Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships At Naval Dockyard, Mumbai/ L1 Firm Premises; 3 Years Rate Contract For Routines And Repairs On Major Firefighting And Fixed Firefig
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships At Naval Dockyard, Mumbai/ L1 Firm Premises; 3 Years Rate Contract For Routines And Repairs On Major Firefighting And Fixed Firefighting Onboard In Ship.. - Routine On Halon, Khladon And Co2 Cylinders : Degutting And Shifting Of Cylinders From Ship To Shop Floor , Retrieving Of Extinguishing Agent From Cylinders At Peso Certified Facility , Chemical Cleaning Of Cylinders At Peso Certified Facility , Endoscopy Test Of Cylinders Post Chemical Cleaning , Ultrasonic Thickness Gauging Of Cylinders , Overhauling Of Cylinder Head Valve Assembly , Hydraulic Pressure Testing Of Cylinders At Peso Certified Facility As Per Gas Cylinder Rules-2025 , Nitrogen Pressure Testing Of Cylinder Along With Head Valve Assembly , Charging Of Extinguishing Agent In Cylinder At Peso Certified Facility , Painting Of Cylinders , Regutting And Shifting Of Cylinders From Shop Floor To Ship , Routine On System Pipelines And Valve : Survey And Renewal Of System Pipelines (Dia – 10 Mm To 50 Mm) , Survey And Renewal Of System Pipelines (Dia 51 Mm To 100 Mm) , Blowing Through Of System Pipelines With Lp Air , Overhauling Of System Valves Including Removal And Fitment Onboard , Serviceability Checks Of Nozzles In The System , Welding Of Cylinders Base Plates As Per Required Position , Routines On Monitoring And Control Panel : Functional Checks Of Monitoring And Control Panels , Calibration Of Various Gauges (Pressure, Temperature, Voltage And Current) , Calibration Of System Solenoid Valves , Survey And Renewal Of Control Supply Cable , Routines On Foam Based Firefighting System: Cleaning Of Foam Compound Containing Tanks , Pressure Testing Of Foam Compound Tanks , Survey And Renewal Of Flexiable Hoses , Calibration Of Pressure Gauges , Overhauling Of Foam Generating Pump , Insitu Weighing Of Cylinders And Charging Of Gas If Required , Renewal Of System Cylinders Securing Brackets
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Routine on Halon, Khladon and CO2 cylinders : Degutting and shifting of cylinders from ship to shop floor | Routine on Halon, Khladon and CO2 cylinders : Degutting and shifting of cylinders from ship to shop floor |
| 2 | Retrieving of extinguishing agent from cylinders at PESO certified facility | Retrieving of extinguishing agent from cylinders at PESO certified facility |
| 3 | Chemical cleaning of cylinders at PESO certified facility | Chemical cleaning of cylinders at PESO certified facility |
| 4 | Endoscopy test of cylinders post chemical cleaning | Endoscopy test of cylinders post chemical cleaning |
| 5 | Ultrasonic thickness gauging of cylinders | Ultrasonic thickness gauging of cylinders |
| 6 | Overhauling of cylinder head valve assembly | Overhauling of cylinder head valve assembly |
| 7 | Hydraulic pressure testing of cylinders at PESO certified facility as per Gas cylinder rules-2025 | Hydraulic pressure testing of cylinders at PESO certified facility as per Gas cylinder rules-2025 |
| 8 | Nitrogen pressure testing of cylinder along with head valve assembly | Nitrogen pressure testing of cylinder along with head valve assembly |
| 9 | Charging of extinguishing agent in cylinder at PESO certified facility | Charging of extinguishing agent in cylinder at PESO certified facility |
| 10 | Painting of cylinders | Painting of cylinders |
| 11 | Regutting and shifting of cylinders from shop floor to ship | Regutting and shifting of cylinders from shop floor to ship |
| 12 | Routine on system pipelines and valve : Survey and Renewal of system pipelines (Dia – 10 mm to 50 mm) | Routine on system pipelines and valve : Survey and Renewal of system pipelines (Dia – 10 mm to 50 mm) |
| 13 | Survey and Renewal of system pipelines (Dia 51 mm to 100 mm) | Survey and Renewal of system pipelines (Dia 51 mm to 100 mm) |
| 14 | Blowing through of system pipelines with LP air | Blowing through of system pipelines with LP air |
| 15 | Overhauling of system valves including removal and fitment onboard | Overhauling of system valves including removal and fitment onboard |
| 16 | Serviceability checks of nozzles in the system | Serviceability checks of nozzles in the system |
| 17 | Welding of cylinders base plates as per required position | Welding of cylinders base plates as per required position |
| 18 | Routines on monitoring and control panel : Functional checks of monitoring and control panels | Routines on monitoring and control panel : Functional checks of monitoring and control panels |
| 19 | Calibration of various gauges (Pressure, temperature, voltage and current) | Calibration of various gauges (Pressure, temperature, voltage and current) |
| 20 | Calibration of system solenoid valves | Calibration of system solenoid valves |
| 21 | Survey and renewal of control supply cable | Survey and renewal of control supply cable |
| 22 | Routines on Foam based firefighting system: Cleaning of foam compound containing tanks | Routines on Foam based firefighting system: Cleaning of foam compound containing tanks |
| 23 | Pressure testing of foam compound tanks | Pressure testing of foam compound tanks |
| 24 | Survey and Renewal of flexiable hoses | Survey and Renewal of flexiable hoses |
| 25 | Calibration of pressure gauges | Calibration of pressure gauges |
| 26 | Overhauling of foam generating pump | Overhauling of foam generating pump |
| 27 | Insitu weighing of cylinders and charging of gas if required | Insitu weighing of cylinders and charging of gas if required |
| 28 | Renewal of system cylinders securing brackets | Renewal of system cylinders securing brackets |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender