Railways Government Departments Closing in 12 days TDR #58129512

Supply Of Procurement of Components related to Draft Gear for Vadlapudi Project. => Limited

Issued by Government Departments · , Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Nov 2026
12 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Andhra Pradesh
EMD Exemption
Not Available
Quantity
25

Project Description

Supply Of procurement of components related to draft gear for vadlapudi project. , draft gear for boxn hl/bcnhl confirming to rdso spec. drg. no. wd-71-bd-15,(rev.1) amend.1 of oct,2016. [ warranty period: 30 months after the date of delivery ] ] , elastomer end pad (rf-9) for sl-76 draft gear as per fasl drg.no. fasl/sl/0959 or si milar. [ warranty period: 30 months after the date of delivery ] ] , poh kit no.2 of rf-361 high capacity draft gear consisting of 3 items are given below :- 1) centre wedge 30 degree to miners drg. no. miner-27607c. mat & specn :- steel forging carburiz ed hardness 550 to 683 bhn. quantity/set - 01 no. 2) shoe 30 degree to miners drg. no. miner-266 51-l-9 (ref. 26067-m) mat & specn.:- steel forging carburized hardness 440 to 494 bhn. quantity/set -10 nos. 3) top follower to miners drg. no.miner-22161-n, mat & specn.:- drop forged heat treated . quantity/set-01 no. connected to rdsos drg. no. wd-81010-s-03, alt - 12 or latest, item no. 19 an d rdsos spec.no. 49-bd-08 with amendment no.1 of sept2016. [ warranty period: 30 months afte r the date of delivery ] ] , spring seat for mk-50 draft gear ( item to be supplied with work testcertifi cate) to drg no : besco fig-20; item no.7. [ warranty period: 30 months after the date of deliver y ] ] , tapered stationary plate for mk-50 draft gear (item to be supplied with wo rk test certificate) drg.no.besco fig 02; item no.4 or equivalent, conforming to rdso str no. 4 9-bd-08. [ warranty period: 30 months after the date of delivery ] ] , poh kit for powrguard draft gear consisting of 10 items. drawing no. : as per kit detail s. material and specification : as per asfi pvt. ltd. drawing /part no. and conforming to rdsos spec. no.wd-71-bd-2015 (rev.1), of november 2017. [ warranty period: 30 months after the date of deliv ery ] ] , repair kit-a (2 items) for high capacity draft gear type mk-50 comprising of the followi ng: (i) insert (brass) besco part no. fitted with g 950 or similar quantity/kit 02 nos. (ii) shear pin (sh ortner) besco part no h 1180 or similar quantity/kit 02 nos. spec:49-bd-08 ((amend. no. 1). [ warra nty period: 30 months after the date of delivery ] ] , assembly ring for draft gear rf-361 pre shortening block to drawing no.25658 pm 2304 [ warranty period: 30 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1Draft gear for BOXN HL/BCNHL confirming to RDSO spec. Drg. No. WD-71-BD-15,(Rev.1) Amend.1 of Oct,2016. [ Warranty Period: 30 Months after the date of delivery ] ]
2Elastomer End Pad (RF-9) for SL-76 Draft Gear as per FASL DRG.NO. FASL/SL/0959 or Si milar. [ Warranty Period: 30 Months after the date of delivery ] ]
3POH kit No.2 of RF-361 High Capacity Draft Gear consisting of 3 items are given below :- 1) Centre wedge 30 degree to MINER's Drg. No. MINER-27607C. Mat & Specn :- Steel Forging Carburiz ed Hardness 550 to 683 BHN. Quantity/Set - 01 No. 2) Shoe 30 Degree to MINER's Drg. No. MINER-266 51-L-9 (Ref. 26067-M) Mat & Specn.:- Steel Forging carburized Hardness 440 to 494 BHN. Quantity/Set -10 Nos. 3) Top Follower to MINER's Drg. No.MINER-22161-N, Mat & Specn.:- Drop Forged Heat Treated . Quantity/Set-01 No. Connected to RDSO's Drg. No. WD-81010-S-03, Alt - 12 or latest, Item No. 19 an d RDSO's Spec.No. 49-BD-08 with amendment No.1 of Sept'2016. [ Warranty Period: 30 Months afte r the date of delivery ] ]
4SPRING SEAT FOR MK-50 DRAFT GEAR ( ITEM TO BE SUPPLIED WITH WORK TESTCERTIFI CATE) to DRG NO : BESCO FIG-20; ITEM No.7. [ Warranty Period: 30 Months after the date of deliver y ] ]
5TAPERED STATIONARY PLATE FOR MK-50 DRAFT GEAR (ITEM TO BE SUPPLIED WITH WO RK TEST CERTIFICATE) Drg.NO.BESCO FIG 02; ITEM NO.4 or equivalent, conforming to RDSO STR No. 4 9-BD-08. [ Warranty Period: 30 Months after the date of delivery ] ]
6POH kit for PowRGuard Draft Gear consisting of 10 items. Drawing No. : As per Kit detail s. Material and Specification : As per ASFI PVT. Ltd. Drawing /Part No. and conforming to RDSOs Spec. No.WD-71-BD-2015 (Rev.1), of November 2017. [ Warranty Period: 30 Months after the date of deliv ery ] ]
7Repair Kit-A (2 Items) for High Capacity Draft Gear Type MK-50 Comprising of the followi ng: (i) Insert (Brass) BESCO Part No. Fitted with G 950 or similar Quantity/kit 02 Nos. (ii) Shear Pin (Sh ortner) BESCO Part No H 1180 or similar Quantity/kit 02 Nos. spec:49-BD-08 ((Amend. No. 1). [ Warra nty Period: 30 Months after the date of delivery ] ]
8Assembly ring for draft gear RF-361 Pre shortening block to drawing no.25658 PM 2304 [ Warranty Period: 30 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 58129512
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 04-11-2026
Authority
Authority Name Konkan Railway Corporation Limited
Work Description Supply Of procurement of components related to draft gear for vadlapudi project. , draft gear for boxn hl/bcnhl confirming to rdso spec. drg. no. wd-71-bd-15,(rev.1) amend.1 of oct,2016. [ warranty period: 30 months after the date of delivery ] ] , elastomer end pad (rf-9) for sl-76 draft gear as per fasl drg.no. fasl/sl/0959 or si milar. [ warranty period: 30 months after the date of delivery ] ] , poh kit no.2 of rf-361 high capacity draft gear consisting of 3 items are given below :- 1) centre wedge 30 degree to miners drg. no. miner-27607c. mat & specn :- steel forging carburiz ed hardness 550 to 683 bhn. quantity/set - 01 no. 2) shoe 30 degree to miners drg. no. miner-266 51-l-9 (ref. 26067-m) mat & specn.:- steel forging carburized hardness 440 to 494 bhn. quantity/set -10 nos. 3) top follower to miners drg. no.miner-22161-n, mat & specn.:- drop forged heat treated . quantity/set-01 no. connected to rdsos drg. no. wd-81010-s-03, alt - 12 or latest, item no. 19 an d rdsos spec.no. 49-bd-08 with amendment no.1 of sept2016. [ warranty period: 30 months afte r the date of delivery ] ] , spring seat for mk-50 draft gear ( item to be supplied with work testcertifi cate) to drg no : besco fig-20; item no.7. [ warranty period: 30 months after the date of deliver y ] ] , tapered stationary plate for mk-50 draft gear (item to be supplied with wo rk test certificate) drg.no.besco fig 02; item no.4 or equivalent, conforming to rdso str no. 4 9-bd-08. [ warranty period: 30 months after the date of delivery ] ] , poh kit for powrguard draft gear consisting of 10 items. drawing no. : as per kit detail s. material and specification : as per asfi pvt. ltd. drawing /part no. and conforming to rdsos spec. no.wd-71-bd-2015 (rev.1), of november 2017. [ warranty period: 30 months after the date of deliv ery ] ] , repair kit-a (2 items) for high capacity draft gear type mk-50 comprising of the followi ng: (i) insert (brass) besco part no. fitted with g 950 or similar quantity/kit 02 nos. (ii) shear pin (sh ortner) besco part no h 1180 or similar quantity/kit 02 nos. spec:49-bd-08 ((amend. no. 1). [ warra nty period: 30 months after the date of delivery ] ] , assembly ring for draft gear rf-361 pre shortening block to drawing no.25658 pm 2304 [ warranty period: 30 months after the date of delivery ] ]
Basic Detail
Tender No VDPD-0126D0447
Bidding Type Tender
Location
City
State Andhra Pradesh
Key Dates
Publish Date 19 Oct 2026
Submission Date 04 Nov 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
4ffef6a8-1e0c-4a54-b1b6-e665f33a1f11.pdf
Bidsecuringdeclaration.pdf
Certificatebypurchaseofficerwhilepublishingtender.pdf
Declaration-HigherratesofTDSfornonfilers.pdf
InstructionstoTenderers-Updated150621.pdf
IRSKR_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 19, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
pdf

4ffef6a8-1e0c-4a54-b1b6-e665f33a1f11.pdf

pdf

Bidsecuringdeclaration.pdf

pdf

Certificatebypurchaseofficerwhilepublishingtender.pdf

pdf

Declaration-HigherratesofTDSfornonfilers.pdf

pdf

InstructionstoTenderers-Updated150621.pdf

pdf

IRSKR_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender