Tender For Construction For Earth Work From Km. 0.700 To Km. 1.050, Pucca Work Of Vrb At Km. 0.805 & 1.040 Of Rorwa Minor. Lot-1
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Oct 2026
3 days left
EMD
67000
Bank guarantee accepted
Document Fee
855
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction For Earth Work From Km. 0.700 To Km. 1.050, Pucca Work Of Vrb At Km. 0.805 & 1.040 Of Rorwa Minor. Lot-1
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.6 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part thereof upto total lead of 30m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. |
| 2 | Excavating soft rock,disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part thereof upto total lead of 30 m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer in Charge . |
| 3 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 4 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts,borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density,material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 5 | Earthwork in filling in canal embankment with borrow area soil used with total lead beyond 1.0 km and upto 2.0 km by truck or tractor trolley including cost of all lifts,borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density,material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. |
| 6 | Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand mixed with Bajari, Kankar or Mooram with initial lead 30m all lift including filling watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches including all leads and lifts, labour charges, T&P etc. and its removal and disposal of surplus earth required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | Providing and laying of coarse sand filling, including cost of all materials, labour, T&P etc required for proper completion of work as per direction of engineer-in -charge. |
| 8 | Laying C.C. 1:2:4(M-15) With cement, coarse sand of FM not less than 2.00 & stone ballast of size 4.75 to 20 mm .including cost of all materials, labours, T&P etc but excluding cost of rienforcement, centerring & shuttering required for proper completion of work. As per direction of Engineer-in-charge |
| 9 | Centering and shuttering for CC work including cost of material, labour, T&P ,fixing & removal etc. required for proper completion of work as per direction of engineer-in -charge. |
| 10 | Centering and Shuttering for R.C.C. work including rent of shuttering material , labour & T&P required for proper completion of work. as par direction of Engineer-in-charge |
| 11 | Random rubble stone masonry in 1:4 cement (OPC 43 grade) and sand mortar including all leads and lifts, cost of all material, labour charges and T&P etc.required for proper completion of work as per direction of Engineer-in-charge. |
| 12 | Laying R.C.C. 1:1.5:3(M-20) With cement, coarse sand of FM not less than 2.00 & stone ballast of size 4.75 to 20 mm .including cost of all materials, labours, T&P etc but excluding cost of rienforcement, centerring & shuttering required for proper completion of work. As per direction of Engineer-in-charge |
| 13 | Cutting, bending, placing and binding of steel reinforcement including cost of all labour, material, T&P, M.S. binding wire for proper completion of work as par direction of Engineer-in-charge |
| 14 | Pointing work (struck, deep or raised) for exposed surface of stone masonry in 1:3 with cement OPC-43 grade, sand mortar including all leads and lift, cost of all material labour charges T&P etc. required for proper completion of work as per direction of Engineer-in-charge.. |
| 15 | Earth work in filling aproach road with borrow area soil used with total lead up to 1.00 km. by truck or tractor trolley . Including cost of all lift, borrowing earth from private land . required for proper complation of work as per direction of engineer in charge. |
| 16 | Providing and fixing of 100 mm dia PVC Pipe in drainage spout & weep hole including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 17 | Earthwork for making diversion (road/ drain) with proper compaction and dressing during construction period to facilitate public and vehicles movement and to improve construction speed and quality without and restriction,including cost of soil, mechanical compaction, carriage 1.0 KM by tractor trolley and other all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. |
| 18 | Providing Stone ballast of size 63mm to 90mm as Sub grade/ WBM on earthen surface and well rammed to obtain maximum density including all labour, T&P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 19 | Crushed stone aggregate of size 4.75mm to 10mm as graded filler in layers of Sub grade/ WBM, including cost of all materials, labour, T&P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 20 | Removing of Dry refusal / garbage soil mixed with bolder including extra for manual lead beyond 30M upto total lead of 210M, including cost of all materials, labour, T&P etc required for proper completion of work as per direction of Engineer-in-Charge. |
| 21 | Providing and fixing of joint filler board 20 mm thick for making expantion joint including cost of all materials, labour, T&P etc. required for Proper Completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender