Supply Of Pit Traverser Capacity 150 Tonne
Tender Overview
Project Description
Supply Of pit traverser capacity 150 tonne , consumables as per clause 6.0 of section v with break up of individual items as applicable ] , optional accessories with break up of individual items as specified in clause 4.3 of section-iv ] , cost of preventive maintenance during warranty as per clause 16.3 of section v ] , cost of comprehensive amc for 5 years after the warranty as per clause 17 of section v. ] , design and supply of pit traverser capacity 150 ton and shrouded type dsl as per the anne xure attached . [ warranty period: 30 months after the date of delivery ] ] , cost of perishable and non-perishable spares required for normal maintenance to cover comp lete range of mechanical, hydraulic and electrical equipments including controls on double shift working ba sis for two years should be furnished and quoted separately. refer clause 5(section v), 5.15.1,5.15.2 and 5 .15.3 in schedule i of the bid document part - ii. ] , cost of the removal of the old ms angle dsl and the connection of the new shrouded-type d sl to both the existing 80t traverser and the new 150 t traverser. ] , cost of installation & commissioning of traverser and support masts (as per requirement spe cified in schedule-i ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Consumables as per clause 6.0 of section V with break up of individual items as applicable ] |
| 2 | Optional accessories with break up of individual items as specified in clause 4.3 of section-IV ] |
| 3 | Cost of Preventive Maintenance during Warranty as per clause 16.3 of section V ] |
| 4 | Cost of comprehensive AMC for 5 years after the warranty as per clause 17 of section V. ] |
| 5 | Design and Supply of Pit traverser capacity 150 Ton and Shrouded type DSL as per the Anne xure attached . [ Warranty Period: 30 Months after the date of delivery ] ] |
| 6 | Cost of perishable and non-perishable spares required for normal maintenance to cover comp lete range of mechanical, hydraulic and electrical equipments including controls on double shift working ba sis for two years should be furnished and quoted separately. Refer Clause 5(Section V), 5.15.1,5.15.2 and 5 .15.3 in Schedule I of the Bid document Part - II. ] |
| 7 | Cost of The removal of the old MS angle DSL and the connection of the new shrouded-type D SL to both the existing 80T traverser and the new 150 T traverser. ] |
| 8 | Cost of Installation & commissioning of Traverser and Support Masts (as per requirement spe cified in schedule-I ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 25 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender