparation of planting spots including light hoeing and Soil working. Planting of rooted grass slips in prepared soil including compacting and watering as required. |
| 18 | Bush Clearance:- Cutting grubbing and removal of Lantana in a year during the active growth period of the weed. This activity should not be restored to unless the area is simultaneously being planted. Simple removal of weeds without providing thick cover by artificial plantation will not serve the purpose. |
| 19 | Fire Line: Construction of fire line, site clearance, cutting of bushes, removing of Old rotten and fallen material, leaf litter and making of ditches along the fire line and dry stone structures down the hill side to prevent rolling of burning logs and disposal of inflammable materials to outside of forest. Complete 01kmx10mtr of fire line. |
| 20 | Inspection Path: Clearance of site, removing of stones, boulders, Logs, from the path. Excavation of Soil 1 Kmtr lenthx1.5 mtr width of inspection path. Construction of retaining walls, Breast Walls in Gullies. Construction of sides/ cross drains. Filling of path by stones and earth. |
| 21 | DRSM: Excavation of foundation for DRSM Structures. Collection of stones from different sites and their dumping .Carriage of stones from dumping site to work site through head load. Fashioning and dressing of stones using hammers. Leveling of Tops and filling of face of structures. Construction of structures along the gullies /sliding zones. Numbering of structures by using paint properly complete in all respect. (Rates as per Forest Schedule Rate 2017. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender