Tender For The Construction Of A Minor Bridge (4X10M Span) Over The Pili River, Between Kabli And Bahur In The Badlapur Development Block.
Tender Overview
Project Description
Tender For The Construction Of A Minor Bridge (4X10M Span) Over The Pili River, Between Kabli And Bahur In The Badlapur Development Block.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Oct-2026 | DateCorrigendum | Date | 31-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing and Constructing Temporary Island 7.5 m diameter for Construction of Well Foundation for 4.5m dia. Well including placing of cutting age under water portion providing 40 cm. above platform from water lavel and its protection by suitable mean and also making plateform for Machinaries including etc. reqd for proper completion of the work. and also including all type of taxes but excluding cess as per specification 12.9B (Morth Specification 1200) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 2 | Providing and constructing one span service road to reach island location from one pier location to another pier location for span length 30 m, width of service road 10m and depth of water 1m including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess Data Book Sl. No. (12.9C) U/S Bridge (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 3 | Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification and including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.10 ) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 4 | Supplying, Fitting and Placing un-coated HYSD bar (TATA/SAIL Make) Reinforcement in Foundation including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per Drawing and Technical Specifications. (12.42) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 5 | Reinforced Cement Concrete, in Well curb of M 25 Gradecomplete as per Drawing and Technical Specification. including cost of grit, coarse sand from butwal quarry, all labour, T&P etc reqd. for proper completion of the work..and also including all type of taxes but excluding cess (12.11) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar (TATA/SAIL Make) Reinforcement in Well Foundation steining including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding cesscomplete as per Drawing and Technical Specifications of well steining (12.42) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 7 | Reinforced Cement Concrete, in well steining of M30 Grade complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification.(12.38B) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 8 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, and clayey soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 17 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (ii) Up to 3.00 m (12.12A+12.12B) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 9 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, and clayey soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 17 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (ii) 3.00 m to 10.00 m (12.12A+12.12B) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 10 | Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, and clayey soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 17 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (iii)10.00 m to 13.00 m (12.12A+12.12B) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 11 | Plain Cement Concrete Grade M25, in Bottom Plug with OPC complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification.(12.11C (ii)) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 12 | Plain Cement Concrete Grade M20 in Intermediate Plug with OPC complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification. (12.11D) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 13 | Plain Cement Concrete, in Top Plug OPC Grade M20 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification.(12.11E) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 14 | Sand Filling in Wells complete including cost Sand from approved quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specifications. 12.21 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 15 | Supplying, Fitting and Placing un-coated HYSD bar (TATA/SAIL Make) Reinforcement in Foundation including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding cesscomplete as per Drawing and Technical Specifications. (12.42) in well cap (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 16 | Reinforced Cement Concrete, in Well cap of M30 Grade complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification.(12.11F) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 17 | Reinforced cement concrete (with OPC 43 grade) in Abutment/Pier Shaft of RCC Grade M35 including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications (13.5H) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 18 | Supplying, fitting and placing HYSD bar (TATA/SAIL Make) reinforcement in Abutment/Pier Cap/Shaft including cost of Steel, all labour etc. reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications (13.60) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 19 | Providing weep holes in Brick Masonry/Plane /Reinforced Concrete abutmennt, wing wall /R/W with 100mm dia. AC pipe, standing through the full width of the struture with slope of 1 V to 20 Horizontal towards drawing face. Compete as per drawing and technical specification. 13.8 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 20 | Backfilling behind abutment, wing wall and return wall compete as per drwaing and technical specification. 13.9 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 21 | Providing and Fixing of in position true to line and level Neoporin Elosmaric bearing conforming to IRC:1983 (Part-II, Section IX) and Clause 2005 of MORT&H specificatios complete including all accessories as per Drawing and Technical Specfication. 13.14 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 22 | Furnishing and Placing Reinforced /Pre-stressed Cement Concrete in Deck slab of RCC Grade M30 including cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications 14.1 C (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 23 | Supplying, Fitting and Placing un-coated HYSD bar (TATA/SAIL Make) Reinforcement in Foundation including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per Drawing and Technical Specifications. (14.20) As per Standard drawing in R.C.C. Deck Slab @ 4067 kg/span For Seismic Arrester @2.5% of 6.6 cum of R.C.C. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 24 | Providing and laying Reinforced Cement concrete (with OPC 43 grade) in wearing coat of RCC Grade M-30 including reinforcement cost of grit, Sand from Dala Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specifications (14.4) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 25 | Drainage Spouts complete and also including all type of taxes but excluding cess as per drawing and Technical specification 14.9 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 26 | Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer /supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and also including all type of taxes but excluding cess complete (14.22) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 27 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification 14.8 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 28 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification 14.1 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 29 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification 14.1 (1500,1600,1700,2704) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 30 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. as per S.I. No. 251 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 31 | Providing and laying of boulder including cost of Boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25-40 kg each. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 32 | Providing and laying boulder pitching with stone boulder pitching average 30 cm thick layer over 15 cm. thick Brick ballast filter coat and 3x3 M. 1st class brick masonary in pannal including cost of all material, labour, T&P etc. requied for proper completion of the work and Morth Specification No. 2504 & Sl. NO. 15.4 but excluding cost of 1st class brick masonary. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 33 | Class 150 sub Class 'A' brick work in 1:3 cement and coarse sand mortar in foundation and plinth, including supply of all materials labour and T&P etc. required for the proper completion of the work. As per S.I. NO. 307 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 34 | Approch Road : - Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 35 | Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 36 | Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 37 | Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 38 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm and 11.2mm dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 39 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 40 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 41 | Addional Approch Road : - Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 42 | Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 43 | Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 44 | Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 45 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm and 11.2mm dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) |
| 46 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding |
| 47 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST ) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender