Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Teg At Nd (Mbi); Installation And Commissioning Of Hpac (Wp5000, Qty-02 Wp3230-500, Qty-01) Onboard Ins Teg; Service Provider - Hpac Wp5
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Teg At Nd (Mbi); Installation And Commissioning Of Hpac (Wp5000, Qty-02 Wp3230-500, Qty-01) Onboard Ins Teg; Service Provider - Hpac Wp5000 - Degutting Of Existing Hpacs, Starter And Control Panels, Drier Assemblies, Base Frames Including Cutting Of Foundations Of Each And Placing At Dockyard Jetty (Ship Side Cutting Not Included). , Manufacturing And Insitu Welding Of Foundation/ Base Frame/ Brackets/ Structural Members Required For Mounting Wp5000 Compressor And Associated Panel, Drier, Demister In Assigned Locations. , Lowering & Shifting Of Compressor/ Motor, Control Panel, Base Frame & Drier Assembly (Including Dismantling & Boxing Back On Site) , Installation Of Base Frame On Foundation Followed By Compressor, Drier And Demister Installation On Base Frame With Nut Bolts/ Mounts/ Brackets , Installation Of Sea Water Pump Of Compressor On Base Frame Including Provisioning Of Bracketing Material , Installation Of Drier Unit With Mounting Angel Followed By Templating, Manufacturing And Installation Of Hp Pipelines Between Compressor & Drier With Provisioning Of Material And Welding / Bracketing Insitu , Welding And Installation Of Control Panel With Mounting Angles And Dressing Of Cables Through Cable Trays Including Provision/ Insitu Welding Of Trays. (Supply Of Power Cable & Control Cable With Yard Scope) , Templating, Manufacturing And Installation Of Hp/ Lp Pipelines Between Air Outlet From Drier Unit To Air Bottle And Securing On Head Deck/ Bulkhead With Welded Brackets Followed By Connectorisation Of Demister , Installation Of Y - Strainer In Sea Water Line. , Stw & Commissioning Of Hpacs Followed By Hats & Mtu Trails. , Hpac Wp3230-500 - Degutting Of Existing Ek3 Hpacs, Starter And Control Panels, Drier Assemblies, Base Frames Including Cutting Of Foundations Of Each And Placing At Dockyard Jetty (Ship Side Cutting Not Included). , Manufacturing And Insitu Welding Of Foundation/ Base Frame/ Brackets/ Structural Members Required For Mounting Wp3230 Compressor And Associated Panel, Drier Etc In Assigned Locations. , Lowering & Shifting Of Compressor/ Motor, Control Panel, Base Frame & Drier Assembly (Including Dismantling & Boxing Back On Site) , Installation Of Base Frame With Mounts And Bolts. , Installation Of Compressor, Drier On Base Frames With Mounts/ Brackets & Securing With Foundation Bolt/ Brackets. , Welding And Installation Of Control Panel With Mounting Angles And Dressing Of Cables Through Cable Trays Including Provision/ Insitu Welding Of Trays. (Supply Of Power Cable & Control Cable With Yard Scope) , Templating, Manufacturing And Installation Of Hp/ Lp Pipelines Between Air Outlet From Compressor To Air Bottles And Securing On Deck Head/ Bulkhead With Welded Brackets , Stw And Commissioning Of Hpac Followed By Hats & Mtu Trails.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | HPAC WP5000 - Degutting of existing HPACs, Starter and Control panels, Drier assemblies, Base frames including cutting of foundations of each and placing at dockyard jetty (Ship side cutting not included). | HPAC WP5000 - Degutting of existing HPACs, Starter and Control panels, Drier assemblies, Base frames including cutting of foundations of each and placing at dockyard jetty (Ship side cutting not included). |
| 2 | Manufacturing and insitu welding of foundation/ base frame/ brackets/ structural members required for mounting WP5000 compressor and associated panel, drier, demister in assigned locations. | Manufacturing and insitu welding of foundation/ base frame/ brackets/ structural members required for mounting WP5000 compressor and associated panel, drier, demister in assigned locations. |
| 3 | Lowering & Shifting of compressor/ motor, control panel, base frame & drier assembly (including dismantling & boxing back on site) | Lowering & Shifting of compressor/ motor, control panel, base frame & drier assembly (including dismantling & boxing back on site) |
| 4 | Installation of base frame on foundation followed by Compressor, Drier and demister installation on base frame with nut bolts/ mounts/ brackets | Installation of base frame on foundation followed by Compressor, Drier and demister installation on base frame with nut bolts/ mounts/ brackets |
| 5 | Installation of sea water pump of compressor on base frame Including provisioning of bracketing material | Installation of sea water pump of compressor on base frame Including provisioning of bracketing material |
| 6 | Installation of drier unit with mounting angel followed by templating, manufacturing and installation of HP pipelines between compressor & drier with provisioning of material and welding / bracketing insitu | Installation of drier unit with mounting angel followed by templating, manufacturing and installation of HP pipelines between compressor & drier with provisioning of material and welding / bracketing insitu |
| 7 | Welding and Installation of Control Panel with mounting angles and dressing of cables through cable trays including provision/ insitu welding of trays. (Supply of power cable & control cable with yard scope) | Welding and Installation of Control Panel with mounting angles and dressing of cables through cable trays including provision/ insitu welding of trays. (Supply of power cable & control cable with yard scope) |
| 8 | Templating, manufacturing and installation of HP/ LP pipelines between air outlet from drier unit to air bottle and securing on head deck/ bulkhead with welded brackets followed by connectorisation of demister | Templating, manufacturing and installation of HP/ LP pipelines between air outlet from drier unit to air bottle and securing on head deck/ bulkhead with welded brackets followed by connectorisation of demister |
| 9 | Installation of Y - Strainer in sea water line. | Installation of Y - Strainer in sea water line. |
| 10 | STW & Commissioning of HPAC’s followed by HAT’s & MTU trails. | STW & Commissioning of HPAC’s followed by HAT’s & MTU trails. |
| 11 | HPAC WP3230-500 - Degutting of existing EK3 HPACs, Starter and Control panels, Drier assemblies, Base frames including cutting of foundations of each and placing at dockyard jetty (Ship side cutting not included). | HPAC WP3230-500 - Degutting of existing EK3 HPACs, Starter and Control panels, Drier assemblies, Base frames including cutting of foundations of each and placing at dockyard jetty (Ship side cutting not included). |
| 12 | Manufacturing and insitu welding of foundation/ base frame/ brackets/ structural members required for mounting WP3230 compressor and associated panel, drier etc in assigned locations. | Manufacturing and insitu welding of foundation/ base frame/ brackets/ structural members required for mounting WP3230 compressor and associated panel, drier etc in assigned locations. |
| 13 | Lowering & Shifting of compressor/ motor, control panel, base frame & drier assembly (including dismantling & boxing back on site) | Lowering & Shifting of compressor/ motor, control panel, base frame & drier assembly (including dismantling & boxing back on site) |
| 14 | Installation of base frame with mounts and bolts. | Installation of base frame with mounts and bolts. |
| 15 | Installation of Compressor, Drier on base frames with mounts/ brackets & securing with foundation bolt/ brackets. | Installation of Compressor, Drier on base frames with mounts/ brackets & securing with foundation bolt/ brackets. |
| 16 | Welding and Installation of Control Panel with mounting angles and dressing of cables through cable trays including provision/ insitu welding of trays. (Supply of power cable & control cable with yard scope) | Welding and Installation of Control Panel with mounting angles and dressing of cables through cable trays including provision/ insitu welding of trays. (Supply of power cable & control cable with yard scope) |
| 17 | Templating, manufacturing and installation of HP/ LP pipelines between air outlet from compressor to air bottles and securing on deck head/ bulkhead with welded brackets | Templating, manufacturing and installation of HP/ LP pipelines between air outlet from compressor to air bottles and securing on deck head/ bulkhead with welded brackets |
| 18 | STW and Commissioning of HPAC followed by HAT’s & MTU trails. | STW and Commissioning of HPAC followed by HAT’s & MTU trails. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender