Bids Are invited for Construction Of Static Slithering Platform
Tender Overview
Project Description
Bids Are invited for Earth Work Mortar And Brick Work Excavation , Mild Steel Structure With Fabrication , Chequered Plates , Climbing Wall Face-1 2D Wall , Climbing Wall Face-2 3D Wall , Climbing Wall Face-3 Slithering Platform , Climbing Holds Tuv Certified Assorted , Seat Harness Full Adjustable , Screw Carabiner , Plain Carabiner , Dynamic Rope , Giri Giri Belay Device Manual , Descender Rope , Branded Carabiner , Mittins Protective Gloves For Rope , Climbing Shoes , Chalk Bag , Climbing Helmet , Overhead Roof , Transportation And Handling Includes Freight And Local Unloading At Site , Sand Pit For Safety Excavation, Border Masonry And River Sand Cushioning Layer
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Earth Work Mortar and Brick Work Excavation | Earth Work Mortar and Brick Work Excavation |
| 2 | Mild Steel Structure with Fabrication | Mild Steel Structure with Fabrication |
| 3 | Chequered Plates | Chequered Plates |
| 4 | Climbing Wall Face-1 2D Wall | Climbing Wall Face-1 2D Wall |
| 5 | Climbing Wall Face-2 3D wall | Climbing Wall Face-2 3D wall |
| 6 | Climbing Wall Face-3 Slithering Platform | Climbing Wall Face-3 Slithering Platform |
| 7 | Climbing Holds TUV Certified Assorted | Climbing Holds TUV Certified Assorted |
| 8 | Seat Harness Full adjustable | Seat Harness Full adjustable |
| 9 | Screw Carabiner | Screw Carabiner |
| 10 | Plain Carabiner | Plain Carabiner |
| 11 | Dynamic Rope | Dynamic Rope |
| 12 | Giri Giri Belay Device Manual | Giri Giri Belay Device Manual |
| 13 | Descender Rope | Descender Rope |
| 14 | Branded Carabiner | Branded Carabiner |
| 15 | Mittins Protective gloves for rope | Mittins Protective gloves for rope |
| 16 | Climbing Shoes | Climbing Shoes |
| 17 | Chalk Bag | Chalk Bag |
| 18 | Climbing Helmet | Climbing Helmet |
| 19 | Overhead Roof | Overhead Roof |
| 20 | Transportation and Handling Includes freight and local unloading at site | Transportation and Handling Includes freight and local unloading at site |
| 21 | Sand Pit for Safety Excavation, Border Masonry and River Sand Cushioning Layer | Sand Pit for Safety Excavation, Border Masonry and River Sand Cushioning Layer |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender