Tender for Tender for Road Safety Work At 03 Crossings Ch.136.534 Dakkhana Chauraha, 136.784 Shahganj Chauraha, 136.870 Badhmandi Chauraha And 02 T-Junctions Ch. 137.470 Dariyapur Tiraha, 139.150 Payagipur On Utraula-Ayodhya-Prayagraj Road Sh-9 Under
Tender Overview
Project Description
Tender for Road Safety Work At 03 Crossings Ch.136.534 Dakkhana Chauraha, 136.784 Shahganj Chauraha, 136.870 Badhmandi Chauraha And 02 T-Junctions Ch. 137.470 Dariyapur Tiraha, 139.150 Payagipur On Utraula-Ayodhya-Prayagraj Road Sh-9 Under Provincial Division I Boq
BOQ
| Sl. No. | Item Description |
| 1 | Speed Table (Tropizoidal Hump) at Junction Point (For SH) Providing and applying Tack coat-1 with bitumren VG-10 Grade using bitumen pressure dristibutor at the rate of 0.30 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503. |
| 2 | Speed Table (Tropizoidal Hump) at Junction Point (For SH) Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 3 | Speed Table (Tropizoidal Hump) at Junction Point (For SH) Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I. |
| 4 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. complete as per direction of Engineer. |
| 5 | Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification one each side — Speed Table |
| 6 | Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification one each side — Place Identification |
| 7 | Supply and fixing of retroreflective high intensity informatory sign board/ cautionary sign board etc. As per MoRTH specification one each side — Stop Board |
| 8 | BAR MARKINGProviding and laying of hot applied thermoplastic compound 5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (Chapter-24 SI No.-3 MoRTH-803 (8.13)-Base- Two Times |
| 9 | Cats EyeSupply and fixing of Pavement Marker Type X ASTMD -4956 - 04 Avery Dennison/3m (USA Make) Consisting of ASA Plastic Housing fitted with tightly adherent Ploting compound . The Housing Shall Contain Prismatic two Glass Covered Prismatic reflective face to incident light i/c all Tax. (Chapter-24 SI No.-5 MoRTH-804 (8.35) - Suggestive |
| 10 | S/F Retro-Reflective sign Board etc complete work.Retro-reflectorised Traffic sign as per IRC-67-2012 Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67-2012 made of high intensity grade sheeting type-IV vide clause 801.3, fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory/ Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer / Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012. Legends, letters, numerals and borders etc should be as per MoRTH specification No-801.3.7 . Proof of the same in form of government report shall be uploaded while quoting tender. i) 90 cm equilateral tringle with diffinitation plate size (20cm X 60cm) . |
| 11 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 1st Year maintenance cost @ 0.00% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 12 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 2nd Year maintenance cost @ 0.25% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 13 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 3rd Year maintenance cost @ 0.50% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 14 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 4th Year maintenance cost @ 0.75% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 15 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 5th Year maintenance cost @ 1.00% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender