Tender For Construction Of Samshanghat At Ottoo Ra Nall In Village Kotli, Tehsil Sadar, District Mandi ( H.P) (Sub Head :-Construction Of Two No. Cremation Place)
Tender Value
7.01 Lakhs
Estimated cost
Bid Submission
27 Oct 2026
6 days left
EMD
14000
Bank guarantee accepted
Document Fee
350
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Mandi → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Samshanghat At Ottoo Ra Nall In Village Kotli, Tehsil Sadar, District Mandi ( H.P) (Sub Head :-Construction Of Two No. Cremation Place)
BOQ
| Sl. No. | Item Description |
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils, dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. |
| 2 | Providing and laying, mechanically mixed and vibrated cement concrete 1:4:8 (one cement : four sand : eight graded crushed stone aggregate 40 mm (forty millimeter) nominal size) in foundation and plinth including curing complete excluding the cost of form work but including carriage of material with in all leads, lift, and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mechanically mixed, vibrated and curing complete as required including carriage of materials with in all leads, lifts and other incidentals or as per the direction and to the entire satisfaction of Engineer-in-Charge. |
| 4 | Providing form work with steel plates 3.15 mm ( three point fifteen millimetre ) thick welded with angle iron in frame 30x30x5 mm (Thirty millimetre x Thirty millimetre x five millimetre) so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies in any height of propping and centering below supporting floor to ceiling upto floor all level and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of materials with in all leads, lifts and other incidentals or as per direction of Engineer-in-charge in:- |
| 5 | Foundations, footings, bases of columns, etc. for mass concrete |
| 6 | Providing tor steel reinforcement TMT bars of grade Fe-500 D or more ISI make high yield strength for reinforced cement concrete work including straightening, cutting ,bending, binding and placing in position and cost of binding wire complete up to floor all levels including carriage of material with in all leads, lifts and other incidentals complete as per direction and to the entire satisfaction of Engineer-in-Charge |
| 7 | Brick work with modular calcium silicate bricks machine moulded conforming to IS:4139, class designation 10 average compressive strength in super structure above plinth level up to floor all level in Cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete and carriage of materials with in all leads, lifts and other incidentals. |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc.complete.Hot finished welded type tubes including carriage of materials with in all leads, lifts and other incidentals as per direction by the Engineer-in-Charge. |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including carriage of materials with in all leads, lifts and other incidentals as per direction by the Engineer-in-Charge. |
| 10 | Providing and fixing 0.60 mm ( zero point sixty milimeters) thick prepainted steel sheet in roofing with hot dipped metallic zink coated sheet with top coat of regular modified polyster ( RNP ) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating including fixing with prepainted screws complete with all accesoriees as per the directon of engineer in charge including carriage of material with in all leads, lifts and other incidentals. |
| 11 | Providing and fixing ridges or hips 60 cm over all with 0.60 mm ( zero point sixty milimeters) thick prepainted steel sheet in roofing with hot dipped metallic zink coated sheet with top coat of regular modified polyster ( RNP ) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating including fixing with prepainted screws complete with all accesoriees as required as per the directon of engineer in charge including carriage of material with in all leads lifts in all floors. |
| 12 | Providing and fixing M.S BP sheet 1.66 mm to 2 mm thick in eaves board / facia / soffit / ceiling including cutting fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instructions of engineer in charge ( base members of steel work shall be measured and paid separtely including carriage of material with in all leads lifts in all floors as required as per the direction of Engineer-in-charge. |
| 13 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture including carriage of material with in all leads, lifts and other incidentals. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysOct 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender